Archived Tender

Last Updated : 06/11/2025

SERIAL NO. TENDER NUMBER TENDER DATE SHORT NOTICE INVITING BIDS CORRIGENDUM Other Tender DOCUMENTS
508/2017 NIQ NO.02/NEEPCO/AGTP/SRMC/2014-15 - (16.02 KB) 11th Jun 2014 Supply of Printer toner/ink Cartridges for AGTP.
AttachmentSize
PDF icon Cancellation Notice198.98 KB
507/2017 NIT NO.GHY/PERS/G-7(Pt)/2014/02 - (109.96 KB) 09th Jun 2014 Supply of office stationary & printing stationary articles for NEEPCO Ltd., Guwahati.
506/2017 NIQ NO.02/NEEPCO/AGTP/EM/STORE/2014-15 - (539.19 KB) 07th Jun 2014 Supply and installation of heavy duty steel rack.
505/2017 NIT NO.06/2014 - (789.22 KB) 07th Jun 2014 Repairing of A-Type Quarter No. A-Type A-53(A), A-11(B) at AGBP Colony.
504/2017 NIT NEEPCO/ED(CP)/2014-15/01 - (76.15 KB) 04th Jun 2014 Consultancy services for preparation of Risk Management Policy
AttachmentSize
PDF icon Schedule VI30.6 KB
    503/2017 NIT No. 01/2014 - (371.99 KB) 03rd Jun 2014 Operation and Maintenance including House Keeping of NEEPCO Guest House at Shillong
    502/2017 NIT No. NEEPCO/AGBP/ST &AUX/2014-15/01 - (2.7 MB) 02nd Jun 2014 Supply of Non-Ferric Alum Conforming to IS:260/1969(revised 1992) purity 16-17% as Al2 O3,Non-Ferric(Tech grade)
    501/2017 NIT No:03/SRMC/AGTP/2014-15 - (548.33 KB) 02nd Jun 2014 Renovation repair of toilet block near F&A establishment section of the administrative building at AGTP,Tripura(W)
    500/2017 NEEPCO/ED/QP/C&P/Insurance Policy/AGTP/392/2014-15/1460-80 - (75.61 KB) 30th May 2014 Limited tender for renewal of Insurance Policy of AGTP, Ramchandranagar, Tripura(West) due for renewal on 08.08.14(midnight).
    499/2017 NIT NO.TrHEP-06/2014 - (27.38 KB) 30th May 2014 Hiring of Mahindra Bolero (4x4) with AC and Power Steering.
    498/2017 NIT NO.AGBP/U&WC/2014-15/04 - (1.62 MB) 28th May 2014 Supply of electrical materials
    AttachmentSize
    PDF icon Corrigendum1 287.43 KB
    PDF icon Extension355.61 KB
    497/2017 NIB NO.95 - (709.46 KB) 28th May 2014 Supply of new Personal Computers (Desktop) and new Printers.
    AttachmentSize
    PDF icon Corrigendum No 1 53.34 KB
    PDF icon Corrigendum No 2 376.3 KB
    PDF icon Cancellation Notice304.12 KB
    496/2017 NEEPCO/ED/QP/C&P/Insurance Policy/DHEP/391/2013-14/388-401 - (89.6 KB) 27th May 2014 Limited tender for renewal of insurance policy of Doyang Hydro Electric Project(75MW) due for renewal on 31.07.2014.
    495/2017 NIQ NO.01/NEEPCO/AGTP/SRMC/2014 - (547.51 KB) 27th May 2014 Supply of Desktop PCs at AGTP.
    494/2017 NIT NO.TrHEP-05/2014 - (46.54 KB) 24th May 2014 Supply and installation of Desktop Computer, Printer, UPS & A3 Size Printer for TrHEP, Mizoram.
    AttachmentSize
    PDF icon Corrigendum23.1 KB
    493/2017 NIT NO.05/2014 - (318.25 KB) 23rd May 2014 Repairing of drain & apron of 'A' type quarter and Development of surrounding of underground reservoir etc. at AGBP.
    492/2017 NIB NO.94 - (237.38 KB) 21st May 2014 Construction of Natural Pond A1 for AGTP CC Extension Project (2x23MW), Ram Chandra Nagar, Agartala, Tripura.
