निविदा

आखिरी अपडेट: 19/02/2020

क्रमांक निविदा संख्या निविदा दिनांक संक्षिप्त सूचना बोली निविदाएं शुद्धिपत्र विस्तृत बोली दस्तावेज
1621/2018 NIB No.50/TGBPP
AttachmentSize
PDF icon SNIB_50_TGBP_08052018316.4 KB
08/05/2018 Combution inspection of 101 MW Tripura Gas Based Power Plant, NEEPCO Ltd, Monarchak, Tripura
1627/2018 NIT No.NEEPCO/AGBP/PEM/O&M-07/18-19/01
AttachmentSize
PDF icon NIT_AGBP_PEM_01_07052018849.14 KB
07/05/2018 Design, Manufacturing, Supply, Retrofitting/Installation, Testing and Commissioning of 2 x 100KVA, 1 phase, 230V, 110V UPS system at AGBP, NEEPCO Ltd, Assam
1622/2018 NIB 49/TGBPP
AttachmentSize
PDF icon NIB 49/TGBPP462.04 KB
07/05/2018 Assistance in works for carrying out maintenance of electrical utility services in Non-Plant areas of TGBPP
1619/2018 NIB No.48/TGBPP
AttachmentSize
PDF icon NIB_No_48_TGBPP_050518311.66 KB
05/05/2018 Supply, transit insurance, transportation, loading, unloading and delivery of consumables to TGBPP, NEEPCO Ltd, Monarchak, Tripura
1618/2018 NIT No.NEEPCO/AGBP/ST&AUX/2018-19/01
AttachmentSize
PDF icon NIT_01_2018_19_AGBP_0405181.43 MB
04/05/2018 Cleaning of three(03) numbers of Surface Condenser Tubes at AGBP,Bokuloni, Assam
1617/2018 NIB No.AGBP/CWC/17
AttachmentSize
PDF icon NIB_17_AGBP_CWC_0205181.09 MB
02/05/2018 Providing 4(four) layers of ITF classified FROGG system over existing Lawn Tennis Court of AGBP, NEEPCO Ltd, Bokuloni
AttachmentSize
PDF icon Corrigendum 1226.63 KB
PDF icon Corrigendum 2223.69 KB
PDF icon Corrigendum 3386.95 KB
1612/2018 NIT No. 04/NEEPCO/AGTCCPP/C&P/2018-19
AttachmentSize
PDF icon NIT_04_AGTP_28042018262.03 KB
28/04/2018 Detailed Tender cum Auction of Old Mark – V Panels on AS IS WHERE IS BASIS and NO COMPLAINT BASIS
AttachmentSize
PDF icon Extension 2216.03 KB
PDF icon Extension 3216.25 KB
PDF icon Extension 4216.27 KB
PDF icon Extension 5229.43 KB
1611/2018 NIT No.143/DGM(C)/TGBP/2018-19
AttachmentSize
PDF icon NIT_143_TGBPP_270420185.66 MB
27/04/2018 Construction of foot path and shed from STG building to SFC building at plant of TGBPP, NEEPCO Ltd, Monarchak
1615/2018 NIT No: 03/2018-19/ HCMW
AttachmentSize
PDF icon NIT_03_Floor_Tiles_RHEP_260418462.91 KB
26/04/2018 Renovation of Permanent building No. PB-4 (A, B, C, D) by providing Floor tiles and Distempering the inside walls at Power House colony, Hoz, RHEP, A.P.
1614/2018 NIT No: 02/2018-19/ HCMW
AttachmentSize
PDF icon NIT_02_Floor_Tiles_RHEP_260418463 KB
26/04/2018 Renovation of Permanent building No. PB-3 (A, B, C, D) by providing Floor tiles and Distempering the inside walls at Power House colony, Hoz, RHEP, A.P.
