| 2825/2022 |
NIT No.62/AgGBPS
|
17/11/2022 |
Exterior repairing and painting of GT Power House at AgGBPS, R.C. Nagar, Tripura (W). |
|
|
| 2812/2022 |
NIB No. THPS-15/2022
|
15/11/2022 |
Repairing cum providing Bituminous Prime Coat & Seal Coat over Dam Top at Tuirial Hydro Power Station, Mizoram. |
|
|
| 2822/2022 |
LNIT No. RHEP/GM/26/2022-23
|
14/11/2022 |
Construction of retaining wall along the Intake road near Intake steel bridge from Ch. 0.00 m near security barrack, near Intake steel bridge, right bank, Dam site, 41 Km, Arunachal Pradesh. |
|
|
| 2821/2022 |
LNIT No. RHEP/GM/25/2022-23
|
14/11/2022 |
Restoration of road passing through the sinking zone along Pitapool Dam site road by shifting of road alignment towards hill side, RHPS, Yazali, Arunachal Pradesh (405.00m to 525.00m (Ch. 0.00 at RHPS Dam main gate)) |
|
|
| 2819/2022 |
LNIT No. RHEP/GM/23/2022-23
|
14/11/2022 |
Construction of new pedestrian road from 43 Km, NEEPCO Colony, RHPS Dam through right bank of reservoir, Yazali, Arunachal Pradesh (Ch. 11.00m to 810.00m) at Intake Gate. (Group-II) |
|
|
| 2818/2022 |
LNIT No. RHEP/GM/22/2022-23
|
14/11/2022 |
Construction of retaining wall (4th phase) at parking area of right bank of Dam towards Dam Downstream at Dam site, 41 Km, Yazali, Arunachal Pradesh. |
|
|
| 2817/2022 |
LNIT No. RHEP/GM/21/2022-23
|
14/11/2022 |
Construction of protection wall, periphery, development, drain, fencing and gate of new permanent quarter no. PB-06, 43 Km, NEEPCO Colony, Arunachal Pradesh. |
|
|
| 2816/2022 |
LNIT No. RHEP/GM/20/2022-23
|
14/11/2022 |
Construction of protection wall, periphery development, drain, fencing and gate of new permanent quarter no. PB-07, 43Km, NEEPCO Colony, RHPS, Arunachal Pradesh. |
|
|
| 2815/2022 |
LNIT No. RHEP/GM/19/2022-23
|
14/11/2022 |
Construction of vehicle parking place in between SBI, Yazali Branch and Mazid at 43Km, RHPS, NEEPCO Ltd., Arunachal Pradesh. |
|
|
| 2814/2022 |
LNIT No. RHEP/GM/18/2022-23
|
14/11/2022 |
Construction of additional Dumping Yard near the Intake, RHPS, 41Km, Yazali, Arunachal Pradesh. |
|
|
| 2810/2022 |
NIB No. THPS-14/2022
|
14/11/2022 |
Environmental Quality Monitoring at assigned locations of Tuirial Hydro Power Station, Mizoram for a period of two years w.e.f April 2023 to March 2025. |
|
|
| 2809/2022 |
NIB No. 01/2022-23
|
11/11/2022 |
Construction of Public Toilet at Shnongpdeng Village, West Jaintia Hills, District Meghalaya. |
|
|
| 2813/2022 |
NIB No. GEM/2022/B/2726646
|
10/11/2022 |
Supply of Printer toner and LAN accessories at RHPS, NEEPCO Ltd, Arunachal Pradesh |
|
|
| 2811/2022 |
NIT No. 61/AgGBPS/CIVIL
|
10/11/2022 |
Exterior painting including repairing of C-Type (C-1 to C-13) and D-Type (D-1 to D-4) at AgGBPS, R.C Nagar, Agartala, West Tripura. |
|
|
| 2808/2022 |
NIB No. GEM/2022/B/2724432
|
10/11/2022 |
Purchase of Office Stationery items at KHPS, NEEPCO Ltd., Umrongso, Dima Hasao, Assam. |
|
|
| 2807/2022 |
NIT No. KHEP/C&P/2022-23/474
|
10/11/2022 |
Construction of Stone Masonry Retaining Wall (2 Nos.) at backside hill area of Khandong Stage-II PS near Surge-Shaft Road (at Ch. 270.00M) including repairinf of dewatering outlet drain at downstream of Main road, KHPS, Umrongso. |
|
|
| 2806/2022 |
NIT No. KHEP/C&P/2022-23/473
|
