Tender

Last Updated : 25/03/2026

SERIAL NO. TENDER NUMBER TENDER DATE SHORT NOTICE INVITING BIDS CORRIGENDUM DETAILED BID DOCUMENTS
3469/2024 NIT No. PLHPS/GM(C)/143/2023-24
AttachmentSize
PDF icon 130220240900-3469.pdf1.56 MB
13/01/2024 Construction of permanent security wall and gate at downstream of Dam right bank from Ch: 194.0m to Ch: 298m (Ch: 0.0 at PLHPS Dam), Arunachal Pradesh.
3468/2024 NIT No. PLHPS/GM(C)/142/2023-24
AttachmentSize
PDF icon 130220240900-3468.pdf1.56 MB
13/01/2024 Construction of boundary wall from medical building to main Gate Ch: 0.00m to Ch: 54.7000m (Ch: 0.00 at medical gate), PLHPS, 43km colony, Arunachal Pradesh (Group-IV).
3467/2024 NIT No. PLHPS/GM(C)/141/2023-24
AttachmentSize
PDF icon 130220240900-3467.pdf1.48 MB
13/01/2024 Construction of waiting shed near Poosa at 43km NEEPCO, PLHPS, Arunachal Pradesh.
3466/2024 NIT No. PLHPS/GM(C)/140/2023-24
AttachmentSize
PDF icon 130220240900-3466.pdf1.55 MB
13/01/2024 Repairing, renovation and construction of new septic tank with soak-pit of Type-A Quarter No, 59 (Part A and B) of NEEPCO Colony, Yazali, 43Km, Arunachal Pradesh.
3405/2024 Bid Number GEM/2024/B/4462199
AttachmentSize
PDF icon 100120240800-3405.pdf88.72 KB
10/01/2024 Procurement of 1 No. Multifunction Machines MFM at Doyang Hydro Power Station
3444/2024 NIT No. PLHPS/GM(C)/138/2023-24
AttachmentSize
PDF icon 290120240900-3444.pdf1.36 MB
09/01/2024 Construction of permanent security wall at downstream of Dam right bank from CH: 94.0m to Ch: 193.5m (Ch: 0.0 at PLHPS Dam), Arunachal Pradesh.
3443/2024 NIT No. PLHPS/GM(C)/139/2023-24
AttachmentSize
PDF icon 290120240900-3443.pdf525.55 KB
09/01/2024 Construction of boundary fencing behind Sigma Camp at 41km, PLHPS Dam site, Arunachal Pradesh.
3442/2024 NIT No. PLHPS/GM(C)/136/2023-24
AttachmentSize
PDF icon 290120240900-3442.pdf525.05 KB
09/01/2024 Providing, fitting tiles and renovation of (old) Permanent A-type quarters AP-01 (A&B) at 43km NEEPCO Colony, PLHPS, Arunachal Pradesh (Group-I).
3441/2024 NIT No. PLHPS/GM(C)/137/2023-24
AttachmentSize
PDF icon 290120240900-3441.pdf520.29 KB
09/01/2024 Providing, fitting tiles and renovation of (old) Permanent A-type quarters AP-02 (A&B) at 43km NEEPCO Colony, PLHPS, Arunachal Pradesh (Group-II).
3440/2024 NIT No. PLHPS/GM(C)/135/2023-24
AttachmentSize
PDF icon 290120240900-3440.pdf518.01 KB
09/01/2024 Providing, fitting tiles and renovation of (old) Permanent A-type quarters AP-04 (A&B) at 43km NEEPCO Colony, PLHPS, Arunachal Pradesh.
3410/2024 NIB No. THPS-01/2024
AttachmentSize
PDF icon 100120241200-3410.pdf230.83 KB
09/01/2024 Hiring of 1 no. of Mahindra Bolero Single Cabin Pik up 4WD BS-VI (Diesel) at Turial Hydro Power Station.
3409/2024 NIT No. 41/2023-24/PLHPS/HCMW
AttachmentSize
PDF icon 100120240900-3409.pdf1.6 MB
08/01/2024 Construction of CC Drain and CC Flooring around New Civil Office cum Utility Office Building (Dikrong Power House Office), PLHPS, Arunachal Pradesh.