    AttachmentSize
    PDF icon Cancellation Notice21.26 KB
    491/2017 NIT NO.02/SRMC/AGTP/2014-15 - (355.49 KB) 19th May 2014 Roof treatment of Power House Building of AGTP.
    AttachmentSize
    PDF icon Corrigendum-1193.43 KB
    PDF icon Corrigendum-2211.53 KB
    490/2017 NEEPCO/C&P/Gen-416/264-289 - (55.88 KB) 13th May 2014 Insurance policy for assets of 600MW KaHEP Project
    489/2017 NEEPCO/C&P/IT/417/220-240 - (68.23 KB) 07th May 2014 Renewal of Insurance policy of IT electronic assets
    488/2017 RHEP/US & W-01/2014-15 - (756.16 KB) 06th May 2014 Supply of M.S Angle & Channels at RHEP
    AttachmentSize
    PDF icon Cancellation Notice216.23 KB
    487/2017 NIQ NO.03/2014 - (1.27 MB) 05th May 2014 Supply of water supply materials for replacement of G.I. Pipes & G.I. fitting of AGBP colony.
    486/2017 NIQ NO.KHEP/2014/206 - (453.63 KB) 02nd May 2014 Supply of Consumables
    AttachmentSize
    PDF icon Corrigendum50.08 KB
    485/2017 NIT NO.KHEP/2014/207 - (125.58 KB) 02nd May 2014 Providing required number of unskilled, semi-skilled and skilled workmen for maintenance of 4x50MW Kopili Power Station.
    AttachmentSize
    PDF icon Corrigendum 81 KB
    PDF icon Corrigendum71.95 KB
    484/2017 NEEPCO/ED/QP/C&P/Insurance Policy/132kV TL/429/2014-15/118-138 - (65.63 KB) 25th Apr 2014 Limited tender for Renewal of Insurance Policy of 132kV Balipara Khuppi Kimi Transmission line, 33kV Khuppi Tenga Dam Transmission line and 33kV Tenga Dam Bichom Transmission line.
    483/2017 NIT NO.AGBP/U&WC/2014-15/02 - (1.06 MB) 24th Apr 2014 Supply of Energy saving ceiling fan and Exhaust fan.
    482/2017 NIB No.03/HoP/TC/2014-15 - (281.16 KB) 24th Apr 2014 Construction of CMD's residence of NEEPCO Ltd., Laitkor, Shillong.
    AttachmentSize
    PDF icon Corrigendum-1 207.32 KB
    PDF icon Corrigendum-2113.11 KB
    481/2017 NIB No.04/HoP/TC/2014-15 - (277.54 KB) 24th Apr 2014 Construction of Director's residence I of NEEPCO Ltd., Laitkor, Shillong.
    AttachmentSize
    PDF icon Corrigendum-1 210.65 KB
    PDF icon Corrigendum-2113.11 KB
    480/2017 NIB No.05/HoP/TC/2014-15 - (274.4 KB) 24th Apr 2014 Construction of Director's residence II of NEEPCO Ltd., Laitkor, Shillong.
    AttachmentSize
    PDF icon Corrigendum-1 213.52 KB
    PDF icon Corrigendum-2113.11 KB
    479/2017 NIB NO.02/HoP/NT/2014-15 - (279.7 KB) 22nd Apr 2014 Construction of VIP Guest House for NEEPCO Ltd., Laitkor, Shillong.
    AttachmentSize
    PDF icon Corrigendum-1 465.05 KB
    PDF icon Corrigendum-2372.28 KB
    478/2017 NIT NO.RHEP/PH&SY(O&M)/01/14-15 - (423.5 KB) 21st Apr 2014 Supply of Jellyfilled Telephone Cable and Junction Box.
    477/2017 NIT NO.AGBP/U&WC/2014-15/01 - (529.59 KB) 21st Apr 2014 Supply of ACSR weasel conductor.
    476/2017 NIT NO.KHEP/2014/205 - (106.74 KB) 19th Apr 2014 Major overhauling works in BHEL make Hydro Turbine Generator (Unit 3) of 4x50MW Kopili P.S.
    475/2017 NIT NO.02/NEEPCO/AGTP/EM/2014-15/NIT-02 - (129.97 KB) 16th Apr 2014 Supply of electrical consumable for existing lighting scheme in AGTP.
