Tender

Last Updated : 26/03/2019

SERIAL NO. TENDER NUMBER TENDER DATE SHORT NOTICE INVITING BIDS CORRIGENDUM DETAILED BID DOCUMENTS
1464/2018 NIT No.53 /NEEPCO /AGTCCPP /C&P /2017-18 07/12/2017 For Assistance works in Control and Instrumentation Maintenance for 4X21 MW GE make Gas Turbine and 25.5 MW Siemens Make Steam Turbine with HRSG of Thermax for NEEPCO, AGTCCPP
1507/2018 NIT No.86/2017-18/KHEP/C&P
AttachmentSize
PDF icon 290320180700-1507.pdf2.19 MB
05/12/2017 Construction of approach road to Khandong Dam from Umrongso Shillong road to L/F of Khandong Dam ( Meghalaya Bank)
1448/2017 NIT No.48/NEEPCO/AGTCCPP/C&P/2017-18
AttachmentSize
PDF icon 121220171100-1448.pdf293.4 KB
05/12/2017 Fire Fighting delivery Hose for NEEPCO, AGTCCPP, Ramchandra Nagar , Agartala, Tripura (W)
AttachmentSize
PDF icon Extension 1216.58 KB
PDF icon Extension 2268.86 KB
PDF icon Extension 3277.51 KB
PDF icon Extension 4216.45 KB
PDF icon Extension 5237.97 KB
PDF icon Cancellation Notice213.46 KB
1447/2017 NIT No.42/AGBP
AttachmentSize
PDF icon 121220171000-1447.pdf719.75 KB
30/11/2017 Repairing of B-type quarter No.B-8(B) including providing of granite & tiles at Kitchen Slab of Qtr No.B-11(A) of AGBP, NEEPCO Ltd, Assam
1446/2017 NIB No.AGBP/CWC/43
AttachmentSize
PDF icon 121220171000-1446.pdf1.55 MB
30/11/2017 Extension of balcony(back side) of B-type quarter No.B-11 to B-18, AGBP, NEEPCO Ltd, Assam.
1445/2017 NIT No.43/NEEPCO/AGTCCPP/C&P/2017-18
AttachmentSize
PDF icon 121220171100-1445.pdf437.07 KB
30/11/2017 Construction of security road from TSR camp of plant area of AGTCCPP to DM plant (near Gail Post),of NEEPCO, AGTCCPP, Agartala, Tripura (W)
AttachmentSize
PDF icon Cancellation Notice213.16 KB
1444/2017 NIT No.44/NEEPCO/AGTCCPP/C&P/2017-18
AttachmentSize
PDF icon 121220171100-1444.pdf421.09 KB
30/11/2017 Construction of security road from Plant Gate to Bank Gate via Store of NEEPCO, AGTCCPP, Agartala, Tripura (W)
AttachmentSize
PDF icon Cancellation Notice229.2 KB
1443/2017 NIT No.45/NEEPCO/AGTCCPP/C&P/2017-18
AttachmentSize
PDF icon 121220171100-1443.pdf386.6 KB
30/11/2017 Construction of Approach Road of Store Complex of NEEPCO, AGTCCPP, Agartala, Tripura (W)
AttachmentSize
PDF icon Cancellation Notice213.47 KB
1442/2017 NIT No.46/NEEPCO/AGTCCPP/C&P/2017-18
AttachmentSize
PDF icon 121220171100-1442.pdf390.13 KB
30/11/2017 Construction of Approach Road from Colony Road to Deep Tube Well Site Near Qtr. No A34, of Colony complex,NEEPCO, AGTCCPP , R.C Nagar, Tripura(W).
AttachmentSize
PDF icon Cancellation Notice215.14 KB
1441/2017 NIB No.AGBP/CWC/41
AttachmentSize
PDF icon 121220171000-1441.pdf1.12 MB
29/11/2017 Providing fitting & fixing pre painted Galvanized iron sheet roofing(Dyna roof) at Administrative building, AGBP,NEEPCO Ltd, Assam
1440/2017 NIT No.05/TrHEP/2017
AttachmentSize
PDF icon 121220171200-1440.pdf117.55 KB
29/11/2017 Hiring of Mahindra Scorpio, 140bhp, BSIV(S7/S11) -1no at Tuirial Hydro Electric Project, NEEPCO Ltd., Mizoram.