3408/2024 NIT No. 40/2023-24/PLHPS/HCMW
AttachmentSize
PDF icon 100120240900-3408.pdf1.57 MB
08/01/2024 Construction of peripheral wall around Executive Guest House at Dikrong Power House Colony, PLHPS, NEEPCO Ltd, Hoj, Arunachal Pradesh.
3407/2024 NIT No. 39/2023-24/PLHPS/HCMW
AttachmentSize
PDF icon 100120240900-3407.pdf1.52 MB
08/01/2024 Construction of GSB & WBM on approach road to Executive Guest House at Dikrong Power House Colony, PLHPS, NEEPCO Ltd, Arunachal Pradesh.
3406/2024 NIT No. 38/2023-24/PLHPS/HCMW
AttachmentSize
PDF icon 100120240900-3406.pdf1.58 MB
08/01/2024 Construction of PCC Breast Wall and CC Drain behind P.H Store at DPH, PLHPS.
3411/2024 NIB No. Tuirial HPS-01/2024
AttachmentSize
PDF icon 100120241200-3411.pdf243.83 KB
06/01/2024 Construction of concrete block pavement at front of Administrative Building and approach road to Guest House & courtyard of Tuirial Hydro Power Station, Mizoram.
3435/2024 NIT No. PLHPS/GM(C)/134/2023-24
AttachmentSize
PDF icon 240120240900-3435.pdf1.45 MB
05/01/2024 Providing left side hand railing, divider railing and other ancillary work related to new approach road and welcome gate, NEEPCO colony, Arunachal Pradesh.
3434/2024 NIT No. PLHPS/GM(C)/133/2023-24
AttachmentSize
PDF icon 240120240900-3434.pdf1.45 MB
05/01/2024 Repairing of DPH colony approach road, PLHPS, NEEPCO Ltd, Arunachal Pradesh.
3433/2024 NIT No. PLHPS/GM(C)/132/2023-24
AttachmentSize
PDF icon 240120240900-3433.pdf1.44 MB
05/01/2024 Construction of protection work along the road connecting Dam top to Dam Body in the downhill side, PLHPS, NEEPCO, Yazali, Arunachal Pradesh.
3432/2024 NIT No. PLHPS/GM(C)/131/2023-24
AttachmentSize
PDF icon 240120240900-3432.pdf1.43 MB
05/01/2024 Construction of Chain link fencing around VKV school backside and protection work rear of Laboratory of VKV School at 43km, NEEPCO Colony, Arunachal Pradesh.
3431/2024 NIT No. PLHPS/GM(C)/130/2023-24
AttachmentSize
PDF icon 240120240900-3431.pdf1.44 MB
05/01/2024 Repairing and renovating the drainage system on the rear side of A-61 to 65 and also connecting to Pai Nallah, NEEPCO Ltd, 43km, Arunachal Pradesh.
3403/2024 NIB No. 55/AGBPS
AttachmentSize
PDF icon 090120241000-3403.pdf1.54 MB
05/01/2024 Painting and exposed portion of Raw Water Pipe Line of 500mm dia and its support Structures from Plant area of AGBPS to Intake Well Pump House including Painting of RCC Bridge Railing at Intake site, Fakialghat, AGBPS, NEEPCO Ltd, Dibrugarh, Assam.
3397/2024 Bid Number GEM/2024/B/4433480
AttachmentSize
PDF icon 050120240800-3397.pdf88.91 KB
04/01/2024 Procurement of 4 Nos. Liquid Crystal Display (LCD) Panel or Monitors at Doyang Hydro Power Station.
3430/2024 NIT No. PLHPS/GM(C)/129/2023-24
AttachmentSize
PDF icon 240120240900-3430.pdf1.41 MB
02/01/2024 Providing fitting & fixing diamond chain link fencing all around SPT B-type quarter no B-23,B-24 & B-25 at 43km, PLHPS, NEEPCO Colony, Arunachal Pradesh.
3429/2024 NIT No. PLHPS/GM(C)/128/2023-24
AttachmentSize
PDF icon 240120240900-3429.pdf1.4 MB
02/01/2024 Repairing and renovation of quarters no A-17(B) along with construction of new septic tank at 43km NEEPCO Colony, PLHPS, Arunachal Pradesh.
