Tender

Last Updated : 25/03/2026

SERIAL NO. TENDER NUMBER TENDER DATE SHORT NOTICE INVITING BIDS CORRIGENDUM DETAILED BID DOCUMENTS
2492/2021 NIT No. KHEP/C&P/2021-22/412
AttachmentSize
PDF icon 050820210700-2492.pdf168.66 KB
05/08/2021 Repairing of Qtr. No. D-24(B), D-37(A) &D-38(A) including fitting and fixing Tiles in Bathroom & Kitchen KHEP NEEPCO Ltd. Umrongso.
AttachmentSize
PDF icon Cancellation Notice2.39 MB
2501/2021 NIB No.KaHEP/EMG/07
AttachmentSize
PDF icon 120820211500-2501.pdf29.72 KB
04/08/2021 Operation & Maintenance of Hydro-Mechanical & Electro-Mechanical Equipment/System of Bichom and Tenga Dam Complex of Kameng H.E. Project (600MW) in West Kameng District of Arunachal Pradesh.
AttachmentSize
PDF icon Corrigendum 1151.42 KB
PDF icon Corrigendum 2151.32 KB
PDF icon Corrigendum 3134.41 KB
2500/2021 NIB No.NEEPCO/AGBP/PEM/O&M-01/2021-22/02
AttachmentSize
PDF icon 110820211000-2500.pdf2.24 MB
04/08/2021 Design, Engineering, manufacturing, supply, retrofitting/erection, testing and commissioning of 14 sets 245KV CT by replacing old existing BHEL make 245KV CT at AGBP, NEEP\cO, Ltd, Bokuloni, Dibrugarh, Assam, Pin: 78619.
AttachmentSize
PDF icon Extension Notice152.73 KB
2493/2021 LNIT No.KHEP/C&P/2021-22/12
AttachmentSize
PDF icon 050820210700-2493.pdf1.9 MB
04/08/2021 Construction of DG Room Building at Kopili Power house at KHEP Umrongso, Assam.
2491/2021 NEEPCO/FIN/COMP/EOI/01
AttachmentSize
PDF icon 040820210100-2491.pdf262.06 KB
03/08/2021 Expression of Interest (EOI) for empanelment as Cost Auditors for the FY 2021-22.
AttachmentSize
PDF icon To, M/s. A.C. Dutta & Co, Cost Accountants, Kolkata 700001.1.45 MB
PDF icon To, M/s. Mani & Co, Cost Accountants, Kolkata 700029.1.44 MB
PDF icon To, M/s. Chandra Wadhwa & Co, Cost Accountants, New Delhi 110002.1.45 MB
2490/2021 NIT No.NEEPCO/AGBP/MMW/2021-22/01
AttachmentSize
PDF icon 030820211000-2490.pdf481.47 KB
03/08/2021 Disposal of Used Lube Oil and Metallic Empty Barrels” under custody of MMW on “As is where is basis” lying at AGBP, NEEPCO Ltd., P. O. Bokuloni Chariali, Dist: Dibrugarh, Assam, PIN – 786191.
2489/2021 No. KHEP/C&P/2021-22/411
AttachmentSize
PDF icon 030820210700-2489.pdf246.85 KB
03/08/2021 Requirement of Water Supply and Sanitary Materials, at Kopili Hydro Electric plant NEEPCO Ltd. Umrongso, Dima Hasao, Assam.
AttachmentSize
PDF icon Corrigendum 12.2 MB
PDF icon Corrigendum 2882.13 KB
PDF icon Corrigendum 32.43 MB
PDF icon Corrigendum 49.05 MB
2488/2021 NIB No. KaHEP/EMG/06
AttachmentSize
PDF icon 030820211500-2488.pdf29.44 KB
03/08/2021 Design, Engineering, Manufacture, Supply, Installation, Testing and Commissioning of Heavy duty Multi tier pre-fabricated Steel rack and Shelving storage System at 600 MW Kameng Hydro Electric Project, Arunachal Pradesh.
