| 2660/2022 |
NIT No. Wah Umiam/T-04/2022-23/10
|
06/04/2022 |
Supply of one brand new Mahindra Bolero OPT BS6 vehicle on monthly hire charge basis for a period of 3 (three) years. |
|
|
| 2658/2022 |
NIT No. RHPS/C&P/01/2022-23
|
06/04/2022 |
Supply of Electrical Consumables for Ranganadi H.E. Plant, NEEPCO, Arunachal Pradesh |
|
|
| 2657/2022 |
NIT No. KHPS/C&P/2022-23/449
|
05/04/2022 |
Site Survey, Engineering, Supply, of Pipe Support and Hardwares, Fabrication, Installation of air discharge pipe lines at 4 x 50 MW Kopili Power Station of Kopili Hydro Power Station, NEEPCO Ltd., Umrangso, Assam. |
|
|
| 2656/2022 |
NIB No. 03/HQ
|
30/03/2022 |
Providing, fitting & fixing of false ceiling at R.R. Colony Community Hall (Ground Floor) at R.R. Colony, Shillong-793006. |
|
|
| 2655/2022 |
NIB No. 02/HQ
|
30/03/2022 |
Construction of Anganwadi Centre, Jail Road, Shillong. |
|
|
| 2654/2022 |
NIT No. 33/NEEPCO/AgGBPS/C&P/2021-22
|
30/03/2022 |
Supply and High performance anti-corrosion painting of STG-1 and STG-2 Exhaust Duct Assembly. |
|
|
| 2653/2022 |
NIT No. 32/NEEPCO/AgGBPS/C&P/2021-22
|
29/03/2022 |
Repair, Denting and Painting of 43 Nos. Electrical Feeder Panel Box (Size 4 feet x 5 feet) located at various location of Residential complex of NEEPCO, 135 MW Agartala Gas Based Power Station (AgGBPS), R.C.Nagar, Agartala, Tripura. |
|
|
| 2652/2022 |
NIT No. 31/NEEPCO/AGTCCPP/C&P/2021-22
|
28/03/2022 |
Supply and erection of new 11KV Overhead Line alongwith construction of composite LT Line connecting CST-I and CST-II with ACSR Rabbit Conductor of 135 MW Agartala Gas Based Power Station (AgGBPS),Ramchandranagar, Agartala, Tripura. |
|
|
| 2651/2022 |
NIT No. NEEPCO/HoP/Wah Umiam/T-04/2019-20/09
|
28/03/2022 |
Construction of 3(three) nos. of Bus Shed at Mawphu Village, EKH District, Meghalaya under CSR & S Scheme. |
|
|
| 2650/2022 |
NIB No. KaHEP/C&P/03
|
26/03/2022 |
Underground cable laying works for Electricity Supply Network at Permanent Colony of Kameng HEP, West Kameng Dist. Arunachal Pradesh. |
|
|
| 2649/2022 |
NIT No. 50/2021-22/HCMW
|
24/03/2022 |
Construction of office annexure building at dikrong power house complex, RHPS, Arunachal Pradesh(AP). |
|
|
| 2648/2022 |
NIB No.11/2022/GHY
|
17/03/2022 |
Construction of Entrance Gate of the Shri Sankerdev Namghar, R. G. Baruah Road, Guwahati. |
|
|
| 2647/2022 |
NIB No.10/2022/GHY
|
17/03/2022 |
Providing Floor Tiles, Grill and wall painting of Durga Puja Mandap at Sankat Mochan Ashram and Kala-Kristi Bikash Niketan, R.G. Baruah Road, Guwahati. |
|
|
| 2646/2022 |
NIB No.09/2022/GHY
|
17/03/2022 |
Construction of Toilet at Kayajeni Primary School in Kamrup (R) District, Assam.
