Tender

Last Updated : 24/03/2026

SERIAL NO. TENDER NUMBER TENDER DATE SHORT NOTICE INVITING BIDS CORRIGENDUM DETAILED BID DOCUMENTS
3833/2024 NIT No. 22/2024-25/PLHPS/HCMW
AttachmentSize
PDF icon 301220240900-3833.pdf2.33 MB
27/12/2024 Renovation of main water supply line by providing RCC pedestal column supports to GI pipes from intake (Budi Nallah source) to main water storage cum supply tank to Dikrong Power Station Colony, Hoj, PLHPS, Arunachal Pradesh.
3832/2024 NIB No. 01/GHY/2024
AttachmentSize
PDF icon 301220240200-3832.pdf735.65 KB
27/12/2024 Construction of Transit Camp-II at Cotton Road, Tezpur, Assam.
3831/2024 NIT No. PLHPS/US&W-05/2024-25
AttachmentSize
PDF icon 301220240900-3831.pdf1.57 MB
27/12/2024 Internal Electrification of Executive Guest House Building, Power House Complex, PLHPS, Hoj, Arunachal Pradesh.
3840/2025 Bid Number GEM/2024/B/5748166
AttachmentSize
PDF icon 060120251500-3840.pdf5.77 MB
24/12/2024 Maintenance of 33 and 11KV transmission lines and operation maintenance of indoor substation at Kameng HPS, Arunachal Pradesh.
3829/2024 NIT No. PLHPS/US&W- 04/2024-25
AttachmentSize
PDF icon 241220240900-3829.pdf1.6 MB
23/12/2024 Re-alignment of 33KV HT Line from Location No. 09 to Location No. 13 near reservoir, PLHPS, Yazali, Arunachal Pradesh.
3830/2024 NIB No. 11/HQ
AttachmentSize
PDF icon 261220240100-3830.pdf2.64 MB
20/12/2024 Renovation of lobby including staircase at Approach & First floors at Corporate Office building, NEEPCO, Shillong.
3828/2024 NIT No. 20/2024-25/PLHPS/HCMW
AttachmentSize
PDF icon 231220240900-3828.pdf1.81 MB
20/12/2024 Construction of Peripheral wall and Iron Gate for New Dikrong Power House Office at Dikrong Power House Colony, PLHPS, NEEPCO Ltd, Hoj, Arunachal Pradesh.
3827/2024 NIT No. 84/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 231220240900-3827.pdf1.78 MB
20/12/2024 Construction of Toe wall in the reservoir side to protect the road in the sinking zones, PLHPS, 41km, Yazali, Arunachal Pradesh.
3826/2024 NIT No. 83/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 231220240900-3826.pdf1.82 MB
20/12/2024 Protection work on downhill side of road connecting Dam and Intake at a chainage of 143m from PLHPS Dam, NEEPCO, Arunachal Pradesh.
3825/2024 NIT No. 82/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 231220240900-3825.pdf1.89 MB
20/12/2024 Construction of protection work (Group-I) at the downstream old Dam in right bank for protecting the approach to Dam Downstream Face, right bank, PLHPS, 41km, Yazali, Arunachal Pradesh.
3824/2024 NIT No. 21/2024-25/PLHPS/HCMW
AttachmentSize
PDF icon 231220240900-3824.pdf1.69 MB
20/12/2024 Construction of Road and Drain below Main water storage tank leading to Hoj Baptist Church of PLHPS, Hoj, Arunachal Pradesh.
AttachmentSize
PDF icon Corrigendum No. 1372.25 KB
3823/2024 NIT No. 19/2024-25/PLHPS/HCMW
AttachmentSize
PDF icon 231220240900-3823.pdf1.82 MB
19/12/2024 Construction of Cement Drain and Flooring at Executive Guest House, DPH, NEEPCO Ltd, Hoj, Arunachal Pradesh, India.