1613/2018 NIT No: 01/2018-19/ HCMW
AttachmentSize
PDF icon NIT01_Floor_Tiles_RHEP_260418462.92 KB
26/04/2018 Renovation of Permanent building No. PB-1(C) and PB-2(C, D) by providing Floor tiles and Distempering the inside walls at Power House colony , Hoz, RHEP,A.P
1608/2018 NIT No.NEEPCO/ES/R/35(A)/2018-2019/01
AttachmentSize
PDF icon 250420180100-1608.pdf1.53 MB
24/04/2018 Supplying, fittings,fixing of the floor carpet, aluminium frame, wooden laminated floor, vertical blinds, repairing and raise the height of existing chain link fencing in NEEPCO, Corpoarte office Complex , Shillong
1606/2018 NIT No. KHEP/C&P/2018-19/291
AttachmentSize
PDF icon 240420180700-1606.pdf619.47 KB
24/04/2018 Design ,Engineering , Manufacture, Shop assembly ,Shop Testing, Supply ,Delivery at site ,Installation and Commission of “ Mobile type Transformer Oil Filtration Machine of capacity 2400 LPH (500GPH) for Khangdong PH of KHEP, Umrongso, Assam
AttachmentSize
PDF icon Corrigendum 1177.72 KB
1605/2018 NIT NO. TrHEP-06/2018
AttachmentSize
PDF icon 240420181200-1605.pdf157.21 KB
23/04/2018 Day to Day Repair & Maintenance of Buildings at Tuirial Hydro Electric Project, Mizoram for period of 1(one) year.
1603/2018 NIT No.KHEP/C&P/2018-19/290
AttachmentSize
PDF icon 230420180700-1603.pdf273.64 KB
21/04/2018 Construction of Open Stage at NEEPCO Recreation Club, KHEP, Umrongso
AttachmentSize
PDF icon Corrigendum 11.84 MB
PDF icon Corrigendum 2792.54 KB
PDF icon Cancellation Notice369.77 KB
1620/2018 NIQ No.AGBP/CWC/05
AttachmentSize
PDF icon NIQ_AGBP_CWC_190418593.67 KB
19/04/2018 Supply of Cement(P.P.C) for day to day building maintenance works of AGBP,NEEPCO Ltd, Bokuloni, Assam
AttachmentSize
PDF icon Corrigendum 1181.06 KB
PDF icon Corrigendum 2200.14 KB
PDF icon Corrigendum 370.35 KB
1602/2018 e-NIT No.03/NEEPCO/AGTCCPP/C&P/2018-19
AttachmentSize
PDF icon 170420181100-1602.pdf3.07 MB
17/04/2018 Construction of two numbers of retaining wall on the hill side for slope protection on the approach road to the new Guest House located in the Colony Complex of AGTCCPP
AttachmentSize
PDF icon Extension 1231.3 KB
1601/2018 e-NIT 02/NEEPCO/AGTCCPP/C&P/2018-19
AttachmentSize
PDF icon 170420181100-1601.pdf2.53 MB
13/04/2018 Construction of Courtyard in front of the New Guest House located in the colony Complex of AGTCCPP
AttachmentSize
PDF icon Extension 1229.8 KB
1600/2018 NIB 11/HQ
AttachmentSize
PDF icon 170420180100-1600.pdf742.62 KB
13/04/2018 Maintenance contract of UPS system
AttachmentSize
PDF icon Corrigendum 1233.26 KB
1599/2018 No.4/19/2017-DIPAM-IIA(Part-II)
AttachmentSize
PDF icon 160420180100-1599.pdf243.94 KB
11/04/2018 ENGAGEMENT OF BOOK RUNNING LEAD MANAGERS FOR LISTING AND DISINVESTMENT IN NORTH EASTERN ELECTRIC POWER CORPORATION LTD. (NEEPCO) OUT OF GOVERNMENT OF INDIA SHAREHOLDING OF 100% THROUGH INITIAL PUBLIC OFFERING IN THE DOMESTIC MARKET-REQUEST FOR PROPOSALS
1597/2018 NIT No.16/AGBP
AttachmentSize
PDF icon 120420181000-1597.pdf446.79 KB
11/04/2018 Painting outdoor pipeline(Gr-I), repairing & painting of security watch tower(Gr-II) and shifting of shift duty cabin(Gr-III) at AGBP, Assam
1596/2018 NIT No.141/DGM(C)/TGBP/2018-19
AttachmentSize
PDF icon 120420182001-1596.pdf2.84 MB
11/04/2018 Construction of stand-in pipe line(1KM) for providing raw water to the water treatment plant of TGBP colony, NEEPCO Ltd, Monarchak, Tripura
AttachmentSize
PDF icon Corrigendum 1939.21 KB
PDF icon Corrigendum 2966.2 KB
PDF icon Corrigendum 3555.2 KB
1595/2018 NIT No.30/2018-19/RHEP
AttachmentSize
PDF icon 110420180900-1595.pdf406.3 KB
11/04/2018 Supply of Electrical consumable items for Ranganadi H.E. Plant,Dist Lower Subansiri, Arunachal Pradesh
1598/2018 NIT No.KHEP/C&P(E)/2018/289
AttachmentSize
