| 4346/2025 |
NIT No. 280-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
03/11/2025 |
Construction of (1) Security wall behind R&B(M) & Vigilance Office (2) Widening of road & (3) Storm water drain at 43 km, PLHPS, A.P. |
|
|
| 4345/2025 |
NIT No. 279-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
03/11/2025 |
Construction of Permanent A-type Quarter no. - 12 (A/B) at 43 km, NEEPCO Colony, PLHPS, A.P. |
|
|
| 4344/2025 |
NIT No. 278-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
03/11/2025 |
Placement of a Bituminous cover over the existing CC road and connecting Dam Top Gate to Dam body for to and fro movement of PLHPS Officials to Dam, PLHPS, 41 km, Yazali, A.P. |
|
|
| 4343/2025 |
NIT No. 277-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
03/11/2025 |
Construction of Permanent A-type Quarter no. - 11 (A/B) at 43 km NEEPCO Colony, PLHPS, A.P. |
|
|
| 4342/2025 |
NIT No. 276-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
03/11/2025 |
Construction of permanent 1 no of Plan-IV no. 9 at DPH colony, 43 km, NEEPCO, A.P. |
|
|
| 4341/2025 |
NIT No. 275-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
03/11/2025 |
Construction of Permanent D Type Quarter no. D-7 at 43 km, NEEPCO Colony, PLHPS, A.P. |
|
|
| 4340/2025 |
NIT No. 274-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
03/11/2025 |
Construction of Permanent D Type Quarter no. D-5 at 43 km, NEEPCO Colony, PLHPS, A.P. |
|
|
| 4339/2025 |
NIT No. 273-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
03/11/2025 |
Construction of Permanent D Type Quarter no. D-4 at 43 km, NEEPCO Colony, PLHPS, A.P. |
|
|
| 4338/2025 |
NIT No. 272-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
03/11/2025 |
Construction of Toe wall in the Reservoir side near Intake parking area to protect the hill slope, PLHPS, 41 km, Yazali, A.P.
|
|
|
| 4337/2025 |
NIT No. 271-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
03/11/2025 |
Construction of boundary wall, entry gate and divider wall, for post office & SBI Yazali at PLHPS NEEPCO Colony, 43 km, A.P. |
|
|
| 4336/2025 |
NIT No. 270-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
03/11/2025 |
Construction of permanent 2 nos. of Plan-IV no. 10 & 11 at DPH colony, 43 km, NEEPCO, A.P. |
|
|
| 4335/2025 |
NIT No. 269-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
03/11/2025 |
Construction of Protection Wall for retaining hill slope along Dam Downstream road beyond the Downstream gate, PLHPS, 41 km, Yazali, A.P. |
|
|
| 4334/2025 |
NIT No. 268-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
03/11/2025 |
Construction of gabion structure for preventing soil erosion and protection of rim bund behind Scrapyard near Workshop, 43 km, PLHPS, NEEPCO Ltd., A.P. |
|
|
| 4262/2025 |
Bid No. GEM/2025/B/6846670
|
03/11/2025 |
Supply of Fire Hose roll 63 mm dia with male & female coupling 15meters length at AgGBPS, NEEPCO Ltd.,R.C Nagar, Agartala, Tripura. |
|
|
| 4357/2025 |
NIT No. 267-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
01/11/2025 |
Construction of Protection Work at the downstream of Dam in Right Bank from Ch: 305.00m to 315.00m (Ch:0.00m at the end of Right training wall) for protecting the hill slope adjacent to the Dam toe, Right Bank, PLHPS, 41km, Yazali, A.P. |
|
|
| 4356/2025 |
NIT No. 266-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
01/11/2025 |
Construction of Toe wall in the Reservoir side to protect the Pitapool-Dam site road around 200m ahead of the sinking zone, PLHPS, 41km, Yazali, A.P. |
|
|
| 4355/2025 |
NIT No. 265-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
01/11/2025 |
Repairing, renovation & construction of new septic tank and soak pit and changing of roof of 2 nos of Quarters behind tennis court near IB at 43km, PLHPS, NEEPCO colony Yazali, A.P. |
|
|
| 4354/2025 |
NIT No. 264-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
01/11/2025 |
Construction of gabion structure for protection of boundary wall behind NRC auditorium, 43km, PLHPS, NEEPCO Ltd., A.P. |
|
|
| 4353/2025 |
NIT No. 263-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
01/11/2025 |
Construction of (1) Pedestrian footpath, Underground utility duct, Approach road & Storm water drains of new VIP guest house (2) Periphery site development, false ceiling & outdoor kitchen shed (3) Civil works vis-a-vis horticulture & gardening, etc., 43km, PLHPS, A.P. |
|
|
| 4352/2025 |
NIT No. 262-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
01/11/2025 |
Construction of Retaining structures and compound wall (1) Behind HSM office upto F&A office (2) Downhill side of old IB road & new approach road to NH-13 (3) Downhill side of new VIP guest house approach road & north side of building, 43km, PLHPS NEEPCO, A.P. |
|
|
| 4351/2025 |
NIT No. 261-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
01/11/2025 |
Construction of Security room near main gate of New VIP Guest House, 43km, A.P. |
|
|
| 4350/2025 |
NIT No. 260-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
01/11/2025 |
Construction of gabion structure for preventing soil erosion and protection of hill slope at about 280m u/s of bailey bridge along Intake road, 41km, PLHPS, NEEPCO Ltd., A.P.
