Tender

Last Updated : 24/03/2026

SERIAL NO. TENDER NUMBER TENDER DATE SHORT NOTICE INVITING BIDS CORRIGENDUM DETAILED BID DOCUMENTS
4346/2025 NIT No. 280-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 201120250900-4346.pdf1.28 MB
03/11/2025 Construction of (1) Security wall behind R&B(M) & Vigilance Office (2) Widening of road & (3) Storm water drain at 43 km, PLHPS, A.P.
4345/2025 NIT No. 279-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 201120250900-4345.pdf1.31 MB
03/11/2025 Construction of Permanent A-type Quarter no. - 12 (A/B) at 43 km, NEEPCO Colony, PLHPS, A.P.
4344/2025 NIT No. 278-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 201120250900-4344.pdf1.28 MB
03/11/2025 Placement of a Bituminous cover over the existing CC road and connecting Dam Top Gate to Dam body for to and fro movement of PLHPS Officials to Dam, PLHPS, 41 km, Yazali, A.P.
4343/2025 NIT No. 277-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 201120250900-4343.pdf1.34 MB
03/11/2025 Construction of Permanent A-type Quarter no. - 11 (A/B) at 43 km NEEPCO Colony, PLHPS, A.P.
4342/2025 NIT No. 276-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 201120250900-4342.pdf1.28 MB
03/11/2025 Construction of permanent 1 no of Plan-IV no. 9 at DPH colony, 43 km, NEEPCO, A.P.
4341/2025 NIT No. 275-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 201120250900-4341.pdf1.36 MB
03/11/2025 Construction of Permanent D Type Quarter no. D-7 at 43 km, NEEPCO Colony, PLHPS, A.P.
4340/2025 NIT No. 274-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 201120250900-4340.pdf1.36 MB
03/11/2025 Construction of Permanent D Type Quarter no. D-5 at 43 km, NEEPCO Colony, PLHPS, A.P.
4339/2025 NIT No. 273-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 201120250900-4339.pdf1.33 MB
03/11/2025 Construction of Permanent D Type Quarter no. D-4 at 43 km, NEEPCO Colony, PLHPS, A.P.
4338/2025 NIT No. 272-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 201120250900-4338.pdf1.28 MB
03/11/2025 Construction of Toe wall in the Reservoir side near Intake parking area to protect the hill slope, PLHPS, 41 km, Yazali, A.P.
4337/2025 NIT No. 271-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 201120250900-4337.pdf1.34 MB
03/11/2025 Construction of boundary wall, entry gate and divider wall, for post office & SBI Yazali at PLHPS NEEPCO Colony, 43 km, A.P.
4336/2025 NIT No. 270-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 201120250900-4336.pdf1.34 MB
03/11/2025 Construction of permanent 2 nos. of Plan-IV no. 10 & 11 at DPH colony, 43 km, NEEPCO, A.P.
4335/2025 NIT No. 269-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 201120250900-4335.pdf1.33 MB
03/11/2025 Construction of Protection Wall for retaining hill slope along Dam Downstream road beyond the Downstream gate, PLHPS, 41 km, Yazali, A.P.
4334/2025 NIT No. 268-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 201120250900-4334.pdf1.37 MB
03/11/2025 Construction of gabion structure for preventing soil erosion and protection of rim bund behind Scrapyard near Workshop, 43 km, PLHPS, NEEPCO Ltd., A.P.
4262/2025 Bid No. GEM/2025/B/6846670
AttachmentSize
PDF icon 041120251100-4262.pdf110.03 KB
03/11/2025 Supply of Fire Hose roll 63 mm dia with male & female coupling 15meters length at AgGBPS, NEEPCO Ltd.,R.C Nagar, Agartala, Tripura.
4357/2025 NIT No. 267-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 241120250900-4357.pdf1.68 MB
01/11/2025 Construction of Protection Work at the downstream of Dam in Right Bank from Ch: 305.00m to 315.00m (Ch:0.00m at the end of Right training wall) for protecting the hill slope adjacent to the Dam toe, Right Bank, PLHPS, 41km, Yazali, A.P.
4356/2025 NIT No. 266-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 241120250900-4356.pdf1.61 MB
01/11/2025 Construction of Toe wall in the Reservoir side to protect the Pitapool-Dam site road around 200m ahead of the sinking zone, PLHPS, 41km, Yazali, A.P.
4355/2025 NIT No. 265-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 241120250900-4355.pdf1.71 MB
01/11/2025 Repairing, renovation & construction of new septic tank and soak pit and changing of roof of 2 nos of Quarters behind tennis court near IB at 43km, PLHPS, NEEPCO colony Yazali, A.P.
