Archived Tender

Last Updated : 21/08/2025

SERIAL NO. TENDER NUMBER TENDER DATE SHORT NOTICE INVITING BIDS CORRIGENDUM Other Tender DOCUMENTS
692/2017 SNIB No.118 Dated.19/12/2014 - (85.41 KB) 19th Dec 2014 Setting up of 2 MWp Grid Interactive Solar PV Power Plant at Lanka,Nagaon District, Assam, India.
AttachmentSize
PDF icon Corrigendum 2.24 MB
PDF icon Corrigendum 2 53.55 KB
PDF icon Corrigendum 3 56.62 KB
PDF icon Corrigendum 4 634.76 KB
PDF icon corrigendum 5 56.21 KB
PDF icon Cancellation Notice494.95 KB
    691/2017 SNIT NO.02 of 2014-15/KIMI - (1.81 MB) 19th Dec 2014 Auction of damaged components of Hydraulic Excavator (M/c No.A-3968) on as is where is basis.
    690/2017 NIB 207 - (257.39 KB) 29th Jul 2016 Supply of Consumables for Photocopier machine, Fax Machine and Printer.
    AttachmentSize
    PDF icon Corrigendum 1288.06 KB
    PDF icon Corrigendum 2192.74 KB
    689/2017 NIQ NO.02/2014/HO - (1.56 MB) 19th Dec 2014 Supply of office stationary and articles for the year 2014_15 & 2015_16
    688/2017 NIT NO.14/2014/AGBP - (835.75 KB) 17th Dec 2014 Painting of Raw water pump house & clarified water pump house at plant area of AGBP.
    687/2017 NIT NO.12/NEEPCO/AGTP/EM/2014-15 - (171.93 KB) 15th Dec 2014 Supply of Consumables required for Major Inspection
    686/2017 NEEPCO/Sr.Mgr.(C)/KiHEP/Khetri/2014/NIQ NO.01 - (143.59 KB) 15th Dec 2014 Supply of Water Current Meter (cup type) with Digital Electronic Counter.
    685/2017 NIT No.117 dated 12.12.14 - (86.26 KB) 12th Dec 2014 Limited Tender for Renewal of Insurance Policy of RHEP
    684/2017 NEEPCO/ED(CP)/G-108/2014-15/1022-1025 - (241.7 KB) 11th Dec 2014 Limited tender for Due Diligence Study for Panyor H.E. Project (80MW),A.P.
    AttachmentSize
    PDF icon Corrigendum208.59 KB
    683/2017 NIB NO.1 - (68.18 KB) 10th Dec 2014 Empanelment of Advertising Agencies for Advertising, PR and other related miscellaneous activities at Corporate Office at Shillong.
    AttachmentSize
    PDF icon Corrigendum107.14 KB
    682/2017 NIT NO.11/NEEPCO/AGTP/EM/2014-15/NIT-11 - (156.07 KB) 09th Dec 2014 Supply of Coalescence Micro Fiber or equivalent Filter Elements for Franke Make Oil Mist Eliminator.
    AttachmentSize
    PDF icon Extension Notice 91.73 KB
    PDF icon Extension Notice 2 89.5 KB
    PDF icon Extension Notice 3 89.75 KB
    681/2017 NIB NO.116 - (92.9 KB) 09th Dec 2014 Renewal of Insurance Policy for the assets of Pare H.E. Project, A.P.
    AttachmentSize
    PDF icon Corrigendum 130.34 KB
    680/2017 NIB No.08/Dated 05.12.14 - (532.24 KB) 05th Dec 2014 Supply of explosives for operation of stone quarry in phased manner to TrHEP, Mizoram
    AttachmentSize
    PDF icon Corrigendum 175.28 KB
    PDF icon Corrigendum 2279.37 KB
    679/2017 NIT NO.NEEPCO/KHEP/C&P(E)/2014/214 - (125.61 KB) 05th Dec 2014 Supply and delivery of Stainless Steel Seamless pipes.
    678/2017 NIT NO.04/DGMC/AGTP/SVA/TOILET/2014-15 - (116.29 KB) 04th Dec 2014 Construction of toilet block comprising one unit of gents urinal point and one unit of W.C. etc. at Ganthalong Junior Basic School at Mandai Block, Tripura(West).