|
|
|
| 4349/2025 |
NIT No. 259-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
01/11/2025 |
Removal of Silt from upstream of Check Dam at about 250m from Bailey bridge of Abdullah Nallah, 41km, PLHPS, A.P. |
|
|
| 4348/2025 |
NIT No. 258-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
01/11/2025 |
Construction of Protection Work at the downstream of Dam in Right Bank from Ch: 329.50m to 355.00m (Ch:0.00m at the end of Right training wall) for protecting the hill slope adjacent to the Dam toe, Right Bank, PLHPS, 41km, Yazali, A.P. |
|
|
| 4266/2025 |
NIT No. 17/2025-26/PLHPS/HCMW
|
31/10/2025 |
Construction of D-Type Quarter at Dikrong Power House Colony, Hoj, PLHPS, Arunachal Pradesh. |
|
|
| 4265/2025 |
NIT No. 16/2025-26/PLHPS/HCMW
|
31/10/2025 |
New formation cutting for approach road to Darjeeling (Bodhe) village at Hoj, PLHPS, A.P. |
|
|
| 4295/2025 |
NIT No. 257-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
30/10/2025 |
Construction of Protection Work at the downstream of Dam in Right Bank from Ch: 355.00m to 381.00m (Ch:0.00m at the end of Right training wall) Right Bank, PLHPS, 41km, Yazali, A.P. |
|
|
| 4294/2025 |
NIT No. 256-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
30/10/2025 |
Construction of Multipurpose Building at 43km NEEPCO Colony, PLHPS, A.P. |
|
|
| 4293/2025 |
NIT No. 255-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
30/10/2025 |
Construction of Permanent A-type Quarter No. - 10 (A/B) at 43km NEEPCO Colony, PLHPS, A.P. |
|
|
| 4292/2025 |
NIT No. 254-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
30/10/2025 |
Repairing and renovation of backside of D type colony's Drain (Drivers barrack to D-8) at 43 km, PLHPS, NEEPCO Ltd. A.P. |
|
|
| 4291/2025 |
NIT No. 253-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
30/10/2025 |
Construction of a 4th Labour Barrack (LB-4) along with Ancillary Works adjacent to Sigma camp near Intake Steel bridge, Right Bank, PLHPS, 41 Km, Yazali, A.P. |
|
|
| 4290/2025 |
NIT No. 252-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
30/10/2025 |
Construction of rapid sand filter & distribution tank for D-type & Possa Colony, 43km, PLHPS, A.P. |
|
|
| 4289/2025 |
NIT No. 251-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
30/10/2025 |
Construction of rapid sand filter & distribution tank for A-type colony & Store complex, 43km, PLHPS, A.P. |
|
|
| 4288/2025 |
NIT No. 250-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
30/10/2025 |
Construction of rapid sand filter & distribution tank for C-type colony, Office complex & Guest house, 43km, PLHPS, A.P. |
|
|
| 4287/2025 |
NIT No. 249-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
30/10/2025 |
Construction of rapid sand filter & distribution tank for DPH & B-type Colony, 43km, PLHPS, A.P. |
|
|
| 4286/2025 |
NIT No. 248-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
30/10/2025 |
Construction of Breast wall and gabion structure along Damsite road in between Ch. 652m to 927m (Ch. 0.00m at Dam main gate), PLHPS, A.P. |
|
|
| 4261/2025 |
NIT No. PLHPS/DPH/GM(Tech)/2015-26/02
|
29/10/2025 |