|
|
|
| 2645/2022 |
NIB No.08/2022/GHY
|
17/03/2022 |
Construction of Toilet and Bathroom under Swach Bharat Abhiyan at Juripar Rajkhowa Namghar, Sixmile, Guwahati-22. |
|
|
| 2642/2022 |
NIT No.33/AgGBPS/CIVIL
|
09/03/2022 |
Construction of steps and shed in the cremation ground at Kheyerpur, Agartala, Tripura. |
|
|
| 2641/2022 |
NIT No. 32/AgGBPS/CIVIL
|
08/03/2022 |
Construction of cycle stand in Harinakhola High School at Mohanpur, Tripura. |
|
|
| 2640/2022 |
NIB No. 412
|
07/03/2022 |
Renewal of Group Personal Accident Insurance Policy of NEEPCO for the period 00:00 Hours of 01.05.2022 to 24:00 Hrs of 30.04.2023. |
|
|
| 2639/2022 |
NIT No. 31/AgGBPS/CIVIL
|
07/03/2022 |
Construction of cycle stand in Taranagar High School at Mohanpur, Tripura. |
|
|
| 2638/2022 |
NIT No. 30/AgGBPS/CIVIL
|
01/03/2022 |
Installation of Rooftop PVC water storage tank at Colony Complex, AgGBPS, NEEPCO Ltd., R.C. Nagar, Agartala (Phase-1,50 nos.) |
|
|
| 2637/2022 |
NIB No. NEEPCO/AGBP/CWC/2021-2022/37
|
28/02/2022 |
Construction of Class Room at Zaloni NLR 273 L.P. School, P.O. Naoholia, District Dibrugarh, Assam. |
|
|
| 2636/2022 |
NIB No. NEEPCO/AGBP/CWC/2021-2022/36
|
28/02/2022 |
Construction of Cultural Hall at Rongiliting Namghar, P.O. Bhadoi Panchali, District Dibrugarh, Assam. |
|
|
| 2635/2022 |
NIT No. NEEPCO/HoP/Wah Umiam/T-04/2021-22/08
|
28/02/2022 |
Performing day to day works viz. Cleaning, Sweeping, Mopping of the office and other work of the messenger under O/o the HoP, Wah Umiam Stage-III HEP. |
|
|
| 2634/2022 |
NIT No. NEEPCO/HOP/Wah Umiam/T-04/2021-22/07
|
28/02/2022 |
Collection of river discharge data under Wah Umiam Stage-III HEP (42.50MW x 2), Kwast Khasi Hills District, Meghalaya. |
|
|
| 2633/2022 |
NIT No. NEEPCO/HoP/Wah Umiam/T-04/2021-22/06
|
28/02/2022 |
Cleaning, Sweeping, Mopping including cooking and other kitchen works of Transit Camp at Thieddieng Village under Wah Umiam Stage-III HEP. |
|
|
| 2632/2022 |
NIT No. NEEPCO/HoP/Wah Umiam/T-04/2021-22/05
|
28/02/2022 |
Sweeping, Mopping & Maintenance of transit camp including cooking and other kitchen works at Transit Camp, Mawsynram Village under Wah Umiam Stage-III HEP. |
|
|
| 2627/2022 |
NIT No. KHPS/C&P/2021-22/447
|
28/02/2022 |
Repairing of Qtr No. D-09(A), D-04(A) and D-33(B) including fitting & fixing tiles in bathroom and kitchen, KHPS, NEEPCO Ltd. Umrongso |
|
|
| 2630/2022 |
NIB No. NEEPCO/AGBP/CWC/35
|
26/02/2022 |
Construction of Club Building of No 1 Bahoni Gaon Yobak Sangha, P.O. Bokuloni Chariali, Dist. Dibrugarh, Assam. |
|
|
| 2629/2022 |
NIB No. NEEPCO/AGBP/CWC/34
|
26/02/2022 |
Renovation / Modification of School Building of Lebangkula M.E. School, P.O. Joypur, Dist. Dibrugarh, Assam. |
|
|
| 2628/2022 |
NIB No. NEEPCO/AGBP/CWC/33
|
26/02/2022 |
Construction of Toilet and Renovation works at Rest Room of Sangay Choiling Gumba, 3 No. Chapatoli, Bhadoi Panchali, Dist. Dibrugarh, Assam. |
|
|
| 2631/2022 |
NIB No. 01/HQ
|
25/02/2022 |
Renovation and facelift expenses of the Meghalaya Bihu Sanmilan Auditorium, Stoneyland, Dhankheti, Shillong-793003, Meghalaya. |
|
|
| 2626/2022 |
NIB No. THPS-02/2022
|
22/02/2022 |
Looking for reputed, experienced & resourceful contractors / firms/Suppliers for hiring of 1 No. of Mahindra Bolero Camper Double Cabin Pickup with Power steering BS6 vehicles at Tuirial Hydro Power Station (60MW), NEEPCO Ltd., Mizoram.
