| 4401/2025 |
Bid No. GEM/2025/B/7024244
|
19/12/2025 |
Appointment of Point of Presence (PoP) for Serving National Pension System (NPS) for Employees of NEEPCO
|
|
|
| 4387/2025 |
Bid No. GEM/2025/B/7024268
|
19/12/2025 |
Supply of Material for Bus Duct at Kameng HPS. |
|
|
| 4386/2025 |
Bid No. GEM/2025/B/7021623
|
19/12/2025 |
Installation of CCTV system at Bichom and Tenga etc. |
|
|
| 4385/2025 |
Bid No. GEM/2025/B/7016956
|
18/12/2025 |
Supply of Filter kits, oil and air filter, O-rings and seals, corrosion inhibitor and radiwash chemicals, flexible hoses, pipe fittings, connectors, nipples, bushings, check valve, and Valvoline lubricant at AGTCCPP, NEEPCO Ltd., R C Nagar, Agartala. |
|
|
| 4412/2025 |
NIT No. 24/2025-26/PLHPS/HCMW
|
17/12/2025 |
Improvement of Road Surface from Shiv Mandir to PMT A-7 and towards 132 KV, Dikrong Power House, Hoj.
|
|
|
| 4384/2025 |
Bid No. GEM/2025/B/7010714
|
17/12/2025 |
Busduct CT for Kameng Hydro Power Station.
|
|
|
| 4383/2025 |
Bid No. GEM/2025/B/7010676
|
16/12/2025 |
Retrofitting of 36 kV VCB in place of existing 33 kV SF6 CB at Kameng Hydro Power Station.
|
|
|
| 4382/2025 |
Bid No. GEM/2025/B/7008672
|
16/12/2025 |
Supply, Installation, Testing and Commissioning of Automatic Weather Station (AWS) at Kameng Hydro Power Station (KaHPS), Arunachal Pradesh. |
|
|
| 4381/2025 |
Bid No. GEM/2025/B/7002385
|
15/12/2025 |
Supply of Silica Low Range Set , CuVer 1 copper reagent powder pillow, Buffer Solution Yellow, Red and Blue at AGTCCPP, NEEPCO Ltd., R C Nagar, Agartala. |
|
|
| 4380/2025 |
Bid No. GEM/2025/B/6990981
|
11/12/2025 |
Supply of High Precision Multimeter, Clamp Meter, Flexible probes for item Sl. No.02. , High Precision Multimeter, High Precision Milli-Amp Clam Meter, High Precision Clamp at AGTCCPP, NEEPCO Ltd., R C Nagar, Agartala. |
|
|
| 4430/2026 |
NIT No. 330-NEEPCO/PLHPS/GM(Tech) C&P(C)/T-04/2025-26
|
10/12/2025 |
Repairing and renovation of drain from NH-13 along D-Type road at 43km, PLHPS, NEEPCO Ltd, Arunachal Pradesh. |
|
|
| 4429/2026 |
NIT No. 329-NEEPCO/PLHPS/GM(Tech) C&P(C)/T-04/2025-26
|
10/12/2025 |
Construction of RCC Drain near Main Entrance gate at 43km, PLHPS, NEEPCO Ltd, Yazali, Arunachal Pradesh. |
|
|
| 4428/2026 |
NIT No. 328-NEEPCO/PLHPS/GM(Tech) C&P(C)/T-04/2025-26
|
10/12/2025 |
Construction of Permanent A-Type Quarter No. 13(A/B) at 43km, NEEPCO Colony, PLHPS, Arunachal Pradesh. |
|
|
| 4427/2026 |
NIT No. 327-NEEPCO/PLHPS/GM(Tech) C&P(C)/T-04/2025-26
|
10/12/2025 |
Construction of Protection Gabion wall along D-Type road at 43km, NEEPCO Colony, Keyi Panyor, Arunachal Pradesh. |
|
|
| 4426/2026 |
NIT No. 326-NEEPCO/PLHPS/GM(Tech) C&P(C)/T-04/2025-26
|
10/12/2025 |
Construction of compound wall in front side of old NEEPCO IB, 43km, Arunachal Pradesh. |
|
|
| 4425/2026 |
NIT No. 325-NEEPCO/PLHPS/GM(Tech) C&P(C)/T-04/2025-26
|
10/12/2025 |
Repairing of drain along A-Type Quarter No. A-33 to A-39 at 43km, PLHPS, NEEPCO Ltd, Arunachal Pradesh. |
|
|
| 4379/2025 |
NIT No. 14/2025-26/US&W
|
09/12/2025 |
