| Name |  | 
| Capacity | 110  MW | 
	| Break Up Capacity |  | 
| Location | Dist- Papum Pare, Arunachal Pradesh, | 
| Approach | By Road -40 KM From Itanagar, Arunachal Pradesh | 
| Design Energy |  | 
| Date of Commercial Operation (COD) | 
	
			
					| Unit-I --- 28th May 2018 |  |  
					| Unit-II --- 21st May 2018 |  |  | 
| Beneficiary States / UTs | Assam,  Arunachal Pradesh, Manipur, Meghalaya, Mizoram, Nagaland, Tripura | 
| Technical Features | | Dam | Concrete Gravity, Height :: 63 m, Length :: 134.275 m |  | FRL | 245.15 m |  | MDDL | 240 m |  | Design Head | 67.36 m |  | Penstock | Pr. Tunnel Gross Length 225 m, Dia. 6.4 m, Bifurcated (penstock) Dia. 4.5 m |  | HRT | Modified Horse Shoe Type Length : 2818.73 m
 Dia. :   7.50 m
 |  | Surge Shaft | RESTRICTED ORIFICE TYPE/ Non Over flow, 57.29 m Depth, 18 m Dia. |  | Power House | Surface, 2 no. Vertical Francis Turbine (55 MW) |  | Generator | 2 no. Semi-Umbrella Type, Rated Voltage- 11 KV |  | Generator Step Up Transformer | 3-phase, 68MVA, 11/132 KV |  | Switchyard | Conventional outdoor, 132 KV |  | Evacuation of Power | LILO of 132 kV S/C RHEP-Nirijuli Transmission line of PGCIL LILO of 1 circuit of 132 kV D/C RHEP-Itanagar line of Govt. of AP
 | 
 |