1439/2017 NIT No.41/NEEPCO/AGTCCPP/C&P/2017-18
AttachmentSize
PDF icon 121220171100-1439.pdf301.03 KB
28/11/2017 Removal of Old CGI Sheets and refitting new CGI Sheet in the Roof of Store No # 2 of NEEPCO, AGTCCPP, Agartala, Tripura (W)
AttachmentSize
PDF icon Cancellation Notice246.94 KB
1438/2017 NIT No.42/NEEPCO/AGTCCPP/C&P/2017-18
AttachmentSize
PDF icon 121220171100-1438.pdf301.47 KB
28/11/2017 Removal of Old CGI Sheets and refitting new CGI Sheet in the Roof of Store No # 3 of NEEPCO, AGTCCPP, Agartala, Tripura (W)
1437/2017 NIT No.27/17-18/RHEP
AttachmentSize
PDF icon 121220170900-1437.pdf196.71 KB
28/11/2017 Supply, Erection, Testing & Commissioning of Centralized Grease Lubrication System for 3 X 135 MW Dikrong Power House , Ranganadi H.E. Plant, NEEPCO Ltd, Arunachal Pradesh
1436/2017 NIT No.40/NEEPCO/AGTCCPP/C&P/2017-18
AttachmentSize
PDF icon 121220171100-1436.pdf301.21 KB
25/11/2017 Removal of Old CGI Sheets and refitting new CGI Sheet in the Roof of Store No # 1 of NEEPCO, AGTCCPP, Agartala, Tripura (W)
AttachmentSize
PDF icon Cancellation Notice243.62 KB
1435/2017 NIB No.259/HQ
AttachmentSize
PDF icon 121220170100-1435.pdf464.51 KB
24/11/2017 Implementation of Enterprise Resource Planning at NEEPCO
AttachmentSize
PDF icon Corrigendum 1503.36 KB
PDF icon Minutes of Pre Bid Meeting1.84 MB
PDF icon Corrigendum 2396.11 KB
PDF icon Corrigendum 3398.66 KB
PDF icon Corrigendum 4293.75 KB
PDF icon Corrigendum 51004.05 KB
PDF icon Corrigendum 6362.76 KB
Package icon Corrigendum 7874.61 KB
PDF icon Corrigendum 8614.73 KB
PDF icon Corrigendum 9224 KB
PDF icon Corrigendum 10489 KB
PDF icon Cancellation Notice484.67 KB
1434/2017 NIT No.04/TrHEP/2017
AttachmentSize
PDF icon 121220171200-1434.pdf158.07 KB
24/11/2017 Metalling and Carpeting of the Approach Road to 132kV Switchyard from junction point with main approach road to Power House at Tuirial Hydro Electric Project, Mizoram (Approx. length: 144m)
1433/2017 NIT No.47/TGBPP
AttachmentSize
PDF icon 121220172001-1433.pdf459.29 KB
22/11/2017 Supply of IT consumables at TGBPP,NEEPCO Ltd, Monarchak, Tripura
1432/2017 NIT No.136/DGM(C)/TGBP/2017-18
AttachmentSize
PDF icon 121220172001-1432.pdf2.93 MB
21/11/2017 Construction of watch tower along with the periphery wall of TGBPP, NEEPCO Ltd., Monarchak, Tripura
AttachmentSize
PDF icon Corrigendum 1394.64 KB
1431/2018 NIB No.258/HQ
AttachmentSize
PDF icon 121220170800-1431.pdf7.32 MB
21/11/2017 Supply, laying of OFC at Doyang Hydro Electric Plant(DHEP), Wokha, Nagaland
AttachmentSize
PDF icon Corrigendum 1525.49 KB
PDF icon Corrigendum 2310.37 KB
1430/2017 NIT No.39/AGBP
AttachmentSize
PDF icon 121220171000-1430.pdf649.86 KB
21/11/2017 Repairing of drain, apron and foot path at C type Qtr, painting of medical building and repairing of B-type Qtr No.B-27(B) of AGBP colony.