    677/2017 NIT NO.AGBP/HOP/2014-15/02 - (241.84 KB) 04th Dec 2014 Design, Engineering, Supply, Erection, Testing & Commissioning of Automatic CO2 Fire Extinguishing System.
    AttachmentSize
    PDF icon Corrigendum 476.4 KB
    PDF icon Corrigendum-2165.39 KB
    676/2017 NIT NO.03/DGMC/AGTP/SVA/TOILET/2014-15 - (115.2 KB) 03rd Dec 2014 Construction of a toilet block comprising one unit of gents urinal point and one unit of W.C. etc. at Rambhakta Para Junior Basic School of Mandai Block, Tripura (West).
    AttachmentSize
    PDF icon Corrigendum 1313.43 KB
    675/2017 NIT NO.KHEP/C&P(E)/2014/213 - (184.69 KB) 03rd Dec 2014 Supply and delivery of SS plates for Kopili P.S. of KHEP.
    AttachmentSize
    PDF icon Corrigendum102.7 KB
    674/2017 NIT NO.13/2014 - (892.67 KB) 03rd Dec 2014 Construction of Boy's and Girl's Toilet.
    AttachmentSize
    PDF icon Corrigendum 1543.76 KB
    673/2017 NIT NO.02/DGMC/AGTP/SVA/TOILET/2014-15 - (258.93 KB) 02nd Dec 2014 Construction of a toilet block comprising one unit of gents urinal point and one unit of W.C. etc. at Chintaram Para JB School of Mandai Block, Tripura (West).
    AttachmentSize
    PDF icon Corrigendum 144.94 KB
    672/2017 NIT NO.12 of 2014-15/HCMW - (209.14 KB) 28th Nov 2014 Up keep of Power House Colony at Hoz, A.P.
    671/2017 NIT NO.NEEPCO/KHEP/C&P(E)/2014/212 - (120.21 KB) 27th Nov 2014 Design, manufacture, shop testing, supply & delivery of Stainless Steel Valves as per specification and quantity required for 4x50MW Kopili Power Station.
    AttachmentSize
    PDF icon Corrigendum 113.06 KB
    PDF icon Corrigendum576.16 KB
    670/2017 NIB NO.03/GHY - (579.22 KB) 25th Nov 2014 Preparatory Technical Works for preparation of Detailed Project Report for Killing Hydro Electric Project, Assam Meghalaya Border, India (Topographical Survey & River Survey Part).
    669/2017 NIT NO.AGBP/ST&Aux/CTC/2014-15/04 - (3.79 MB) 22nd Nov 2014 Cleaning of condenser tubes.
    668/2017 NIT NO.NEEPCO/AGBP/ST&Aux/CWT/2014-15/03 - (4.14 MB) 22nd Nov 2014 Chemical Treatment of Cooling Water System.
    667/2017 NIT NO.02/2014 - (64.34 KB) 20th Nov 2014 Supply of one new Renault Duster Diesel 110 PS RxL AWD vehicle on monthly hire charge basis to be stationed at Shillong for a period of (3)three years.
    666/2017 NIB NO.NEEPCO/Sr.Mgr.(C)/KiHEP/Khetri/2014/02 - (115.05 KB) 20th Nov 2014 Supply and engagement of labour for collection and keeping records of daily Rainfall data regularly and maintaining Non recording Type Rain Gauges etc.
    AttachmentSize
    PDF icon Corrigendum 199.6 KB
    665/2017 TGBPP/HR/NIT-04/2014-15 - (1022.2 KB) 20th Nov 2014 Hiring of Vehicle Maruti Ciaz VXI (Manual) Petrol Version for TGBPP.
    664/2017 NIT 111/DGM(C)/TGBPP/2016 - (2.13 MB) 01st Aug 2016 Clearing jungles/grass surrounding the Residential and Non-residential buildings and Road sides, earth work in removing in-equalities etc of TGBPP
    663/2017 NIB NO.114 - (70.66 KB) 19th Nov 2014 Construction of CMD's Residence of NEEPCO Ltd., at Laitkor, Shillong.