4354/2025 NIT No. 264-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 241120250900-4354.pdf1.29 MB
01/11/2025 Construction of gabion structure for protection of boundary wall behind NRC auditorium, 43km, PLHPS, NEEPCO Ltd., A.P.
4353/2025 NIT No. 263-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 241120250900-4353.pdf1.32 MB
01/11/2025 Construction of (1) Pedestrian footpath, Underground utility duct, Approach road & Storm water drains of new VIP guest house (2) Periphery site development, false ceiling & outdoor kitchen shed (3) Civil works vis-a-vis horticulture & gardening, etc., 43km, PLHPS, A.P.
4352/2025 NIT No. 262-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 241120250900-4352.pdf1.31 MB
01/11/2025 Construction of Retaining structures and compound wall (1) Behind HSM office upto F&A office (2) Downhill side of old IB road & new approach road to NH-13 (3) Downhill side of new VIP guest house approach road & north side of building, 43km, PLHPS NEEPCO, A.P.
4351/2025 NIT No. 261-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 241120250900-4351.pdf1.66 MB
01/11/2025 Construction of Security room near main gate of New VIP Guest House, 43km, A.P.
4350/2025 NIT No. 260-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 241120250900-4350.pdf1.67 MB
01/11/2025 Construction of gabion structure for preventing soil erosion and protection of hill slope at about 280m u/s of bailey bridge along Intake road, 41km, PLHPS, NEEPCO Ltd., A.P.
4349/2025 NIT No. 259-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 241120250900-4349.pdf1.64 MB
01/11/2025 Removal of Silt from upstream of Check Dam at about 250m from Bailey bridge of Abdullah Nallah, 41km, PLHPS, A.P.
4348/2025 NIT No. 258-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 241120250900-4348.pdf1.4 MB
01/11/2025 Construction of Protection Work at the downstream of Dam in Right Bank from Ch: 329.50m to 355.00m (Ch:0.00m at the end of Right training wall) for protecting the hill slope adjacent to the Dam toe, Right Bank, PLHPS, 41km, Yazali, A.P.
4266/2025 NIT No. 17/2025-26/PLHPS/HCMW
AttachmentSize
PDF icon 061120250900-4266.pdf1.69 MB
31/10/2025 Construction of D-Type Quarter at Dikrong Power House Colony, Hoj, PLHPS, Arunachal Pradesh.
4265/2025 NIT No. 16/2025-26/PLHPS/HCMW
AttachmentSize
PDF icon 061120250900-4265.pdf1.58 MB
31/10/2025 New formation cutting for approach road to Darjeeling (Bodhe) village at Hoj, PLHPS, A.P.
4295/2025 NIT No. 257-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 121120250900-4295.pdf1.48 MB
30/10/2025 Construction of Protection Work at the downstream of Dam in Right Bank from Ch: 355.00m to 381.00m (Ch:0.00m at the end of Right training wall) Right Bank, PLHPS, 41km, Yazali, A.P.
4294/2025 NIT No. 256-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 121120250900-4294.pdf1.41 MB
30/10/2025 Construction of Multipurpose Building at 43km NEEPCO Colony, PLHPS, A.P.
4293/2025 NIT No. 255-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 121120250900-4293.pdf1.41 MB
30/10/2025 Construction of Permanent A-type Quarter No. - 10 (A/B) at 43km NEEPCO Colony, PLHPS, A.P.
4292/2025 NIT No. 254-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 121120250900-4292.pdf1.42 MB
30/10/2025 Repairing and renovation of backside of D type colony's Drain (Drivers barrack to D-8) at 43 km, PLHPS, NEEPCO Ltd. A.P.
4291/2025 NIT No. 253-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 121120250900-4291.pdf1.41 MB
30/10/2025 Construction of a 4th Labour Barrack (LB-4) along with Ancillary Works adjacent to Sigma camp near Intake Steel bridge, Right Bank, PLHPS, 41 Km, Yazali, A.P.
4290/2025 NIT No. 252-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 121120250900-4290.pdf1.43 MB
30/10/2025 Construction of rapid sand filter & distribution tank for D-type & Possa Colony, 43km, PLHPS, A.P.
4289/2025 NIT No. 251-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 121120250900-4289.pdf1.43 MB
30/10/2025 Construction of rapid sand filter & distribution tank for A-type colony & Store complex, 43km, PLHPS, A.P.
4288/2025 NIT No. 250-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 121120250900-4288.pdf1.44 MB
30/10/2025 Construction of rapid sand filter & distribution tank for C-type colony, Office complex & Guest house, 43km, PLHPS, A.P.
4287/2025 NIT No. 249-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 121120250900-4287.pdf1.41 MB
30/10/2025 Construction of rapid sand filter & distribution tank for DPH & B-type Colony, 43km, PLHPS, A.P.
