| 3833/2024 |
NIT No. 22/2024-25/PLHPS/HCMW
|
27/12/2024 |
Renovation of main water supply line by providing RCC pedestal column supports to GI pipes from intake (Budi Nallah source) to main water storage cum supply tank to Dikrong Power Station Colony, Hoj, PLHPS, Arunachal Pradesh. |
|
|
| 3832/2024 |
NIB No. 01/GHY/2024
|
27/12/2024 |
Construction of Transit Camp-II at Cotton Road, Tezpur, Assam. |
|
|
| 3831/2024 |
NIT No. PLHPS/US&W-05/2024-25
|
27/12/2024 |
Internal Electrification of Executive Guest House Building, Power House Complex, PLHPS, Hoj, Arunachal Pradesh. |
|
|
| 3840/2025 |
Bid Number GEM/2024/B/5748166
|
24/12/2024 |
Maintenance of 33 and 11KV transmission lines and operation maintenance of indoor substation at Kameng HPS, Arunachal Pradesh. |
|
|
| 3829/2024 |
NIT No. PLHPS/US&W- 04/2024-25
|
23/12/2024 |
Re-alignment of 33KV HT Line from Location No. 09 to Location No. 13 near reservoir, PLHPS, Yazali, Arunachal Pradesh. |
|
|
| 3830/2024 |
NIB No. 11/HQ
|
20/12/2024 |
Renovation of lobby including staircase at Approach & First floors at Corporate Office building, NEEPCO, Shillong. |
|
|
| 3828/2024 |
NIT No. 20/2024-25/PLHPS/HCMW
|
20/12/2024 |
Construction of Peripheral wall and Iron Gate for New Dikrong Power House Office at Dikrong Power House Colony, PLHPS, NEEPCO Ltd, Hoj, Arunachal Pradesh. |
|
|
| 3827/2024 |
NIT No. 84/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
|
20/12/2024 |
Construction of Toe wall in the reservoir side to protect the road in the sinking zones, PLHPS, 41km, Yazali, Arunachal Pradesh. |
|
|
| 3826/2024 |
NIT No. 83/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
|
20/12/2024 |
Protection work on downhill side of road connecting Dam and Intake at a chainage of 143m from PLHPS Dam, NEEPCO, Arunachal Pradesh. |
|
|
| 3825/2024 |
NIT No. 82/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
|
20/12/2024 |
Construction of protection work (Group-I) at the downstream old Dam in right bank for protecting the approach to Dam Downstream Face, right bank, PLHPS, 41km, Yazali, Arunachal Pradesh. |
|
|
| 3824/2024 |
NIT No. 21/2024-25/PLHPS/HCMW
|
20/12/2024 |
Construction of Road and Drain below Main water storage tank leading to Hoj Baptist Church of PLHPS, Hoj, Arunachal Pradesh. |
|
|
| 3823/2024 |
NIT No. 19/2024-25/PLHPS/HCMW
|
19/12/2024 |
Construction of Cement Drain and Flooring at Executive Guest House, DPH, NEEPCO Ltd, Hoj, Arunachal Pradesh, India. |
|
|
| 3821/2024 |
NIT No. PLHPS/HOP/05/2024-25
|
19/12/2024 |
Supply of vehicle- Mahindra Bolero Model No- B6 Opt (BS6) on hired charge basis along with driver for Panyor Lower Hydro Power Station, NEEPCO, Hoj, Arunachal Pradesh. |
|
|
| 3817/2024 |
NIB No. 10/HQ
|
17/12/2024 |
Exterior wall painting including necessary repairing works of IT Building-II, Security Barrack and Sub Station at Corporate Head Quarter, Shillong. |
|
|
| 3816/2024 |
NIB No. 09/HQ
|
17/12/2024 |
Exterior wall painting including necessary repairing works of C&P Building and Staff Quarter, Corporate Head Quarter, Shillong. |
|
|
| 3815/2024 |
NIB No. 08/HQ
|
17/12/2024 |
Outside wall painting including repairing at 'C' type office building, NEEPCO Corporate Office building, Shillong. |
|
|
| 3814/2024 |
NIB No. 07/HQ
|
17/12/2024 |
Outside wall painting including repairing at main office building, NEEPCO Corporate Office building, Shillong. |
|
|
| 3820/2024 |
NIT No. 81/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
|
16/12/2024 |