10/11/2022 |
Construction of Masonry Drain (Length=75.00M) for diversion of rain water at backside hill area of Khandong Stage-II PS near Surge-Shaft Road (at Ch.270.00M) KHPS, Umrongso. |
|
|
| 2805/2022 |
NIT No. 10/HCMW/2022-23
|
07/11/2022 |
Construction of Plan-IV-4 at Dikrong power house colony, Hoj, RHPS. |
|
|
| 2804/2022 |
NIT No. 09/HCMW/2022-23
|
07/11/2022 |
Construction of Plan-IV-2 at Dikrong power house colony, Hoj, RHPS. |
|
|
| 2803/2022 |
NIT No. 08/HCMW/2022-23
|
07/11/2022 |
Construction of Plan-IV-1 at Dikrong power house colony, Hoj, RHPS. |
|
|
| 2802/2022 |
NIT No. 07/HCMW/2022-23
|
05/11/2022 |
Construction of cement concrete pavement road at newly aligned Surge Shaft road at Ch: 900.00m to 1100.00m, RHPS. |
|
|
| 2801/2022 |
NIT No. 06/HCMW/2022-23
|
05/11/2022 |
Construction of GSB and WBM on newly aligned Surge Shaft road at Ch: 900.00m to Ch: 1100.00m of Dikrong power house site, RHPS. |
|
|
| 2800/2022 |
NIT No. 05/HCMW/2022-23
|
05/11/2022 |
New formation cutting for surge shaft road realignment at chainage 900.00m to 1100.00m form Trans-Arunachal highway at Hoj, RHPS, Arunachal Pradesh. |
|
|
| 2799/2022 |
NIB No. GEM/2022/B/2704526
|
05/11/2022 |
Geophysical Investigation at Penstock area of Khandong Power Station, KHPS, Umrongso. |
|
|
| 2798/2022 |
NIT NO. RHPS/04/2022-23/HCMW
|
04/11/2022 |
Construction of NRC Building (Auditorium Cum Badminton Hall with 2 Courts) at Dikrong Power Station Site, Hoj, RHPS, AP. |
|
|
| 2797/2022 |
Bid No. GEM/2022/B/2699952
|
03/11/2022 |
OPERATION & MAINTANANCE INCLUDING HOUSE KEEPING OF NEEPCO GUEST HOUSE & OFFICE LOCATED IN DS1, MANICKTOLA CIVIC CENTRE, 1/16 VIP ROAD, KANKURGACHI, KOLKATA -700 054, WEST BENGAL |
|
|
| 2796/2022 |
NIT No. KHEP/C&P/2022-23/472
|
03/11/2022 |
Jungle Clearance of Khandong and Kopili Stage-II Power House surrounding areas and 132KV and 33KV Switch Yard including Kopili-II & Khleriat-II bays at 132KV switch yard, KHPS NEEPCO Umrongso. |
|
|
| 2792/2022 |
Bid Number: GEM/2022/B/2679002
|
27/10/2022 |
Security Audit of NEEPCO Corporate Website (https://www.neepco.co.in/) by CERT-In Empanelled auditor. |
|
|
| 2791/2022 |
NIB No. NEEPCO/AGBPS/CWC/2022-23/14
|
25/10/2022 |
Providing of PGIP Sheets of roof over the Passage between the Community Hall & Kitchen, Washing Platform and proposed Storeroom of Community Hall at Colony area of AGBPS, NEEPCO Ltd., Bokuloni, Dist. Dibrugarh, Assam. |
|
|
| 2795/2022 |
LNIT No. 08/2022-23/DPH
|
22/10/2022 |
Construction of Protection Wall Chainage no. 33RM to 50RM for 400KV GIS Bay Extension at RHPS, A.P. |
|
|
| 2794/2022 |
LNIT No. 07/2022-23/DPH
|
21/10/2022 |
Construction of Protection Wall Chainage no. 16.50RM to 33RM for 400KV GIS Bay Extension at RHPS, A.P. |
|
|
| 2793/2022 |
LNIT No. 06/2022-23/DPH
|
21/10/2022 |
Construction of Protection Wall Chainage no. 0.00RM to 16.50RM for 400KV GIS Bay Extension at RHPS, A.P. |
|
|
| 2788/2022 |
NIB No. GEM/2022/B/2668223
|
21/10/2022 |
Design Engineering Manufacturing Delivery at site erection testing commissioning and subsequent charging of the equipment to strengthen the evacuation system of Pare Hydro Power Station. |
|
|
| 2790/2022 |
NIB No. NEEPCO/AGBPS/CWC/2022-23/13
|
20/10/2022 |