1429/2018 NIB No.01/IC&A/HQ
AttachmentSize
PDF icon 121220170100-1429.pdf345.81 KB
17/11/2017 Evaluation of Internal Financial Control for the financial year 2017 - 2018 and impact assessment thereof based on the Corporation's adopted Risk Assessment Control Matrix
1428/2017 NIQ No.AGBP/CWC/06
AttachmentSize
PDF icon 121220171000-1428.pdf1020.72 KB
17/11/2017 Supply of sanitary fittings for maintenance of sanitary works at colony and plant area of AGBP, NEEPCO Ltd.
1427/2017 NIT No.RHEP/DGM/13/2017-18
AttachmentSize
PDF icon 121220170900-1427.pdf340.78 KB
16/11/2017 Fitting and fixing of floor tiles at sitting room of NEEPCO. IB, 43Km, RHEP. Yazali.
1426/2017 NIT No.RHEP/DGM/14/2017-18
AttachmentSize
PDF icon 121220170900-1426.pdf341.13 KB
16/11/2017 Fitting and fixing of floor tiles at sitting room of faculty in VKV, NEEPCO. RHEP. Yazali.
1425/2017 NEEPCO/AGBP/C&I/2017-18/ NIQ-04
AttachmentSize
PDF icon 121220171000-1425.pdf2.46 MB
15/11/2017 Supply of Chlorine Gas leakage Detection system
AttachmentSize
PDF icon Extension 2216.77 KB
1424/2017 NIB No.16/GHY
AttachmentSize
PDF icon 121220170100-1424.pdf288.57 KB
15/11/2017 Post constructional Anti-Termite treatment of NEEPCO Bhawan and Guest House Building, Guwahati
1423/2017 NIT No.RHEP/DGM/12/2017-18
AttachmentSize
PDF icon 121220170900-1423.pdf340.16 KB
14/11/2017 Fitting and fixing of floor tiles at VIP rooms and other rooms at NEEPCO IB, 43 Km. colony, RHEP
1422/2017 NIB No.257/HQ
AttachmentSize
PDF icon 121220170100-1422.pdf304.42 KB
13/11/2017 Outside weather shield Painting of Corporate Office buildings, NEEPCO, Shillong.
1421/2017 NIT No.AGBP/CWC/36
AttachmentSize
PDF icon 121220171000-1421.pdf1.1 MB
10/11/2017 Renovation of Assam Police Home Guard Barrack No.2 for office of the workers Union of AGBP
1420/2017 NIT No.AGBP/CWC/37
AttachmentSize
PDF icon 121220171000-1420.pdf1.1 MB
10/11/2017 Renovation of Assam police Home Guard Barrack No.3 for office of employee's Union of AGBP.
1419/2017 NIT No.AGBP/CWC/38
AttachmentSize
PDF icon 121220171000-1419.pdf1.1 MB
10/11/2017 Renovation of Assam police Home Guard Barrack No.4 for office of employee's Union of AGBP.
1418/2017 NIT No.38/NEEPCO/AGTCCPP/C&P/2017-18
AttachmentSize
PDF icon 121220171100-1418.pdf279.55 KB
10/11/2017 6.6 kV Panel Protection Relay up-gradation thereof in the existing Switchgear Room at NEEPCO Ltd. Agartala Gas Turbine Combined Cycle Power Plant (AGTCCPP) compatible with existing system
AttachmentSize
PDF icon Extension 1311.21 KB
PDF icon Extension 2232.85 KB
PDF icon Extension 3317.97 KB
1417/2017 NIT No.39/NEEPCO/AGTCCPP/C&P/2017-18
AttachmentSize
PDF icon 121220171100-1417.pdf279.28 KB
10/11/2017 48 Volt,200 Ah Plante Type Lead Acid Stationary Battery Bank consisting of 24 Nos. of Cells, MS Stand, IRIT, Acid and maintenance accessories as per IS:1652-2013 (Latest Rev.) as per IS:1652-2013 (Latest Rev.)
AttachmentSize
PDF icon Extension 1270.67 KB
PDF icon Extension 2217.16 KB
PDF icon Extension 3282.8 KB
1415/2017 NIQ No. NEEPCO/ND-27/134
AttachmentSize
PDF icon 121220170100-1415.pdf153.78 KB
08/11/2017 House- Keeping Services for NEEPCO Transit Camp at F-18, HauzKhaz Enclave, New Delhi
1414/2017 NIB No.17/GHY 07/11/2017 Hiring of brand new 1 no Mahindra Scorpio ( Model :S8 BS4) Vehicle on monthly basis with 90 (Ninety) days validity from the date of opening of the Bid
AttachmentSize
PDF icon Corrigendum 1144.65 KB
1413/2017 NIT No.AGBP/CWC/35
AttachmentSize
PDF icon 121220171000-1413.pdf1.1 MB
07/11/2017 Construction of welding shed adjacent to workshop building at plant area of AGBP, NEEPCO Ltd.
