Name |
|
Capacity |
75 MW |
Break Up Capacity |
|
Location |
District - Wokha, Nagaland,PIN - 797100 |
Approach |
By Road - 30 KM from Wokha town, 72 KM From Golaghat in Assam |
Design Energy |
|
Date of Commercial Operation (COD) |
Unit-I --- 29th Jun 2000 |
|
Unit-II --- 5th Jul 2000 |
|
Unit-III --- 8th Jul 2000 |
|
|
Beneficiary States / UTs |
Assam, Arunachal Pradesh, Manipur, Meghalaya, Mizoram, Nagaland, Tripura |
Technical Features |
DAM |
Rock Fill Dam, Height :: 92 m, Length :: 465 m |
Design Head |
67 m |
Tunnel Penstock |
1 no. Steel lined HRT with double bifurcation, 5.92m dia, 427.86 m long |
Power House |
Surface, 3 no. Vertical Francis Turbine |
Generator |
3 no. Semi-Umbrella Type, Rated Voltage- 11 KV |
Generator Step Up Transformer |
3-phase, 28.5MVA, 11/132 KV |
Switchyard |
Conventional outdoor, 132 KV |
Evacuation System |
132 kV D/C Doyang-Dimapur lines of PGCIL, 132 kV S/C Doyang-Kohima line and 132 KV S/C Doyang-Mokokchung line of Govt. of Nagaland |
|