    AttachmentSize
    PDF icon Corrigendum 134.65 KB
    662/2017 NIT AGBP/CWC/14 - (1.39 MB) 02nd Aug 2016 Repairing and Providing Bituminous Concrete and Seal Coat at Plant Area Road of AGBP
    AttachmentSize
    PDF icon Corrigendum357.5 KB
    661/2017 NIB NO.115 - (83.84 KB) 19th Nov 2014 Construction of Director's Residence-I of NEEPCO Ltd., at Laitkor, Shillong.
    AttachmentSize
    PDF icon Corrigendum 1 34.49 KB
    PDF icon Corrigendum 229.38 KB
    660/2017 NIB NO.112 - (105.83 KB) 18th Nov 2014 Supply of Computer Spares and Printer Consumables.
    659/2017 NIB 208 - (2.12 MB) 02nd Aug 2016 Renewal of public liability insurance policy of NEEPCO
    AttachmentSize
    PDF icon Corrigendum 135.36 KB
    658/2017 NIB NO.113 - (127.29 KB) 18th Nov 2014 Supply of New Servers.
    AttachmentSize
    PDF icon Cancellation Notice259.62 KB
    657/2017 NIB NO.56/DGM(C)/TGBPP/2014-15 - (636.65 KB) 18th Nov 2014 Development and Maintenance of Landscaping & Horticultural Works at TGBPP Campus.
    656/2017 NEEPCO/ED(MM)/GHY/T-15/2014-15/07 - (610.8 KB) 17th Nov 2014 Empanelment of "Steel Producers" for Supply of TMT Bars (Fe-500) and Structural Steel.
    655/2017 NIT NO.TrHEP-08/2014 - (46.01 KB) 13th Nov 2014 Construction of toilets/tubewell (Tarapump) against Swachh Vidhyalaya Abhiyan under Tuirial Hydro Electric Project, Mizoram.
    654/2017 NIT 49/SrM(E/M)/C&P/AGTCCPP/2016-17 - (2.2 MB) 03rd Aug 2016 Replacement of the filter media of the Water Treatment Plant at AGTCCPP Residential complex and Office complex
    AttachmentSize
    PDF icon Extension 166.7 KB
    PDF icon Extension 2480.66 KB
    PDF icon Extension 356.26 KB
    653/2017 NILT NO.02 - (3.56 MB) 13th Nov 2014 Permanent internal wiring and electrification of proposed Training Centre at Mitsubishi Campus of AGBP,NEEPCO Ltd.
    652/2017 NIT NO.NEEPCO/ES/R/35(A)/2014-2015/03 - (270.98 KB) 12th Nov 2014 Supply, transportation, fabrication and installation of Modular Partition with workstations in the HRD cell of Corporate Office, Shillong.
    651/2017 NIT NO.03/2014 - (456.91 KB) 11th Nov 2014 Topographical Survey from the toe of the Ranganadi Dam to 600m down stream of the dam on both bank of Painior river upto EL 575m at 41Km, Yazali, A.P.
    650/2017 NIT 48/SrM(E/M)/C&P/AGTCCPP/2016-17 - (2.36 MB) 03rd Aug 2016 Construction of platform surrounding the existing Store No 2 inside the Store Complex of AGTCCPP
    649/2017 NIT NO.NEEPCO/AGBP/ST&AUX/2014-15/02 - (379.17 KB) 07th Nov 2014 Supply of Tech. Grade Hydrochloric Acid, Caustic Soda Flakes etc.
    648/2017 NEEPCO/SrMgr(C)/KiHEP/Khetri/2014/01 - (109.18 KB) 30th Oct 2014 Supply of Semi-skilled workmen for observation at Gauge site
    AttachmentSize
    PDF icon Corrigendum 1 109.01 KB
    PDF icon Corrigendum 2 137.48 KB
    PDF icon Extension Notice76.46 KB
    647/2017 NIB No.109/C &P - (70.83 KB) 28th Oct 2014 Supply of new Personal Computers(Desk top) and new Printers
    AttachmentSize
    PDF icon Corrigendum 157.15 KB

    Pages