Channelizing of Pai Stream & Protection of stream banks from DPH bailey bridge upto NRC Auditorium, 43km, PLHPS, NEEPCO Ltd, Arunachal Pradesh. |
|
|
| 3819/2024 |
NIT No. 80/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
|
16/12/2024 |
Construction of Check Dam at Peil stream near PLHPS reservoir rim, NEEPCO Ltd, Arunachal Pradesh. |
|
|
| 3818/2024 |
NIT No. 79/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
|
16/12/2024 |
Construction of Check Dam at Pesse Mallah on left bank of PLHPS reservoir, NEEPCO Ltd, Arunachal Pradesh. |
|
|
| 3812/2024 |
Bid Number GEM/2024/B/5692577
|
11/12/2024 |
Project Management Consultancy Services for Heo (240 MW) Hydro Electric Project, Arunachal Pradesh. |
|
|
| 3813/2024 |
NIT NO. 18/2024-25/PLHPS/HCMW
|
10/12/2024 |
Construction of RCC Intake structure at Budi Nallah for water supply to Dikrong Power Station colony, Hoj, PLHPS, Arunachal Pradesh. |
|
|
| 3808/2024 |
NIT No. 05/AgGBPS/C&P
|
10/12/2024 |
Repairing of existing road at Power House and Administrative Building Complex, AgGBPS, NEEPCO Ltd, R.C Nagar, Tripura(W). |
|
|
| 3809/2024 |
NIT No. 17/2024-25/PLHPS/HCMW
|
06/12/2024 |
Temporary barrier to prevent backflow of river water to the tail pool at Dikrong Power House, Hoj, Arunachal Pradesh. |
|
|
| 3888/2025 |
NIT No. KHPS/C&P/2024-25/498
|
04/12/2024 |
Extension of Activity Hall Building at VKV School, KHPS, Umrangso. |
|
|
| 3797/2024 |
NIT NO.KHPS/C&P/2024-25/498
|
04/12/2024 |
Repairing of Non-Functional School Toilets constructed under Swachh Vidyalaya Abhiyan by KHPS during FY 2014-15 & 2015-16
|
|
|
| 3798/2024 |
NIB NO.468
|
03/12/2024 |
Empanelment of Insurance Brokers in NEEPCO to provide Services for managing insurance portfolio of NEEPCO as Insurance Intermediary |
|
|
| 3810/2024 |
NIT No. 72/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
|
30/11/2024 |
Construction of Boundary wall from D type Main Gate to D-6 Quarter Ch: 126.25m to Ch: 253.75m toward backside to main gate (Ch: 0.00 at D-6), PLHPS, 43km Colony, Arunachal Pradesh. |
|
|
| 3806/2024 |
NIT No. 77/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
|
30/11/2024 |
Construction of breast wall near Dam site road from Ch: 752.00 to Ch: 777.5 (From Ch:0.00 at Dam main gate) NEEPCO Ltd, 43km, Kenyi Panyor, Arunachal Pradesh. |
|
|
| 3805/2024 |
NIT No. 76/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
|
30/11/2024 |
Construction of protection gabion wall near Dam site road from Ch: 672.00m to Ch: 727.00m (From Ch: 0.00m at dam main gate), NEEPCO Ltd, 43km, Kenyi Panyor, Arunachal Pradesh. |
|
|
| 3804/2024 |
NIT No. 75/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
|
30/11/2024 |
Providing protection works at left side of DPH road, very adjacent to Bailey Bridge at PLHPS, NEEPCO Ltd, Arunachal Pradesh. |
|
|
| 3803/2024 |
NIT No. 74/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
|
30/11/2024 |
Construction of Boundary wall near main gate toward reservoir (Left side) Ch: 0.00 to 35.80 meter (Ch:0.00 meter main gate), PLHPS, 43km colony, Arunachal Pradesh. |
|
|
| 3802/2024 |
NIT No. 73/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
|
30/11/2024 |
Construction of Boundary wall from D type Main Gate to D-6 Quarter Ch: 0.00 to Ch:126.25m towards backside to main gate (Ch: 0.00 at D-6), PLHPS, 43km Colony, Arunachal Pradesh (Group-II). |
|
|
| 3801/2024 |
NIT No. 71/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
|
30/11/2024 |
Construction of Boundary wall covering Backside of DPH, fuel tank and CPD office, PLHPS, 43km Colony, Arunachal Pradesh. |