|
|
|
| 2625/2022 |
NIT No. KHPS/C&P/2021-22/445
|
19/02/2022 |
SS Cladding of the existing Steel Liner in the HPT and Bifurcations of Umrong Water Condutor System under Reconstruction, Renovation and Modernization of Kopili Hydro Power Station (4 x 50 MW), District Dima Hasao, Assam. |
|
|
| 2624/2022 |
NIB NO. THPS- 01/2022
|
18/02/2022 |
Construction of 5-nos. Permanent B-Type
Residential Buildings at Tuirial Hydro Power
Station, Mizoram. |
|
|
| 2621/2022 |
NIT No. 29/AgGBPS/ClVlL/2021-22
|
11/02/2022 |
Providing, fitting and fixing of floor and wall tiles in bathrooms of A type quarters of AGTCCPP Colony Complex, NEEPCO Ltd., R.C.Nagar, Agartala, Tripura(W). |
|
|
| 2620/2022 |
NIT No. 28/AgGBPS/ClVlL/2021-22
|
11/02/2022 |
Approach road to consumable store, AgGBPS, R.C Nagar, Tripura (w). |
|
|
| 2619/2022 |
NIT No.30/NEEPCO/AgGBPS/C&P/2021-22
|
11/02/2022 |
Supply of 1(one) number of Brand New Maruti Suzuki SWIFT DZIRE VXI (Petrol) conforming to the latest version Bharat Stage IV or, higher on hire charge basis |
|
|
| 2618/2022 |
NIT No.27/AgGBPS/ClVlL/2021-22
|
10/02/2022 |
Tiles & granite works and internal painting in the kitchen of A type quarters of AGTCCPP Colony Complex, NEEPCO Ltd., R.C.Nagar, Agartala,Tripura(W). |
|
|
| 2617/2022 |
NIT No.29/NEEPCO/AqGBPS/C&P/2021-22
|
10/02/2022 |
Supply of 1(one) number of Brand New Honda City ZXMT(P) White (Petrol) conforming to the latest version Bharat Stage- IV or, higher on hire charge basis. |
|
|
| 2616/2022 |
NIT No.AGBP/ST&AUX/2021-22/13
|
10/02/2022 |
Supply of Hydrochloric Acid and Non Ferric Alum at AGBP, NEEPCO, Bokuloni, Assam |
|
|
| 2615/2022 |
NIT NO.26/AgGBPS/CIVIL/2021-22
|
09/02/2022 |
Repairing and painting alongwith roof treatment of the TSR security building and tiles flooring in operators booth at station complex , AgGBPS ,R.C.Nagar, Tripura |
|
|
| 2613/2022 |
NIT No:48/2021-22/HCMW/RHPS
|
09/02/2022 |
Construction of CC Road & CC drain along surge shaft road of RHEP, A.P at Chainage 2000.00 to 2200.00 (Ch 0.00m at TAH) Grp-6. |
|
|
| 2612/2022 |
NIT No:47/2021-22/HCMW/RHPS
|
09/02/2022 |
Construction of CC Road & CC drain along surge shaft road of RHEP, A.P at Chainage 1800.00 to 2000.00 (Ch 0.00m at TAH) Grp-5. |
|
|
| 2611/2022 |
NIT No:46/2021-22/HCMW/RHPS
|
09/02/2022 |
Construction of CC Road & CC drain along surge shaft road of RHEP, A.P at Chainage 1600.00 to 1800.00 (Ch 0.00m at TAH) Grp-4. |
|
|
| 2610/2022 |
NIT No:45/2021-22/HCMW/RHPS
|
09/02/2022 |
Construction of CC Road & CC drain along surge shaft road of RHEP, A.P at Chainage 1400.00 to 1600.00 (Ch 0.00m at TAH) Grp-3. |
|
|
| 2609/2022 |
NIT No:44/2021-22/HCMW/RHPS
|
09/02/2022 |
Construction of CC Road & CC drain along surge shaft road of RHEP, A.P at Chainage 1200.00 to 1400.00 (Ch 0.00m at TAH) Grp-2. |
|
|
| 2608/2022 |
NIT No:43/2021-22/HCMW/RHPS
|
09/02/2022 |
Construction of CC Road & CC drain along surge shaft road of RHEP, A.P at Chainage 1000.00 to 1200.00 (Ch 0.00m at TAH) Grp-1. |
|
|
| 2607/2022 |
NIT No.42/2021-22/HCMW/RHPS
|
09/02/2022 |
Construction of PCC Drain for Surge Shaft Road at Dikrong Power House site, Hoj, RHPS, A.P.(Grp-5, Ch:800.00m to Ch: 1000.00m) |
|
|
| 2606/2022 |
NIT No.41/2021-22/HCMW/RHPS
|
09/02/2022 |
Construction of PCC Drain for Surge Shaft Road at Dikrong Power House site, Hoj, RHPS, A.P.(Grp-4, Ch:600.00m to Ch: 800.00m) |
|
|
| 2605/2022 |
NIT No.40/2021-22/HCMW/RHPS
|
09/02/2022 |
Construction of PCC Drain for Surge Shaft Road at Dikrong Power House site, Hoj, RHPS, A.P.(Grp-3, Ch:400.00m to Ch: 600.00m) |
|
|