3821/2024 NIT No. PLHPS/HOP/05/2024-25
AttachmentSize
PDF icon 191220240900-3821.pdf1.87 MB
19/12/2024 Supply of vehicle- Mahindra Bolero Model No- B6 Opt (BS6) on hired charge basis along with driver for Panyor Lower Hydro Power Station, NEEPCO, Hoj, Arunachal Pradesh.
3817/2024 NIB No. 10/HQ
AttachmentSize
PDF icon 171220240100-3817.pdf2.65 MB
17/12/2024 Exterior wall painting including necessary repairing works of IT Building-II, Security Barrack and Sub Station at Corporate Head Quarter, Shillong.
3816/2024 NIB No. 09/HQ
AttachmentSize
PDF icon 171220240100-3816.pdf2.67 MB
17/12/2024 Exterior wall painting including necessary repairing works of C&P Building and Staff Quarter, Corporate Head Quarter, Shillong.
3815/2024 NIB No. 08/HQ
AttachmentSize
PDF icon 171220240100-3815.pdf2.66 MB
17/12/2024 Outside wall painting including repairing at 'C' type office building, NEEPCO Corporate Office building, Shillong.
3814/2024 NIB No. 07/HQ
AttachmentSize
PDF icon 171220240100-3814.pdf2.62 MB
17/12/2024 Outside wall painting including repairing at main office building, NEEPCO Corporate Office building, Shillong.
3820/2024 NIT No. 81/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 181220240900-3820.pdf1.65 MB
16/12/2024 Channelizing of Pai Stream & Protection of stream banks from DPH bailey bridge upto NRC Auditorium, 43km, PLHPS, NEEPCO Ltd, Arunachal Pradesh.
3819/2024 NIT No. 80/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 181220240900-3819.pdf1.61 MB
16/12/2024 Construction of Check Dam at Peil stream near PLHPS reservoir rim, NEEPCO Ltd, Arunachal Pradesh.
3818/2024 NIT No. 79/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 181220240900-3818.pdf1.64 MB
16/12/2024 Construction of Check Dam at Pesse Mallah on left bank of PLHPS reservoir, NEEPCO Ltd, Arunachal Pradesh.
3812/2024 Bid Number GEM/2024/B/5692577
AttachmentSize
PDF icon 111220240100-3812.pdf280.47 KB
11/12/2024 Project Management Consultancy Services for Heo (240 MW) Hydro Electric Project, Arunachal Pradesh.
3813/2024 NIT NO. 18/2024-25/PLHPS/HCMW
AttachmentSize
PDF icon 161220240900-3813.pdf4.47 MB
10/12/2024 Construction of RCC Intake structure at Budi Nallah for water supply to Dikrong Power Station colony, Hoj, PLHPS, Arunachal Pradesh.
3808/2024 NIT No. 05/AgGBPS/C&P
AttachmentSize
PDF icon 101220241100-3808.pdf2.19 MB
10/12/2024 Repairing of existing road at Power House and Administrative Building Complex, AgGBPS, NEEPCO Ltd, R.C Nagar, Tripura(W).
AttachmentSize
PDF icon Cancellation Order408.91 KB
3809/2024 NIT No. 17/2024-25/PLHPS/HCMW
AttachmentSize
PDF icon 101220240900-3809.pdf1.47 MB
06/12/2024 Temporary barrier to prevent backflow of river water to the tail pool at Dikrong Power House, Hoj, Arunachal Pradesh.
3888/2025 NIT No. KHPS/C&P/2024-25/498
AttachmentSize
PDF icon 070220250700-3888.pdf1.82 MB
04/12/2024 Extension of Activity Hall Building at VKV School, KHPS, Umrangso.