AttachmentSize
PDF icon Corrigendum 1130.46 KB
PDF icon Corrigendum 2141.89 KB
PDF icon Corrigendum 3130.29 KB
2486/2021 NIT No.NEEPCO/AGBP/ST&Aux/2021-22/03
AttachmentSize
PDF icon 280720211000-2486.pdf574.17 KB
28/07/2021 Cleaning of 3(Three) numbers of Surface Condenser Tubes of 3*30 MW Steam turbine by high pressure water jetting (Jetting shall have to be carried out in all 04(Four) Isolated chambers of the condensor at the same time round the clock with four lances to squeeze jetting time. Failure to which penalty shall be imposed on Pro rata basis for the period the contractor fails to do it so).Assam Gas Based Power Plant, Bokuloni Villaghe Dist. Dibrugarh Assam.
AttachmentSize
PDF icon Corrigendum 1183.19 KB
2485/2021 NIB No.NEEPCO/AGBP/ST&AUX/2021-22/02
AttachmentSize
PDF icon 270720211000-2485.pdf457.3 KB
27/07/2021 Remnant Life Assessment Study of 03 nos of 3X30 MW Steam Condensers at AGBP NEEPCO.
AttachmentSize
PDF icon Corrigendum1184.29 KB
2484/2021 NIT No.NEEPCO/AGBP/CWC/2021-22/06
AttachmentSize
PDF icon 270720211000-2484.pdf753.67 KB
27/07/2021 Repairing and Painting of Pre Treatment Plant Building (Chemical House)at Plant area of AGBP,NEEPCO Ltd, Bokuloni, Dist. Dibrugarh, Assam.
2483/2021 NIB No.KaHEP/EMG/05
AttachmentSize
PDF icon 230720211500-2483.pdf115.18 KB
23/07/2021 Illumination and LT Electrical Distribution System at Tenga Dam of Kameng Hydro Electric Project, West Kameng NEEPCO.
AttachmentSize
PDF icon Corrigendum 1130.18 KB
2482/2021 NIT No.26/NEEPCO/AGTCCPP/C&P/2021-2022
AttachmentSize
PDF icon 200720211100-2482.pdf2.64 MB
20/07/2021 Construction of Edge Brick Soling Paving in GBT store of Plant Complex, AGTCCPP, NEEPCO Ltd, R.C.Nagar, Agartala, Tripura(W).
2481/2021 NIT No.NEEPCO/AGBP/ST&AUX/2021-22/01
AttachmentSize
PDF icon 200720211000-2481.pdf458.96 KB
20/07/2021 In Situ Servicing/testing/setting and Popping of BHEL make Spring Loaded boiler safety Valves of HRSGs and Aux Steam Header.
AttachmentSize
PDF icon Cancellation Notices.208.74 KB
2480/2021 NIT No.25/NEEPCO/AGTCCPP/C&P/2021-2022
AttachmentSize
PDF icon 200720211100-2480.pdf2.62 MB
17/07/2021 Roof Treatment of Hospital Building at accounts office portion, AGTCCPP, NEEPCO Ltd, R.C. Nagar, Agartala, Tripura(W).
2477/2021 NIT No.24/NEEPCO/AGTCCPP/C&P/2O27-22
AttachmentSize
PDF icon 090720211100-2477.pdf5.93 MB
08/07/2021 Providing Services for Alignment and realignment of all rotating equipment and related field activities of 135 MW Agartala 6os Turbine Combined Cycle Power Plant at Ramchandranagar, Agartala - 799008, Tripura.
2479/2021 NIB No.03-21/DGM(E/M)/TGBPP/2021-22
AttachmentSize
PDF icon 090720212001-2479.pdf782.85 KB
07/07/2021 Supply, Transportation, transit insurance, delivery, loading, unloading erection and commissioning of PV Stanalone Street Lighting at 5MWp Grid Interactive Solar Plant area of TGBPP, NEEPCO, Monarchak, Tripura.
AttachmentSize
PDF icon Cancellation Notice.639.61 KB
2478/2021 NIB No.02-21/DGM(E/M)/TGBPP/2021-22 07/07/2021 Supply, Transportation, transit insurance, delivery, loading, unloading erection and commissioning - Byback of Industrial Type 2 V Lead Acid Batteries To Provide 110 V DC Supply in Solar Plant of TGBPP, NEEPCO, Monarchak, Tripura.
