Name |
|
Capacity |
110 MW |
Break Up Capacity |
|
Location |
Dist- Papum Pare, Arunachal Pradesh, |
Approach |
By Road -40 KM From Itanagar, Arunachal Pradesh |
Design Energy |
|
Date of Commercial Operation (COD) |
Unit-I --- 28th May 2018 |
|
Unit-II --- 21st May 2018 |
|
|
Beneficiary States / UTs |
Assam, Arunachal Pradesh, Manipur, Meghalaya, Mizoram, Nagaland, Tripura |
Technical Features |
Dam |
Concrete Gravity, Height :: 63 m, Length :: 134.275 m |
FRL |
245.15 m |
MDDL |
240 m |
Design Head |
67.36 m |
Penstock |
Pr. Tunnel Gross Length 225 m, Dia. 6.4 m, Bifurcated (penstock) Dia. 4.5 m |
HRT |
Modified Horse Shoe Type
Length : 2818.73 m
Dia. : 7.50 m |
Surge Shaft |
RESTRICTED ORIFICE TYPE/ Non Over flow, 57.29 m Depth, 18 m Dia. |
Power House |
Surface, 2 no. Vertical Francis Turbine (55 MW) |
Generator |
2 no. Semi-Umbrella Type, Rated Voltage- 11 KV |
Generator Step Up Transformer |
3-phase, 68MVA, 11/132 KV |
Switchyard |
Conventional outdoor, 132 KV |
Evacuation of Power |
LILO of 132 kV S/C RHEP-Nirijuli Transmission line of PGCIL
LILO of 1 circuit of 132 kV D/C RHEP-Itanagar line of Govt. of AP |
|