Jungle Clearance, Gravel Replacement, and Fencing Painting in 11/0.415 kV Substation Areas at 43 KM, Pitapool and Damsite of PLHPS, Arunchal Pradesh, India. |
|
|
| 4368/2025 |
Bid No. GEM/2025/B/6967811
|
05/12/2025 |
Supply of LENOIR-ELEC, France make field breaker spares in Kameng Hydro Power Station. |
|
|
| 4367/2025 |
Bid No. GEM/2025/B/6971550
|
05/12/2025 |
Supply of Jyoti Ltd. make plug in relay in Kameng Hydro Power Station. |
|
|
| 4369/2025 |
Bid No. GEM/2025/B/6966361
|
04/12/2025 |
Supply of Printer Cartridges/Toners for IT Wing, DHPS, WOKHA, NAGALAND. |
|
|
| 4366/2025 |
Bid No. GEM/2025/B/6955546
|
02/12/2025 |
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF AUTOMATIC EMERGENCY EARLY WARNING SIREN SYSTEM FOR PLHPS, 43 KM, YAZALI, ARUNACHAL PRADESH. |
|
|
| 4365/2025 |
Bid No. GEM/2025/B/6917154
|
22/11/2025 |
Overhauling of 12.5 MVA generator transformer at Agartala Gas Based Power Station, Tripura.
|
|
|
| 4400/2025 |
NIT No. 315-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
21/11/2025 |
Construction of Protection Work at the Intake parking area in the Hill side for protecting the hill slope (Gr-I), Intake, PLHPS, 41km, Yazali, A.P.
|
|
|
| 4399/2025 |
NIT No. 314-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
21/11/2025 |
Engagement of Hydraulic Excavator cum loader along with mazdoor and Tipper 10 cum capacity for Cleaning of debris, muck at 43km, NEEPCO Colony, (DPH, A,B,C,D, type colony, store complex, office complex, etc.) A.P. |
|
|
| 4398/2025 |
NIT No. 313-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
21/11/2025 |
Providing and laying Close graded pre-mix surfacing work from security main entrance gate to intersection near VKV at 43km, PLHPS, NEEPCO Ltd, A.P. |
|
|
| 4397/2025 |
NIT No. 312-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
21/11/2025 |
Construction of Protection Work at the downstream of Dam in Right Bank from Ch: 315.00m to 329.50m (Ch:0.00m at the end of Right training wall) for protecting the hill slope adjacent to the Dam toe, Right Bank, PLHPS, 41km, Yazali, A.P. |
|
|
| 4396/2025 |
NIT No. 311-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
21/11/2025 |
Providing and laying close graded pre-mix surfacing work from NH-13 intersection near Possa main gate upto intersection near VKV, 43km, PLHPS, NEEPCO Ltd, A.P. |
|
|
| 4395/2025 |
NIT No. 310-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
21/11/2025 |
Construction of road connecting Dam-Pitapool Road to Reservoir bank for to and fro movement of PLHPS Officials to the reservoir banks, PLHPS, 41km, Yazali, A.P. |
|
|
| 4394/2025 |
NIT No. 309-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
21/11/2025 |
Construction of Safety barrier along Pitapool Damsite road from Ch.279m to 1129m (Ch.0.0m at intersection of NH-13 and Damsite road), PLHPS, A.P.
|
|
|
| 4393/2025 |
NIT No. 308-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
21/11/2025 |
Construction of Safety barrier along Pitapool Damsite road from Ch.1129m to 1779m (Ch.0.0m at intersection of NH-13 and Damsite road), PLHPS, A.P.