AttachmentSize
PDF icon Corrigendum 2718.69 KB
2475/2021 NIT No: 12 of 2021-22/HCMW
AttachmentSize
PDF icon 080720210900-2475.pdf224.33 KB
07/07/2021 Construction of cement concrete road from 33kV substation gate to Power house Gate at Dikrong Power house house, hoj, A.P. (Grp-3, ch 400.00 to 600.00m).
2474/2021 NIT No: 11 of 2021-22/HCMW
AttachmentSize
PDF icon 080720210900-2474.pdf224.31 KB
07/07/2021 Construction of cement concrete road from 33kV substation gate to Power house Gate at Dikrong Power house house, hoj, A.P. (Grp-2, ch 200.00 to 400.00m).
2473/2021 NIT No:10 of 2021-22/HCMW
AttachmentSize
PDF icon 080720210900-2473.pdf224.22 KB
07/07/2021 Construction of cement concrete road from 33kV substation gate to Power house Gate at Dikrong Power house house, hoj, A.P. (Grp-1, ch 0.00 to 200.00m).
2471/2021 NIT No.23/NEEPCO/AGTCCPP/C&P/2021-2022
AttachmentSize
PDF icon 060720211100-2471.pdf2.57 MB
03/07/2021 Construction of toilet and modification of pump house at colony complex, AGTCCPP, Ramchandra Nagar, Agartala, Tripura(W).
AttachmentSize
PDF icon Extension Notice 1188.54 KB
2470/2021 NIB No.NEEPCO/AGBP/CWC/2021-2022/05
AttachmentSize
PDF icon 050720211000-2470.pdf964.75 KB
02/07/2021 Construction of Boundary Wall for proposed Grazing Land at a Portion of NEEPCO's Acquired Land, Bokuloni, Dist. Dibrugarh Assam.
2469/2021 NIT No.22/NEEPCO/AGTCCPP/C&P/2021-22
AttachmentSize
PDF icon 030720211100-2469.pdf6.11 MB
02/07/2021 Supply, Delivery & Transportation, loading & unloading of Dosing Chemicals [Soda ash, Ammonium Alum] for NEEPCO, AGTCCPP, Ramchandra Nagar, Agartala, Tripura(W).
2466/2021 NIT No: 09 of 2021-22/HCMW
AttachmentSize
PDF icon 010720210900-2466.pdf224.08 KB
01/07/2021 Construction of RRM retaining wall for NRC ground near 132kV switchyard (Ch 0.00m near fire tank to Ch 30.00m towards plan IV).
2465/2021 NIT No: 08 of 2021-22/HCMW
AttachmentSize
PDF icon 010720210900-2465.pdf224.37 KB
01/07/2021 Construction of cement concrete road from gate near shiv mandir to SPT-C4 junction via IB & Health Centre inside dikrong power house colony hoz (Group-IV, ch 420.00m to ch 620.00m).
2464/2021 NIT No: 07 of 2021-22/HCMW
AttachmentSize
PDF icon 010720210900-2464.pdf224.25 KB
01/07/2021 Construction of cement concrete road from gate near shiv mandir to SPT-C4 junction via IB & Health Centre inside dikrong power house colony hoz (Group-III, ch 295.00m to ch 420.00m).
2463/2021 NIT No: 06 of 2021-22/HCMW
AttachmentSize
PDF icon 010720210900-2463.pdf224.29 KB
01/07/2021 Construction of cement concrete road from gate near shiv mandir to SPT-C4 junction via IB & Health Centre inside dikrong power house colony hoz (Group-II, ch 175.00m to ch 295.00m).
2462/2021 NIT No: 05 of 2021-22/HCMW
AttachmentSize
PDF icon 010720210900-2462.pdf224.17 KB
01/07/2021 Construction of cement concrete road from gate near shiv mandir to SPT-C4 junction via IB & Health Centre inside dikrong power house colony hoz (Group-I, ch 0.00m to ch 175.00m).
2467/2021 NIT NO. KHEP/C&P/2021-22/11
AttachmentSize
PDF icon 010720210700-2467.pdf1.27 MB
30/06/2021 Limited Tender For Reconstruction ,Renovation And Modernization Of Heating ,Ventilation And Air Conditioning (Hvac) Package Of 4 X 50 Mw Kopili Power Station Of Khep, Dist-Dima Hasao, Assam.