PDF icon 120420180700-1598.pdf268.3 KB
10/04/2018 Supply and delivery of diagnostic tools for Kopili Power Station of Kopili Hydro Electric Plant , NEEPCO Ltd. ,Umrongso, Dima Hasao District , Assam
AttachmentSize
PDF icon Corrigendum 1287.33 KB
PDF icon Corrigendum 2409.04 KB
PDF icon Cancellation Notice417.71 KB
1594/2018 NIQ No.AGBP/CWC/03/2018-19
AttachmentSize
PDF icon 100420181000-1594.pdf806.36 KB
10/04/2018 Supply of hardware materials for building maintenance works of AGBP, Assam
AttachmentSize
PDF icon Corrigendum 1199.38 KB
PDF icon Corrigendum 2196.27 KB
1592/2018 NIT No.KHEP/C&P/2018-19/288
AttachmentSize
PDF icon 100420180700-1592.pdf2.03 MB
07/04/2018 Construction Plain Cement Concrete base/ floor for Khandong Switchyard, KHEP Umrongso
AttachmentSize
PDF icon Corrigendum 1 250.07 KB
1616/2018 NIQ TrHEP-05/2018
AttachmentSize
PDF icon 030520181200-1616.pdf235.61 KB
31/03/2018 Sale and disposal of 1 (one) old 625kVA DG Set from Tuirial Hydro Electric Project, NEEPCO Ltd. Mizoram
AttachmentSize
PDF icon Corrigendum 168.48 KB
PDF icon Corrigendum 268.45 KB
1590/2018 NIT No.94/NEEPCO/AGTCCPP/C&P/2017-18
AttachmentSize
PDF icon 100420181100-1590.pdf2.57 MB
29/03/2018 Annual Maintenance of Blue Star Make Ductable AC machine at various location of NEEPCO, AGTCCPP, Agartala
AttachmentSize
PDF icon Extension 1274.41 KB
PDF icon Extension 3216.65 KB
1604/2018 NIT No.140/TGBP/2017-18
AttachmentSize
PDF icon 240420182001-1604.pdf2.85 MB
26/03/2018 Construction of boundary wall for the HOP residence at TGBP, NEEPCO
AttachmentSize
PDF icon Corrigendum 2666.18 KB
1589/2018 NIT NO.RHEP/DGM/40/2017-18
AttachmentSize
PDF icon 290320180900-1589.pdf1014.1 KB
26/03/2018 Construction of gabion structure for protection of erosion
1588/2018 NIT NO.29/2017-18
AttachmentSize
PDF icon 290320180100-1588.pdf685.01 KB
26/03/2018 Supply of 50 Nos. 10 Mtrs Long Steel Tubular Pole (in two pieces) as per IS 2713:1986 (Part-I&II)
1587/2018 NIT NO.RHEP/DGM/35/2017-18
AttachmentSize
PDF icon 290320180900-1587.pdf134.17 KB
26/03/2018 Construction of RCC drain along the recently repaired stretch of Pitapool dam-site road from chainage 0.211 Km to 0.311 Km (Group-I)
1586/2018 NIT NO.RHEP/DGM/36/2017-18
AttachmentSize
PDF icon 290320180902-1586.pdf134.17 KB
26/03/2018 Construction of RCC drain along the recently repaired stretch of Pitapool dam-site road from chainage 0.311 Km to 0.421 Km (Group-II)
1585/2018 NIT NO.RHEP/DGM/37/2017-18
AttachmentSize
PDF icon 290320180900-1585.pdf134.2 KB
26/03/2018 Construction of RCC drain along the recently repaired stretch of Pitapool dam-site road from chainage 0.421 Km to 0.531 Km (Group-III)
1584/2018 NIT NO.RHEP/DGM/38/2017-18
AttachmentSize
PDF icon 290320180900-1584.pdf134.29 KB
26/03/2018 Construction of RCC drain along the recently repaired stretch of Pitapool dam-site road from chainage 0.531 Km to 0.641 Km (Group-IV)
1583/2018 NIT NO.RHEP/DGM/39/2017-18
AttachmentSize
PDF icon 290320180900-1583.pdf134.26 KB
26/03/2018 Construction of RCC drain along the recently repaired stretch of Pitapool dam-site road from chainage 0.641 Km to 0.752 Km (Group-V)
1463/2018 NIT NO.93/NEEPCO/AGTCCPP/C&P/2017-18
AttachmentSize
PDF icon 290320181100-1463.pdf2.91 MB
26/03/2018 Maintenance of broad leaf grass turfed area
AttachmentSize
PDF icon Extension 1337.03 KB
PDF icon Extension 3231.54 KB
1459/2018 NIT No.140/DGM(C)/TGBP/2017-18
AttachmentSize
PDF icon 270320182001-1459.pdf2.85 MB
26/03/2018 Construction of boundary wall for the HOP residence at TGBP, NEEPCO
AttachmentSize
PDF icon CORNIT27032018-569.pdf176.32 KB
1582/2018 NIT No.11/2017-18/ HCMW
AttachmentSize
PDF icon 290320180100-1582.pdf652.07 KB
22/03/2018 Construction of RRM retaining wall near helipad at power house colony hoz, RHEP. (Group-I).