Engagement of Manpower for upkeeping of 2×1.6MVA, 33/11kV & 33kV Sub Station and 400kV, 3× 26.667MVAR GIS Bay of Dikrong Power House, PLHPS, NEEPCO Ltd., Hoj, Arunachal Pradesh |
|
|
| 4260/2025 |
Bid Number: GEM/2025/B/6816356
|
28/10/2025 |
Supply of PPH STORAGE TANK Capacity: 6 KL, 900 Ltrs, 500 Ltrs and 500 Ltrs at AGTCCPP, NEEPCO Ltd., R C Nagar, Agartala, Tripura. |
|
|
| 4259/2025 |
Bid Number: GEM/2025/B/6817066
|
23/10/2025 |
Supply of 12 Nos 132 KV CAPACITOR VOLTAGE TRANSFORMER including ETC for 3x25MW Doyang Hydro Power Station, Nagaland. |
|
|
| 4283/2025 |
NIT No. 247-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
18/10/2025 |
Removal of Silt from Abduallah Nallah at Ch. of about 180m u/s of steel bridge connecting PLHPS Intake, 41km, Yazali, A.P. |
|
|
| 4282/2025 |
NIT No. 246-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
18/10/2025 |
Construction of permanent 2 nos. of Plan-IV no 5 & 6 at DPH colony, 43km, NEEPCO, A.P. |
|
|
| 4281/2025 |
NIT No. 245-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
18/10/2025 |
Protection gabion work at Ch. 1.420 km to Ch. 1.441 km along the damsite Pitapool road (Ch. 0.00 km is considered at Dam main gate) at PLHPS, NEEPCO Ltd., A.P. |
|
|
| 4280/2025 |
NIT No. 244-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
18/10/2025 |
Providing and fixing tiles and construction of drain at VKV school toilet at 43km NEEPCO colony, PLHPS, A.P. |
|
|
| 4279/2025 |
NIT No. 243-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
18/10/2025 |
Construction of Protection Work at the downstream of Dam in Right bank from Ch: 290.00m to 305.00m (Ch:0.00m at the end of Right training wall) for protecting the hill slope adjacent to the Dam toe, Right Bank, PLHPS, 41 Km, Yazali, A.P. |
|
|
| 4278/2025 |
NIT No. 242-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
18/10/2025 |
Construction of a 3rd Labour Barrack (LB-3) along with Ancillary Works adjacent to Sigma camp near Intake Steel bridge, Right bank, PLHPS, 41 Km, Yazali, A.P. |
|
|
| 4277/2025 |
NIT No. 241-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
18/10/2025 |
Providing and fixing diamond chain link fencing 50*50 mm mesh around A type-quarter No-A-78&79 (A&B) at 43km, PLHPS Yazali, A.P. |
|
|
| 4276/2025 |
NIT No. 240-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
17/10/2025 |
Repairing, renovation and construction of new septic tank and soak pit of A-Type Qr No. 75 (Part-A&B) at PLHPS, NEEPCO colony, Yazali, A.P. |
|
|
| 4275/2025 |
NIT No. 239-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
17/10/2025 |
Improvement of Left Bank-Dam Downstream road from Ch. 300.0m to Ch635.00m (Ch. 0.0m at intersection of Rub Village road & Dam downstream road), 41km, A.P. |
|
|
| 4274/2025 |
NIT No. 238-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
17/10/2025 |
Improvement of road connecting PLHPS Dam with NH-13 from Ch. 0.00m to Ch.1170.00m (Ch 0.000m at PLHPS Dam main gate) NEEPCO, A.P |
|
|
| 4273/2025 |
NIT No. 237-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
17/10/2025 |
Improvement of road connecting PLHPS Dam with NH-13 from Ch.1170.00m to Ch.2400.00m (Ch 0.000m at PLHPS Dam main gate), NEEPCO A.P. |
|
|