2461/2021 NIB No.NEEPCO/AGBP/CWC/2021-2022/04
AttachmentSize
PDF icon 300620211000-2461.pdf1.39 MB
29/06/2021 Construction of Security Office cum CCTV Surveillance Room adjacent to existing Security Office at Plant area of AGBP, NEEPCO Ltd, Bokuloni, Dist. Dibrugarh, Assam.
2460/2021 NIT No.21/NEEPCO/AGTCCPP/C&P/2021-2022
AttachmentSize
PDF icon 300620211100-2460.pdf2.64 MB
29/06/2021 Construction of a Barrack for Fireman at AGTCCPP, Ramchandra Nagar, Agartala, Tripura(W).
2459/2021 NIT No.20/NEEPCO/AGTCCPP/C&P/2021-22
AttachmentSize
PDF icon 290620211100-2459.pdf5.45 MB
29/06/2021 Technical Design, Manufacturing, Supply, Installation, Testing, Commissioning of Dry Type Radiator Air Cooler including provision for changing blade angles and motor speed for Gas Turbine Cooling purpose complete with Tube Bundle for existing structure as per Technical specification.
2458/2021 NIB NO. TrHEP- 13/2021
AttachmentSize
PDF icon 290620211200-2458.pdf188.06 KB
25/06/2021 Construction of 5-nos. Permanent A-Type Residential Buildings (Bldg. no. A-1 to A-5) at Tuirial Hydro Electric Project, Mizoram.
2457/2021 NIT No.AGBP/O&AWC/2021-22/01
AttachmentSize
PDF icon 260620211000-2457.pdf954.12 KB
25/06/2021 Renovation of Existing CO2 Flodding System (Fire Suppressions System) of MHI make Gas Turbine unit # 1, 2, 3 & 4 including Supply, erection, testing and commissioning with interlock protection of respective gas turbine units of Assam Gas Based Power Plant, NEEPCO Ltd, Bokuloni, Dibrugarh (Assam).
AttachmentSize
PDF icon Corrigendum 1172.7 KB
PDF icon Corrigendum 2 - Time Extension 1143.73 KB
PDF icon Corrigendum 3 - Time Extension 2195.11 KB
2454/2021 NIT No.19/NEEPCO/AGTCCPP/C&P/2021-22
AttachmentSize
PDF icon 240620211100-2454.pdf7.73 MB
23/06/2021 Technical Design, Supply, Installation, Testing, Commissioning of the online Water Flow Meter and Water Level Monitoring equipments with Telemetry System for 135 MW Agartala Gas Turbine Combined Cycle Power Plant (AGTCCPP), NEEPCO Ltd, Ramchandranagar, Tripura West.
AttachmentSize
PDF icon Corrigendum 1303.25 KB
2452/2021 NIB NO. 2
AttachmentSize
PDF icon 220620210200-2452.pdf242.26 KB
21/06/2021 Annual Maintenance Contract of Desktop PC, Printer, Scanner, Plotter etc. North Eastern Electric Power Corporation Ltd., Guwahati Office.
AttachmentSize
PDF icon Corrigendum 1259.65 KB
2450/2021 NIT No.18/NEEPCO/AGTCCPP/C&P/2021-2022
AttachmentSize
PDF icon 180620211100-2450.pdf2.7 MB
17/06/2021 Construction of Scrap Yard in 135 MW NEEPCO, AGTCCPP Power Plant area, Ramchandra Nagar, Agartala, Tripura(W).
2449/2021 NIT No.16/NEEPCO/AGTCCPP/C&P/20-21
AttachmentSize
PDF icon 160620211100-2449.pdf6.67 MB
16/06/2021 Supply, retrofitting and commissioning of Air Circuit Breakers for upgradation of SSB/EMC Panels for 135 MW_Agartala Gas Turbine Combined Cycle Power Plant (AGTCCPP), NEEPCO Ltd, Ramchandranagar, Tripura (West), compatible with existing system.
2448/2021 NIT No.17/NEEPCO/AGTCCPP/C&P/2021-2022
AttachmentSize
PDF icon 160620211100-2448.pdf2.64 MB
16/06/2021 Construction of Pavement inside the switchyard of 135 MW NEEPCO, AGTCCPP Power Plant, Ramchandra Nagar, Agartala, Tripura(W).