    474/2017 NIB NO.93 - (314.74 KB) 11th Apr 2014 Design, Fabrication, Supply, Erection and Commissioning of Spillway Gates in Khandong Dam of KHEP, Umrongso, Assam.
    AttachmentSize
    PDF icon Corrigendum-1 65.81 KB
    PDF icon Corrigendum-2 149.16 KB
    PDF icon Corrigendum-3 60.34 KB
    PDF icon Corrigendum-4362.96 KB
    473/2017 NIT NO.04/2014 - (790.89 KB) 11th Apr 2014 Jungle cutting, repairing of pot holes and premix surfacing on Bokuloni Chariali to Bhadoi Panchali Road.
    472/2017 NIB NO.01/MM/GHY - (580.86 KB) 11th Apr 2014 Supply of M.S. Angle for 132KV Switchyard, TrHEP, NEEPCO Ltd., Mizoram.
    AttachmentSize
    PDF icon Corrigendum393 KB
    471/2017 NIT NO.07/DGMC/AGTP-CC(EP)/2014-15 - (1.38 MB) 10th Apr 2014 Temporary sealing of underwater Lock Gate for water lightness at existing Raw Water Reservoir.
    AttachmentSize
    PDF icon Corrigendum 181.07 KB
    470/2017 NIT NO.NEEPCO/ES/R/35(A)/2014-2015/01 - (1.54 MB) 07th Apr 2014 Providing granite stone flooring including stainless steel vertical railings at the approach of main office stair case, NEEPCO, Shillong.
    469/2017 NIT NO.01/SRMC/AGTP/2014-15 - (955.49 KB) 01st Apr 2014 Supply, fitting and fixing of laminated & insulated glass partition along with the construction of half brick masonry wall.
    AttachmentSize
    PDF icon Corrigendum 199.6 KB
    PDF icon Corrigendum-2 212.42 KB
    PDF icon Corrigendum-3 190.65 KB
    PDF icon Corrigendum-4175.5 KB
    468/2017 NIT NO.01/NEEPCO/AGTP/EM/NIT#01/2014-15 - (118.02 KB) 01st Apr 2014 Disposal of used Air Filter elements/Paper Cartons.
    AttachmentSize
    PDF icon Extension Notice 1 96.32 KB
    PDF icon Extension Notice 2 92.7 KB
    PDF icon Extension Notice-3 262.38 KB
    PDF icon Extension Notice-4 112.21 KB
    PDF icon Cancellation Notice93.91 KB
    467/2017 NIQ NO.06/2014 - (74.14 KB) 31st Mar 2014 Disposal of 16(Sixteen) nos. unserviceable Vehicles & Equipments of Ranganadi H.E. Plant on "AS IS WHERE IS BASIS"
    AttachmentSize
    PDF icon Corrigendum304.07 KB
    466/2017 NIB NO 01/2014/HQ - (130.87 KB) 28th Mar 2014 Annual Maintenance Contract for Printers
    AttachmentSize
    PDF icon Corrigendum46.99 KB
    465/2017 NEEPCO/ES/R/35(A)/2013-14/07 - (63.11 KB) 26th Mar 2014 Providing laminated wooden flooring, wooden wall paneling,non-skid floor tiles at HQ
    464/2017 NIT NO.11/NEEPCO/AGTP/EM/NIT-11/2013-14 - (139.24 KB) 19th Mar 2014 Supply of Cooling Pump-motor unit for Agartala Gas Turbine Power Plant.
    463/2017 NIB NO.92 - (1.16 MB) 13th Mar 2014 Engagement of Designated Independent Agencies/Experts empanelled by CERC for vetting of Capital Cost of Pare H.E. Project.
    AttachmentSize
    PDF icon corrigendum481.2 KB
    462/2017 NIT NO.NEEPCO/ES/R/35(A)/2013-2014/06 - (1.6 MB) 12th Mar 2014 Annual Maintenance Contract for supply and maintenance of potted plants at NEEPCO Corporate office and Guest House, Shillong.
    AttachmentSize
    PDF icon Extension Notice-1300.34 KB
    461/2017 NEEPCO/ED/QP/C&P/Insurance Policy/KHEP Stage-I/388/2013-14/1776-96 - (65.43 KB) 10th Mar 2014 Limited tender for Renewal of Insurance Policy of Assets of Koplili including 1st Stage Extension, Umrangso.

    Pages