3428/2024 NIT No. PLHPS/GM(C)/127/2023-24
AttachmentSize
PDF icon 240120240900-3428.pdf1.39 MB
02/01/2024 Providing, fitting tiles and renovation of (old) Permanent A-type quarters- AP-03 (A&B) at 43km NEEPCO Colony, PLHPS, Arunachal Pradesh, Group-I Group-III.
3427/2024 NIT No. PLHPS/GM(C)/126/2023-24
AttachmentSize
PDF icon 240120240900-3427.pdf1.42 MB
02/01/2024 Providing cement concrete footpath along the new alignment of water supply pipe line near water intake at Possa NEEPCO, Arunachal Pradesh.
3426/2024 NIT No. PLHPS/GM(C)/125/2023-24
AttachmentSize
PDF icon 240120240900-3426.pdf1.43 MB
02/01/2024 Repairing and renovating the drainage system on the rear side of A-71 to 73 and also connecting to Pai Nallah, NEEPCO Ltd, 43km, Arunachal Pradesh (Group-II).
3396/2024 NIT No. NEEPCO/AGBPS/MMW/2023-24/05
AttachmentSize
PDF icon 040120241000-3396.pdf340.28 KB
02/01/2024 Disposal of Used Lube Oil filed in metallic barrel, Metallic Barrels filled with drained liquid sludge and empty metallic barrels under custody of MMW on "as is where is basis" lying at AGBPS, NEEPCO Ltd, District, Dibrugarh, Assam.
3416/2024 NIT No. PLHPS/GM(C)/120/2023-24
AttachmentSize
PDF icon 180120240900-3416.pdf1.38 MB
28/12/2023 Construction of fence along Pitapool Dam Site road from Ch: 120m to Ch: 323m (Ch: 0.0m at PLHPS Dam entrance gate), Arunachal Pradesh.
3415/2024 NIT No. PLHPS/GM(C)/123/2023-24
AttachmentSize
PDF icon 180120240900-3415.pdf1.39 MB
28/12/2023 Construction of road connecting Dam R/bank to Dam Downstream gate, PLHPS Dam site, 41km, PLHPS, NEEPCO, Yazali, Arunachal Pradesh.
3414/2024 NIT No. PLHPS/GM(C)/124/2023-24
AttachmentSize
PDF icon 180120240900-3414.pdf1.3 MB
28/12/2023 Removal of Silt from upstream of Check Dam of Abdullah Nallah, 41km, Yazali, Arunachal Pradesh.
3413/2024 NIT No. PLHPS/GM(C)/122/2023-24
AttachmentSize
PDF icon 180120240900-3413.pdf1.39 MB
28/12/2023 Construction of permanent security wall at downstream of Dam right bank from Ch: 0.0m to Ch: 94.0m (Ch: 0.0 at PLHPS Dam), Arunachal Pradesh.
3412/2024 NIT No. PLHPS/GM(C)/121/2023-24
AttachmentSize
PDF icon 180120240900-3412.pdf1.37 MB
28/12/2023 Repairing, renovation and construction of new septic tank and soak-pit A-type Quarter No. 29 (Part-A&B) at PLHPS, NEEPCO Colony, Yazali, Arunachal Pradesh.
3385/2024 NIB No. 53/AGBPS
AttachmentSize
PDF icon 020120241000-3385.pdf1.05 MB
28/12/2023 Disposal of Earth from De-silting Basin site of raw water reservoir at plant area of AGBPS, NEEPCO Ltd, Bokuloni, District Dibrugarh, Assam.
3384/2024 Bid Number GEM/2023/B/4396982
AttachmentSize
PDF icon 020120241501-3384.pdf459.2 KB
27/12/2023 Procurement of Turbine Spares in Kameng Hydro Power Station, Kimi, West Kameng, Arunachal Pradesh.
3381/2023 NIT No. 09/2023-24/Dikrong Power House
AttachmentSize
PDF icon 271220230900-3381.pdf4.24 MB
26/12/2023 Construction of Gabian Wall for slope protection work near store building for GIS and AIS Spare at 400kV GIS Reactor Bay Extension, Dikrong Power House, Hoj, PLHPS, Arunachal Pradesh.