|
|
| 3800/2024 |
NIT No. 70/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
|
30/11/2024 |
Construction of gabion structure for preventing soil erosion and protection of transformer area along DPH Ferry Ghat road, 43km, PLHPS, NEEPCO Ltd, Arunachal Pradesh. |
|
|
| 3796/2024 |
NIT No. 69/PLHPS/DGM(C) C&P(C)/T-04/2024-25
|
23/11/2024 |
Construction of protection Gabion wall along the approach road of raw water intake, NEEPCO Ltd, 43km, Keyi Panyor, Arunachal Pradesh. |
|
|
| 3795/2024 |
NIT No. 68/PLHPS/DGM(C) C&P(C)/T-04/2024-25
|
23/11/2024 |
Construction of PCC road toward the raw water intake road from Ch:36.00m to Ch:172.00 (Ch:0.00 at Possa bridge), 43km, NEEPCO Ltd, Keyi Panyor, Arunachal Pradesh. |
|
|
| 3794/2024 |
NIT No. 67/PLHPS/DGM(C) C&P(C)/T-04/2024-25
|
23/11/2024 |
Repairing of Eroded slope, adjoining drains, Horizontal & Vertical Bands at Downstream of right abutment of PLHPS Dam, 41km, Arunachal Pradesh. |
|
|
| 3793/2024 |
NIT No. 66/PLHPS/DGM(C) C&P(C)/T-04/2024-25
|
23/11/2024 |
Construction of Boundary wall from Possa church main gate to C-Type colony section-I Ch:463.50 to Ch:500.00m (Ch:0.00 at Possa Church main Gate), PLHPS, 43km Colony, Arunachal Pradesh. |
|
|
| 3792/2024 |
NIT No. 65/PLHPS/DGM(C) C&P(C)/T-04/2024-25
|
23/11/2024 |
Construction of protection Gabion wall toward the Dam Main gate from Ch 1.400km to Ch 1.414km (Ch: 0.00 at Dam main Gate) NEEPCO Ltd, 43km, Keyi Panyor, Arunachal Pradesh. |
|
|
| 3791/2024 |
NIT No. 64/PLHPS/DGM(C) C&P(C)/T-04/2024-25
|
23/11/2024 |
Providing protection Gabion wall near raw water intake near Possa, NEEPCO Ltd, 43km, Keyi Panyor, Arunachal Pradesh. |
|
|
| 3790/2024 |
NIT No. 63/PLHPS/DGM(C) C&P(C)/T-04/2024-25
|
23/11/2024 |
River Training works along the bank of Pai nallah near Check Dam at confluence of Pai Nallah with PLHPS reservoir, PLHPS. |
|
|
| 3788/2024 |
Bid Number GEM/2024/B/5638429
|
22/11/2024 |
Procurement of Services for "Profitability Optimization Study". |
|
|
| 3787/2024 |
NIT No. 62/PLHPS/DGM(C) C&P(C)/T-04/2024-25
|
22/11/2024 |
Construction of gabion structure for preventing soil erosion behind Central Store, 43km, PLHPS, NEEPCO Ltd, Arunachal Pradesh. |
|
|
| 3786/2024 |
NIT No. 61/PLHPS/DGM(C) C&P(C)/T-04/2024-25
|
22/11/2024 |
Construction of gabion structure for preventing soil erosion and protection of rim bund behind Workshop, 43km, PLHPS, NEEPCO Ltd, Arunachal Pradesh. |
|
|
| 3785/2024 |
NIT No. 60/PLHPS/DGM(C) C&P(C)/T-04/2024-25
|
22/11/2024 |
Construction of Retaining wall, Fencing and Footpath of Driver/Labour Barrack No. 2, 43km, NEEPCO Colony, PLHPS, Yazali, Arunachal Pradesh. |
|
|
| 3784/2024 |
NIT No. 59/PLHPS/DGM(C) C&P(C)/T-04/2024-25
|
22/11/2024 |
Extension of Drain & providing and laying hume pipe across the main road from helipad to medical colony, PLHPS, NEEPCO Ltd, Arunachal Pradesh. |
|
|
| 3783/2024 |
NIT No. 58/PLHPS/DGM(C) C&P(C)/T-04/2024-25
|
22/11/2024 |
Construction of Protection Work behind Security booth along Hill slope near Intake, PLHPS, 41km, Yazali, Arunachal Pradesh. |
|
|
| 3782/2024 |
NIT No. 57/PLHPS/DGM(C) C&P(C)/T-04/2024-25
|
22/11/2024 |
Construction of Boundary wall all around remaining portion of DPH and also increase the height of existing cement concrete wall at back side of DPH 43km, NEEPCO Colony, PLHPS, Arunachal Pradesh. |
|
|
| 3776/2024 |
Bid Number GEM/2024/B/5635654
|
22/11/2024 |
Supply of High Mast Lighting Tower for large area with LED Flood Lighting System in Kameng Hydro Power Station, Arunachal Pradesh. |
|
|