AttachmentSize
PDF icon Corrigendum484.78 KB
1412/2017 NIT NO.TrHEP-03/2017
AttachmentSize
PDF icon 121220171200-1412.pdf146.6 KB
03/11/2017 Double Cabin Pickup (4X4)-1no Mahindra Camper/Tata
1411/2017 NIB 03/GHY
AttachmentSize
PDF icon 121220170100-1411.pdf750.74 KB
03/11/2017 Disposal of old, used materials and equipments on "As is where is basis" lying at Lanka Store Complex, NEEPCO Ltd, Lanka
AttachmentSize
PDF icon Corrigendum 198.74 KB
1410/2018 NIB 255/HQ
AttachmentSize
PDF icon 121220170100-1410.pdf2.94 MB
03/11/2017 Limited tender for Renewal of Insurance Policy for the Assets of Tripura Gas Based Power Plant
1409/2018 NIB No.254/HQ
AttachmentSize
PDF icon 121220170100-1409.pdf95.16 KB
03/11/2017 Supply, Erection, Testing and Commissioning of Cummins Make 750KVA DG Set for 600 MW Kameng Hydro Electric Project located at Kimi, Arunachal Pradesh
AttachmentSize
PDF icon Corrigendum 159.89 KB
PDF icon Corrigendum 2426.43 KB
1408/2017 NIT NO.46
AttachmentSize
PDF icon 121220170100-1408.pdf440.81 KB
02/11/2017 Supply of bulk Chemicals for DM Plant and PT Plant of TGBPP
1407/2017 NIT NO.81/2017-18/KHEP/C&P(C)
AttachmentSize
PDF icon 121220170700-1407.pdf684.75 KB
02/11/2017 Construction of boulder crates breast wall
1406/2017 NIT NO.001/2017-18/KHEP/C&P
AttachmentSize
PDF icon 121220170700-1406.pdf448.88 KB
01/11/2017 Supply of Stainless Steel Butterfly Valve along with Power Pack for 2 x 25 MW Khandong Power Station
AttachmentSize
PDF icon Corrigendum 1174.44 KB
PDF icon Corrigendum 2174.92 KB
PDF icon Corrigendum 31.91 MB
PDF icon Corrigendum 5175.59 KB
PDF icon Corrigendum 6181.51 KB
1405/2017 NIT NO.45/TGBPP/E&M/C&P-09/2017-18
AttachmentSize
PDF icon 121220170100-1405.pdf570.47 KB
01/11/2017 Supply of Nuts, Bolts and Studs to TGBPP
1404/2017 NIT NO.80/2017-18/KHEP/C&P(C)
AttachmentSize
PDF icon 121220170700-1404.pdf698.99 KB
01/11/2017 Annual Maintenance of Sludge clearance at Permanent Water Treatment Plant
1403/2017 NIT NO.RHEP/DGM/10/2017-18
AttachmentSize
PDF icon 121220170900-1403.pdf133.94 KB
31/10/2017 Fitting and fixing of floor tiles at dining room & verandah
1402/2017 NIT NO.RHEP/DGM/11/2017-18
AttachmentSize
PDF icon 121220170900-1402.pdf134.28 KB
31/10/2017 Providing and fixing of Zink Alluminium alloy coated roofing sheet over the staffroom and other adjoining rooms in VKV, 43 km colony, RHEP
1401/2017 NIT NO.135/DGM(C)/TGBP/2017-18
AttachmentSize
PDF icon 121220172001-1401.pdf2.92 MB
31/10/2017 Construction of Staff Hostel for Operation and Maintenance Staff of Power House
AttachmentSize
PDF icon CORNIT12122017-557.pdf324.38 KB
1400/2017 NIT 34
AttachmentSize
PDF icon 121220170100-1400.pdf651.23 KB
30/10/2017 Painting of container to store lube oil at plant area of AGBP, construction of car parking sheds in front of quarters A-49 to A-53 of AGBP colony and repairing of B type quarter.

Pages