Construction of Toilet at 1st Floor of Chemical Laboratory of D.M Plant and providing fitting, fixing of floor & wall tiles at corridor of CCR, lift mounted wall & floor at 0.00M & 9.00M elevation of CCR Building and floor tiles at the approach of CCR Building of AGBPS, NEEPCO Ltd., Bokuloni, District Dibrugarh Assam. |
|
|
| 2789/2022 |
NIB No. NEEPCO/AGBPS/CWC/2022-23/12
|
20/10/2022 |
Repairing and Renovation of Intake Well Pump House of AGBPS at Fakial Ghat, Joypur, District Dibrugarh, Assam. |
|
|
| 2787/2022 |
NIT No. 60/AgGBPS/CIVIL
|
18/10/2022 |
Renovation of Children Park-2 at colony complex, AgGBPS. |
|
|
| 2784/2022 |
NIB No. NEEPCO/AGBPS/CWC/2022-23/11
|
15/10/2022 |
Repairing and Renovation of Security Barrack including Kitchen and Toilet at Intake Site of AGBPS, Fakial Ghat, Joypur, District Dibrugarh, Assam. |
|
|
| 2785/2022 |
NIB No. NEEPCO/AGBPS/CWC/2022-23/10
|
14/10/2022 |
Repairing of C-Type Quarter No. C-01 at Colony area of Assam Gas Based Power Station, NEEPCO Ltd., Bokuloni, District Dibrugarh, Assam. |
|
|
| 2870/2022 |
NIT No. 59/AgGBPS/CIVIL
|
13/10/2022 |
Construction of a sitting room for Store wing, AgGBPS, NEEPCO Ltd, R.C.Nagar, Tripura(W). |
|
|
| 2783/2022 |
NIT No. 58/AgGBPS/CIVIL
|
13/10/2022 |
Construction of sedimentation tank in water treatment plant of Administrative Complex at AgGBPS, NEEPCO Ltd., R.C.Nagar, Tripura(W) |
|
|
| 2782/2022 |
NIT No: 03/2022-23/HCMW
|
13/10/2022 |
Construction of executive guest house building at Dikrong PowerHouse complex Hoj, RHPS, A.P. |
|
|
| 2781/2022 |
NIB No. GEM/2022/B/2631646
|
12/10/2022 |
Ingres RDBMS Technical Support for Kopili Hydro Power Station, Umrongso, Assam. |
|
|
| 2780/2022 |
NIT No. 57/AgGBPS/CIVIL
|
12/10/2022 |
Repairing and painting of Security Barrack near Hospital, AgGBPS, NEEPCO Ltd., R.C. Nagar, Tripura(W). |
|
|
| 2779/2022 |
NIT No. EMC/THPS/2022-23/07
|
11/10/2022 |
Permanent Internal wiring and electrification of newly constructed "A" type building (Building No. 5) at Tuirial Hydro Power Station, Mizoram. |
|
|
| 2778/2022 |
NIT No. EMC/THPS/2022-23/06
|
10/10/2022 |
Permanent Internal wiring and electrification of newly constructed "A" type building (Building No. 3 & 4) at Tuirial Hydro Power Station, Mizoram. |
|
|
| 2777/2022 |
NIT No. EMC/THPS/2022-23/05
|
10/10/2022 |
Permanent Internal wiring and electrification of newly constructed "A" type building (Building No. 1 & 2) at Tuirial Hydro Power Station, Mizoram. |
|
|
| 2776/2022 |
NIB No. GEMC-511687763410390
|
08/10/2022 |
Standard Fire and Special Perils Insurance Policy of Khandong Power Station (2X23MW), KHPS, Assam for 1 year w.e.f. 10-10-2022. |
|
|
| 2774/2022 |
NIB No. THPS-12/2022
|
28/09/2022 |
Supply of Mahindra Bolero Camper Double Cabin Pickup with power steering BS6- 1No. |
|
|
| 2773/2022 |
NIT No. KHPS/C&P/2022-23/471
|
26/09/2022 |
Site Survey Engineering Supply of Pipe support and Hardwares Fabrication Installation of Water Discharge Pipe Lines at 4x50MW Kopili Power Station of Kopili Hydro Power Station, NEEPCO Ltd., Umrangso, Assam-788931. |
|
|
| 2772/2022 |
NIT No. KHPS/C&P/2022-23/470
|
26/09/2022 |
Erection, Testing and Commissioning of Electro-Mechanical Equipment of 1x25MW Khandong Stage-II Power Station at Kopili Hydro Power Station, NEEPCO Ltd., Umrangso, Dima Hasao, Assam-788931. |
|
|