2456/2021 NIB No.NEEPCO/AGBP/PEM/O&M-01/2021-22/01
AttachmentSize
PDF icon 250620211000-2456.pdf326.07 KB
14/06/2021 Design, engineering, manufacturing, supply, retrofitting/erection, testing and commissioning of 14sets 245KV CT by replacing old existing BHEL make 245KV CT at AGBP, NEEPCO Ltd, Bokuloni, Dibrugarh, Assam - 786191.
AttachmentSize
PDF icon 1st Extension168.83 KB
PDF icon Cancellation Notice158.53 KB
2447/2021 NIT No.KHEP/C&P/2021-22/10
AttachmentSize
PDF icon 140620210700-2447.pdf1.84 MB
11/06/2021 Repair and or Rebuild and or Replacement, Including Design, Supply, Fabrication, Erection, Testing and Commissioning of Hydro Mechanical Components of Umrong Water Conductor System Under Re-Construction, Renovation & Modernization of KHEP (4 X 50MW), Dist-Dima Hasao, Assam, NEEPCO.
AttachmentSize
PDF icon Corrigendum 132.36 KB
PDF icon Corrigendum 232.37 KB
2451/2021 NIT No.15/NEEPCO/AGTCPP/C&P/2020-21
AttachmentSize
PDF icon 180620211100-2451.pdf4.85 MB
10/06/2021 Electrical Protection Audit at 135 MW Agartala Gas Turbine Combined Cycle Power Plant, NEEPCO Ltd, Ramchandranagar, Tripura (West).
AttachmentSize
PDF icon Corrigendum 1282.27 KB
2445/2021 NIT No.14/NEEPCO/AGTCCPP/C&P/2021-2022 08/06/2021 Annual Maintenance of Blue Star and Haier Make Ductable AC machine at various locations of NEEPCO, AGTCCPP, Ramchandra Nagar, Agartala, Tripura (W).
AttachmentSize
PDF icon 1st Extension279.15 KB
2455/2021 NIT No.12/NEEPCO/AGTCCPP/C&P/2020-21
AttachmentSize
PDF icon 240620211100-2455.pdf1.12 MB
04/06/2021 Cleaning of drains in AGTCCPP Residential Complex, NEEPCO Ltd, R.C.Nagar, Agartala, Tripura(W).
2444/2021 NIB No.NEEPCO/AGBP/CWC/2021-22/03
AttachmentSize
PDF icon 050620211000-2444.pdf707.61 KB
03/06/2021 Supply of Cement (P.P.C) for Maintenance works of AGBP, NEEPCO Ltd, Bokuloni, Dist. Dibrugarh, Assam.
AttachmentSize
PDF icon Corrigendum 1175.87 KB
PDF icon Corrigendum 2187.58 KB
PDF icon Corrigendum 3183.88 KB
2443/2021 NIT No.13/NEEPCO/AGTCCPP/C&P/2021-2022
AttachmentSize
PDF icon 030620211100-2443.pdf2.63 MB
03/06/2021 Construction of 1(One) number of cycle stand at Jagatpur High School, Mohanpur, Tripura(W), AGTCCPP NEEPCO.
AttachmentSize
PDF icon Corrigendum 1195.47 KB
2442/2021 NIT No.11/NEEPCO/AGTCCPP/C&P/2021-2022
AttachmentSize
PDF icon 020620211100-2442.pdf2.51 MB
01/06/2021 Construction of 1(One) number of Girls toilet comprising of one number of W.C and two numbers of urinals at Lembuchhara S.B. School, Jirania, Tripura(W).NEEPCO.
2441/2021 NIB No.394
AttachmentSize
PDF icon 280620210100-2441.pdf8.04 MB
01/06/2021 For Empanelment of Insurance Brokers in NEEPCO to Provide Services for Managing Insurance Portfolio of NEEPCO as an Insurance Intermediary.
AttachmentSize
PDF icon Corrigendum 1314.01 KB
PDF icon Corrigendum 21.45 MB
PDF icon Corrigendum 31.01 MB
PDF icon Cancellation Notice218.42 KB

Pages