1581/2018 NIT No.12/2017-18/ HCMW
AttachmentSize
PDF icon 290320180100-1581.pdf652.05 KB
22/03/2018 Construction of RRM retaining wall near helipad at power house colony hoz, RHEP. (Group-II)
1580/2018 NIT No.13/2017-18/ HCMW
AttachmentSize
PDF icon 290320180100-1580.pdf652 KB
22/03/2018 Construction of RRM retaining wall near helipad at power house colony hoz, RHEP. (Group-III).
1579/2018 NIT No.14/2017-18/ HCMW
AttachmentSize
PDF icon 290320180100-1579.pdf652.1 KB
22/03/2018 Construction of RRM protection wall and CC drain in between store no. 1 & 2 of power house hoz. (Group-1).
1578/2018 NIT No.15/2017-18/ HCMW
AttachmentSize
PDF icon 290320180100-1578.pdf652.1 KB
22/03/2018 Construction of RRM protection wall and CC drain in between store no. 1 & 2 of power house hoz. (Group-2).
1577/2018 NIT No.NEEPCO/AGBP/ST&AUX/2016-17/10
AttachmentSize
PDF icon 290320181000-1577.pdf278.89 KB
21/03/2018 Chemical Treatment of cooling water system at AGBP, Bokuloni, Assam
1575/2018 NIT No.AGBP/CWC/15
AttachmentSize
PDF icon 290320181000-1575.pdf608.67 KB
21/03/2018 Removing of existing damage synthetic layer & recoating of 20mm thick premix carpeting over existing lawn tennis court of AGBP, Assam
1574/2018 NIT No.RHEP/DGM/32/2017-18
AttachmentSize
PDF icon 290320180900-1574.pdf134.29 KB
21/03/2018 Construction of RCC drain along the Pitapool dam-site road from old Gammon quarry towards the dam from chainage 0.000 Km to 0.110 Km-Type I, RHEP. (Group-I).
1573/2018 NIT No.RHEP/DGM/33/2017-18
AttachmentSize
PDF icon 290320180900-1573.pdf134.41 KB
21/03/2018 Construction of RCC drain along the Pitapool dam-site road from old Gammon quarry towards the dam from chainage 0.112 Km to 0.280 Km and again from chainage 0.282 Km to 0.330 Km-Type II, RHEP. (Group-II).
1572/2018 NIB No.274/HQ
AttachmentSize
PDF icon 290320180100-1572.pdf1.01 MB
20/03/2018 Supply of Photocopier Paper
1571/2018 NIB No.275/HQ
AttachmentSize
PDF icon 290320180100-1571.pdf1.04 MB
20/03/2018 Supply, Delivery & Installation of New Desktop PC
AttachmentSize
PDF icon Corrigendum 1368.93 KB
PDF icon Corrigendum 2226.32 KB
1570/2018 NIB No.09/IT
AttachmentSize
PDF icon 290320180100-1570.pdf489.81 KB
16/03/2018 Maintenance Contract of 5 (five) No.s of HP DL580G5 Server (Intel Xenon Quad Core, 20GB DDR2 RAM, 4 no of 72 GB, 1000 RPM HDD, Tape drive HP Storage DAT 72)
AttachmentSize
PDF icon Corrigendum 1410.85 KB
PDF icon Corrigendum 3411.61 KB
PDF icon Corrigendum 2411.2 KB

Pages