|
|
|
| 4392/2025 |
NIT No. 307-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
21/11/2025 |
Construction of Safety barrier along Pitapool Damsite road from Ch.2429m to 3079m (Ch.0.0m at intersection of NH-13 and Damsite road), PLHPS, A.P. |
|
|
| 4391/2025 |
NIT No. 306-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
21/11/2025 |
Construction of permanent security boundary wall 1) DPH boundary wall upto ferry ghat 2) DPH main gate upto Bailey bridge connecting DPH colony, 43km, PLHPS, A.P. |
|
|
| 4364/2025 |
Bid No. GEM/2025/B/6914607
|
21/11/2025 |
Supply and Installation of 261 Nos. of Laptops. |
|
|
| 4363/2025 |
NIB No. 08
|
21/11/2025 |
Development of Dympep Tourist Hub Washrooms |
|
|
| 4347/2025 |
Bid No. GEM/2025/B/6913540
|
20/11/2025 |
Re-certification of 7(seven) Stations/Offices under the Integrated Management System (QMS, EMS & OHSMS) as per the latest standards of ISO 9001, ISO 14001 & ISO 45001. |
|
|
| 4327/2025 |
NIT No. 13/2025-26/US&W
|
18/11/2025 |
Internal Electrification of Security Barrack Building, 43 KM, PLHPS, Yazali (AP) NEEPCO, 43 KM Colony, Arunachal Pradesh, India. |
|
|
| 4411/2025 |
NIT No. 305-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
17/11/2025 |
Construction of Cement concrete road from Dam Right Bank parking area upto PLHPS Intake Ch.0.0m to Ch.457.00m (Ch.0.0m near parking area of PLHPS dam, 41km, A.P.
|
|
|
| 4410/2025 |
NIT No. 304-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
17/11/2025 |
Construction of 2 nos. of Permanent Plan-IV Quarters no. 13 & 14 adjacent to old IB, 43km, NEEPCO, A.P.
|
|
|
| 4409/2025 |
NIT No. 303-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
17/11/2025 |
Providing and laying close graded pre-mix surfacing work at B-Type colony road including concreting of drain at 43km, PLHPS, NEEPCO Ltd, A.P. |
|
|
| 4408/2025 |
NIT No. 302-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
17/11/2025 |
Construction of permanent security boundary wall from Bailey bridge connecting DPH colony to Ferry Ghat including Steel Gate, 43km, PLHPS, A.P. |
|
|
| 4407/2025 |
NIT No. 301-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
17/11/2025 |
Construction of Safety barrier along Pitapool Damsite road from NH-13 (Ch.0.00m) to Nyader Namlo (Ch.213m) (Ch.0.0m at intersection NH-13, Damsite road), NEEPCO, A.P.
|
|
|
| 4406/2025 |
NIT No. 300-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
17/11/2025 |
Construction of Safety barrier along Pitapool Damsite road from Ch.1779m to 2429m (Ch.0.0m at intersection of NH-13 and Damsite road), PLHPS, A.P.
|
|
|
| 4405/2025 |
NIT No. 299-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
17/11/2025 |
Construction of boundary fencing around Magazine building from Ch. 240.0m to 470m (Ch. 0 at left side of main gate), 51km, A.P.
|
|
|
| 4404/2025 |
NIT No. 298-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
17/11/2025 |
Construction of boundary fencing around Magazine building from Ch. 0.0m to 240m (Ch.0 at left side of main gate), 51km, A.P. |
|
|
| 4403/2025 |
NIT No. 297-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
17/11/2025 |
Construction of Protection Work at the downstream of Dam in Right Bank from Ch: 381.00m to 406.00m (Ch:0.00m at the end of Right training wall) for protecting the hill slope adjacent to the Dam toe, Right Bank, PLHPS, 41km, Yazali, A.P. |
|
|
| 4402/2025 |
NIT No. 296-NEEPCO/PLHPS/GM(Tech)C&P(C)/T-04/2025-26
|
17/11/2025 |
Construction of Permanent C Type Quarter no. C-4 at 43km NEEPCO Colony, PLHPS, A.P.
|
|
|
| 4333/2025 |
NIT No. 23/2025-26/PLHPS/HCMW
|
17/11/2025 |
Construction of RCC Main Drain near SPT A-24 to Plan-IV area at Dikrong Power House, PLHPS, Arunachal Pradesh. |
|
|
| 4326/2025 |
NIB No. THPS-16/2025
|
17/11/2025 |
Hiring of 3 Nos of Mahindra Bolero B6 Vehicle |
|
|
| 4332/2025 |
NIT No. 22/2025-26/PLHPS/HCMW
|
15/11/2025 |
Construction of PCC Footpath along Boundary Wall from Main Gate to Market at Hoj, Arunachal Pradesh, India. |
|
|
| 4331/2025 |
NIT No. 21/2025-26/PLHPS/HCMW
|
13/11/2025 |
Construction of Boundary Wall from Store No. 2 to Security Colony, Dikrong Power House, PLHPS, Hoj, A.P. (Ch:0.00 to Ch: 1000.00m). |
|
|