3378/2023 Bid Number GEM/2023/B/4347393
AttachmentSize
PDF icon 261220232800-3378.pdf110.05 KB
24/12/2023 Supply, Installation, Testing & Commissioning of 62.5 KVA DG Set with AMF panel for Tato-II HEP at Tato, Arunachal Pradesh.
3402/2024 NIT No. PLHPS/GM(C)/116/2023-24
AttachmentSize
PDF icon 090120240900-3402.pdf534.57 KB
23/12/2023 Requirement of Country Boat for Dam & INtake site, RHPS, 41Km, Yazali, Arunachal Pradesh.
3401/2024 NIT No. PLHPS/GM(C)/118/2023-24
AttachmentSize
PDF icon 090120240900-3401.pdf528.23 KB
23/12/2023 Construction of fence along Pitapool Dam site road from Ch: 1352m to Ch: 1556m (Ch: 0.0m at PLHPS Dam entrance gate), Arunachal Pradesh.
3400/2024 NIT No. PLHPS/GM(C)/119/2023-24
AttachmentSize
PDF icon 090120240900-3400.pdf533.03 KB
23/12/2023 Extension of Assembly shed and maintenance of courtyard floor of VKV school at 43Km NEEPCO Colony, Yazali, PLHPS, Arunachal Pradesh.
3399/2024 NIT No. PLHPS/GM(C)/117/2023-24
AttachmentSize
PDF icon 090120240900-3399.pdf527.04 KB
23/12/2023 Construction of Toilet at VKV field at 43km, PLHPS, NEEPCO Ltd, Arunachal Pradesh.
3398/2024 NIT No. PLHPS/GM(C)/115/2023-24
AttachmentSize
PDF icon 090120240900-3398.pdf525.6 KB
23/12/2023 Construction of protection wall near chainage 2.910km of Pitapool Damsite road (Ch: 0.00 at Dam main gate) NEEPCO Ltd, 43km, Arunachal Pradesh.
3383/2024 Bid Number GEM/2023/B/4390708
AttachmentSize
PDF icon 020120241501-3383.pdf129.47 KB
23/12/2023 Procurement of Turbine Consumables in Kameng Hydro Power Station, Kimi, West Kameng, Arunachal Pradesh.
3382/2024 Bid Number GEM/2023/B/4384282
AttachmentSize
PDF icon 020120241501-3382.pdf107.41 KB
22/12/2023 Procurement of Transformer in Kameng Hydro Power Station, Kimi, West Kameng, Arunachal Pradesh.
3379/2023 NIT No. 23/AgGBPS/C&P
AttachmentSize
PDF icon 261220231100-3379.pdf2.25 MB
22/12/2023 Construction of Pavement in front of flag hoisting platform at Admin building complex, AgGBPS, NEEPCO Ltd, R.C Nagar, Agartala.
3377/2023 Bid Number GEM/2023/B/4376683
AttachmentSize
PDF icon 221220230800-3377.pdf87.39 KB
22/12/2023 Monthly Basis Cab & Taxi Hiring Services - MUV; 2500 km x 320 hours; Outstation 24x7 One (01) No. for period of 4 (four) years at Doyang Hydro Power Station.
3371/2023 NIB No. 50/AGBPS
AttachmentSize
PDF icon 211220231000-3371.pdf1.05 MB
19/12/2023 Construction of Room for SWAS (System) of Boiler #1 & Boiler #2 at Plant area of AGBPS, NEEPCO Ltd, Bokuloni, District Dibrugarh, Assam.
3370/2023 NIB No. 49/AGBPS
AttachmentSize
PDF icon 211220231000-3370.pdf1.05 MB
19/12/2023 Unloading of Septic Tank for Residential and Non-Residential Buildings at Colony & Plant area of AGBPS, NEEPCO Ltd, District Dibrugarh, Assam.
3394/2024 NIT No. PLHPS/GM(C)/114/2023-24
AttachmentSize
PDF icon 020120240900-3394.pdf1.49 MB
18/12/2023 Providing, fitting and fixing diamond chain link fencing all around SPT A-Type Quarter No. A-48,49,50,51, & 52 (Unit A & B), 43km Colony, PLHPS, Yazali, Arunachal Pradesh.

Pages