3797/2024 NIT NO.KHPS/C&P/2024-25/498
AttachmentSize
PDF icon 051220240700-3797.pdf1.76 MB
04/12/2024 Repairing of Non-Functional School Toilets constructed under Swachh Vidyalaya Abhiyan by KHPS during FY 2014-15 & 2015-16
3798/2024 NIB NO.468
AttachmentSize
PDF icon 051220240100-3798.pdf3.31 MB
03/12/2024 Empanelment of Insurance Brokers in NEEPCO to provide Services for managing insurance portfolio of NEEPCO as Insurance Intermediary
AttachmentSize
PDF icon Corrigendum No. 1521.23 KB
PDF icon Corrigendum No. 2306.85 KB
PDF icon Corrigendum No. 3309.04 KB
PDF icon Corrigendum No. 5629.5 KB
PDF icon Corrigendum No. 7581.42 KB
PDF icon Corrigendum No. 8562.42 KB
PDF icon Corrigendum No. 9556.24 KB
3810/2024 NIT No. 72/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 101220240900-3810.pdf1.6 MB
30/11/2024 Construction of Boundary wall from D type Main Gate to D-6 Quarter Ch: 126.25m to Ch: 253.75m toward backside to main gate (Ch: 0.00 at D-6), PLHPS, 43km Colony, Arunachal Pradesh.
3806/2024 NIT No. 77/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 101220240900-3806.pdf1.57 MB
30/11/2024 Construction of breast wall near Dam site road from Ch: 752.00 to Ch: 777.5 (From Ch:0.00 at Dam main gate) NEEPCO Ltd, 43km, Kenyi Panyor, Arunachal Pradesh.
3805/2024 NIT No. 76/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 101220240900-3805.pdf1.58 MB
30/11/2024 Construction of protection gabion wall near Dam site road from Ch: 672.00m to Ch: 727.00m (From Ch: 0.00m at dam main gate), NEEPCO Ltd, 43km, Kenyi Panyor, Arunachal Pradesh.
3804/2024 NIT No. 75/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 101220240900-3804.pdf1.59 MB
30/11/2024 Providing protection works at left side of DPH road, very adjacent to Bailey Bridge at PLHPS, NEEPCO Ltd, Arunachal Pradesh.
3803/2024 NIT No. 74/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 101220240900-3803.pdf1.54 MB
30/11/2024 Construction of Boundary wall near main gate toward reservoir (Left side) Ch: 0.00 to 35.80 meter (Ch:0.00 meter main gate), PLHPS, 43km colony, Arunachal Pradesh.
3802/2024 NIT No. 73/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 101220240900-3802.pdf1.56 MB
30/11/2024 Construction of Boundary wall from D type Main Gate to D-6 Quarter Ch: 0.00 to Ch:126.25m towards backside to main gate (Ch: 0.00 at D-6), PLHPS, 43km Colony, Arunachal Pradesh (Group-II).
3801/2024 NIT No. 71/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 101220240900-3801.pdf1.54 MB
30/11/2024 Construction of Boundary wall covering Backside of DPH, fuel tank and CPD office, PLHPS, 43km Colony, Arunachal Pradesh.
3800/2024 NIT No. 70/PLHPS/GM(Tech) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 101220240900-3800.pdf1.59 MB
30/11/2024 Construction of gabion structure for preventing soil erosion and protection of transformer area along DPH Ferry Ghat road, 43km, PLHPS, NEEPCO Ltd, Arunachal Pradesh.
3796/2024 NIT No. 69/PLHPS/DGM(C) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 021220240900-3796.pdf1.33 MB
23/11/2024 Construction of protection Gabion wall along the approach road of raw water intake, NEEPCO Ltd, 43km, Keyi Panyor, Arunachal Pradesh.
3795/2024 NIT No. 68/PLHPS/DGM(C) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 021220240900-3795.pdf1.4 MB
23/11/2024 Construction of PCC road toward the raw water intake road from Ch:36.00m to Ch:172.00 (Ch:0.00 at Possa bridge), 43km, NEEPCO Ltd, Keyi Panyor, Arunachal Pradesh.