4286/2025 NIT No. 248-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 121120250900-4286.pdf1.43 MB
30/10/2025 Construction of Breast wall and gabion structure along Damsite road in between Ch. 652m to 927m (Ch. 0.00m at Dam main gate), PLHPS, A.P.
4261/2025 NIT No. PLHPS/DPH/GM(Tech)/2015-26/02
AttachmentSize
PDF icon 301020250900-4261.pdf2.53 MB
29/10/2025 Engagement of Manpower for upkeeping of 2×1.6MVA, 33/11kV & 33kV Sub Station and 400kV, 3× 26.667MVAR GIS Bay of Dikrong Power House, PLHPS, NEEPCO Ltd., Hoj, Arunachal Pradesh
4260/2025 Bid Number: GEM/2025/B/6816356
AttachmentSize
PDF icon 291020251100-4260.pdf119.32 KB
28/10/2025 Supply of PPH STORAGE TANK Capacity: 6 KL, 900 Ltrs, 500 Ltrs and 500 Ltrs at AGTCCPP, NEEPCO Ltd., R C Nagar, Agartala, Tripura.
4259/2025 Bid Number: GEM/2025/B/6817066
AttachmentSize
PDF icon 241020250800-4259.pdf143.99 KB
23/10/2025 Supply of 12 Nos 132 KV CAPACITOR VOLTAGE TRANSFORMER including ETC for 3x25MW Doyang Hydro Power Station, Nagaland.
4283/2025 NIT No. 247-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 101120250900-4283.pdf1.37 MB
18/10/2025 Removal of Silt from Abduallah Nallah at Ch. of about 180m u/s of steel bridge connecting PLHPS Intake, 41km, Yazali, A.P.
4282/2025 NIT No. 246-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 101120250900-4282.pdf1.46 MB
18/10/2025 Construction of permanent 2 nos. of Plan-IV no 5 & 6 at DPH colony, 43km, NEEPCO, A.P.
4281/2025 NIT No. 245-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 101120250900-4281.pdf1.47 MB
18/10/2025 Protection gabion work at Ch. 1.420 km to Ch. 1.441 km along the damsite Pitapool road (Ch. 0.00 km is considered at Dam main gate) at PLHPS, NEEPCO Ltd., A.P.
4280/2025 NIT No. 244-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 101120250900-4280.pdf1.49 MB
18/10/2025 Providing and fixing tiles and construction of drain at VKV school toilet at 43km NEEPCO colony, PLHPS, A.P.
4279/2025 NIT No. 243-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 101120250900-4279.pdf1.49 MB
18/10/2025 Construction of Protection Work at the downstream of Dam in Right bank from Ch: 290.00m to 305.00m (Ch:0.00m at the end of Right training wall) for protecting the hill slope adjacent to the Dam toe, Right Bank, PLHPS, 41 Km, Yazali, A.P.
4278/2025 NIT No. 242-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 101120250900-4278.pdf1.48 MB
18/10/2025 Construction of a 3rd Labour Barrack (LB-3) along with Ancillary Works adjacent to Sigma camp near Intake Steel bridge, Right bank, PLHPS, 41 Km, Yazali, A.P.
4277/2025 NIT No. 241-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 101120250900-4277.pdf1.49 MB
18/10/2025 Providing and fixing diamond chain link fencing 50*50 mm mesh around A type-quarter No-A-78&79 (A&B) at 43km, PLHPS Yazali, A.P.
4276/2025 NIT No. 240-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 101120250900-4276.pdf1.46 MB
17/10/2025 Repairing, renovation and construction of new septic tank and soak pit of A-Type Qr No. 75 (Part-A&B) at PLHPS, NEEPCO colony, Yazali, A.P.
4275/2025 NIT No. 239-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 101120250900-4275.pdf1.5 MB
17/10/2025 Improvement of Left Bank-Dam Downstream road from Ch. 300.0m to Ch635.00m (Ch. 0.0m at intersection of Rub Village road & Dam downstream road), 41km, A.P.
4274/2025 NIT No. 238-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 101120250900-4274.pdf1.5 MB
17/10/2025 Improvement of road connecting PLHPS Dam with NH-13 from Ch. 0.00m to Ch.1170.00m (Ch 0.000m at PLHPS Dam main gate) NEEPCO, A.P
4273/2025 NIT No. 237-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
AttachmentSize
PDF icon 101120250900-4273.pdf1.5 MB
17/10/2025 Improvement of road connecting PLHPS Dam with NH-13 from Ch.1170.00m to Ch.2400.00m (Ch 0.000m at PLHPS Dam main gate), NEEPCO A.P.

Pages