3794/2024 NIT No. 67/PLHPS/DGM(C) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 021220240900-3794.pdf1.35 MB
23/11/2024 Repairing of Eroded slope, adjoining drains, Horizontal & Vertical Bands at Downstream of right abutment of PLHPS Dam, 41km, Arunachal Pradesh.
3793/2024 NIT No. 66/PLHPS/DGM(C) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 021220240900-3793.pdf1.38 MB
23/11/2024 Construction of Boundary wall from Possa church main gate to C-Type colony section-I Ch:463.50 to Ch:500.00m (Ch:0.00 at Possa Church main Gate), PLHPS, 43km Colony, Arunachal Pradesh.
3792/2024 NIT No. 65/PLHPS/DGM(C) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 021220240900-3792.pdf1.35 MB
23/11/2024 Construction of protection Gabion wall toward the Dam Main gate from Ch 1.400km to Ch 1.414km (Ch: 0.00 at Dam main Gate) NEEPCO Ltd, 43km, Keyi Panyor, Arunachal Pradesh.
3791/2024 NIT No. 64/PLHPS/DGM(C) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 021220240900-3791.pdf1.37 MB
23/11/2024 Providing protection Gabion wall near raw water intake near Possa, NEEPCO Ltd, 43km, Keyi Panyor, Arunachal Pradesh.
3790/2024 NIT No. 63/PLHPS/DGM(C) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 021220240900-3790.pdf1.37 MB
23/11/2024 River Training works along the bank of Pai nallah near Check Dam at confluence of Pai Nallah with PLHPS reservoir, PLHPS.
3788/2024 Bid Number GEM/2024/B/5638429
AttachmentSize
PDF icon 271120240200-3788.pdf276.51 KB
22/11/2024 Procurement of Services for "Profitability Optimization Study".
3787/2024 NIT No. 62/PLHPS/DGM(C) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 261120240900-3787.pdf1.47 MB
22/11/2024 Construction of gabion structure for preventing soil erosion behind Central Store, 43km, PLHPS, NEEPCO Ltd, Arunachal Pradesh.
3786/2024 NIT No. 61/PLHPS/DGM(C) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 261120240900-3786.pdf1.47 MB
22/11/2024 Construction of gabion structure for preventing soil erosion and protection of rim bund behind Workshop, 43km, PLHPS, NEEPCO Ltd, Arunachal Pradesh.
3785/2024 NIT No. 60/PLHPS/DGM(C) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 261120240900-3785.pdf1.46 MB
22/11/2024 Construction of Retaining wall, Fencing and Footpath of Driver/Labour Barrack No. 2, 43km, NEEPCO Colony, PLHPS, Yazali, Arunachal Pradesh.
3784/2024 NIT No. 59/PLHPS/DGM(C) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 261120240900-3784.pdf1.46 MB
22/11/2024 Extension of Drain & providing and laying hume pipe across the main road from helipad to medical colony, PLHPS, NEEPCO Ltd, Arunachal Pradesh.
3783/2024 NIT No. 58/PLHPS/DGM(C) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 261120240900-3783.pdf1.46 MB
22/11/2024 Construction of Protection Work behind Security booth along Hill slope near Intake, PLHPS, 41km, Yazali, Arunachal Pradesh.
3782/2024 NIT No. 57/PLHPS/DGM(C) C&P(C)/T-04/2024-25
AttachmentSize
PDF icon 261120240900-3782.pdf1.48 MB
22/11/2024 Construction of Boundary wall all around remaining portion of DPH and also increase the height of existing cement concrete wall at back side of DPH 43km, NEEPCO Colony, PLHPS, Arunachal Pradesh.
3776/2024 Bid Number GEM/2024/B/5635654
AttachmentSize
PDF icon 221120241500-3776.pdf113.63 KB
22/11/2024 Supply of High Mast Lighting Tower for large area with LED Flood Lighting System in Kameng Hydro Power Station, Arunachal Pradesh.

Pages