संग्रहित निविदा

आखिरी अपडेट: 26/05/2020

क्रमांक निविदा संख्या निविदा दिनांक संक्षिप्त सूचना बोली निविदाएं शुद्धिपत्र विस्तृत बोली दस्तावेज
1208/2017 NIB No. 162 - (73.71 KB) 17th सितंबर 2015 For Renewal of Insurance Policy for Assets of 220/132 kV Balipara and 132/33 kV Khuppi Substations, 2.5 MVA 33/11 kV & 125 kVA 11/0.433 kV Transformers and 33/11 kV Substations at Kimi, Tenga Dam, Bichom of KaHEP
AttachmentSize
PDF icon Corrigendum 147.98 KB
PDF icon Corrigendum 225.51 KB
1207/2017 NIT NO.90/DGM(C)/TGBPP/2015-16 - (450.18 KB) 28th नवंबर 2015 Removal of silt deposited at approach channel at intake power house
1206/2017 NIT No: 01 of 2015-16/HCMW - (96.51 KB) 17th सितंबर 2015 Construction of Security Duty Post at Power House Colony, Hoz, RHEP, A.P
1205/2017 NIT No. 02 of 2015-16/HCMW - (96.59 KB) 17th सितंबर 2015 Providing and Fixing of Water Storage Tanks in the Permanent RCC Quarters in the Power House Colony, Hoz, RHEP, A.P
1204/2017 NIT No. 03 of 2015-16/HCMW - (96.52 KB) 17th सितंबर 2015 Repairing, Painting and Distempering of RCC quarter no. PB-1 at Hoz, RHEP, A.P
1203/2017 NIT NO.89/DGM(C)/TGBPP/2015-16 - (441.97 KB) 28th नवंबर 2015 Renovation of the existing stores bldgs.
1202/2017 NIT NO.09/SRM(C)/AGTP/2015 - (655.08 KB) 28th नवंबर 2015 Roof Treatment of Bank and Post Office Building AGTP
1201/2017 NIT NO.08/SRM(C)/AGTP/2015 - (580.02 KB) 28th नवंबर 2015 Roof Treatment of Hospital Building of AGTP
1200/2017 NIT no 10/SRC(C)/AGTP/2015 - (506.5 KB) 30th नवंबर 2015 Construction of a septic tank on the back side of the Hospital Building of AGTP
1199/2017 NIQ NO.KHEP/C&P(E)/2015/243 - (278.78 KB) 30th नवंबर 2015 Selling of scrap from Kopili Hydro Electric Plant
1198/2017 NIT 51/2015-16/KHEP/C&P(C) - (481.08 KB) 01st दिसंबर 2015 Repairing of Kopili Surge Shaft Road
AttachmentSize
PDF icon Corrigendum 173.81 KB
PDF icon Corrigendum 264.61 KB
PDF icon Corrigendum 338.3 KB
1197/2017 NIT NEEPCO/ND-125/15-16/2042 - (188.49 KB) 02nd दिसंबर 2015 Empanelment of transporter/tour and travel agents for hiring of cars of daily /monthly basis for official use
1196/2017 NIT 91/DGM(C)/TGBP/2015 - (876.55 KB) 02nd दिसंबर 2015 Construction of bituminous carpet over approach road to Canteen Building and approach plant road to electrical store at TGBPP
1195/2017 NIT RHEP/DGM/09/2015-16 - (134.55 KB) 03rd दिसंबर 2015 Renovation of road side drain along C type quarters at 43 km Colony, RHEP (GROUP II)
1194/2017 NIT RHEP/DGM/08/2015-16 - (134.6 KB) 03rd दिसंबर 2015 Renovation of road side drain along the C type quarters, at 43 km colony, RHEP
1193/2017 NIT 25 - (646.72 KB) 03rd दिसंबर 2015 Providing CGI sheet cover at various locations and exterior painting of wall, doors, windows of "D" type quarters at AGBP
1192/2017 NIT 52/2015-16/KHEP/C&P(C) - (693.48 KB) 03rd दिसंबर 2015 Patch repairing including premix surfacing of NEEPCO Permanent Colony roads at KHEP
AttachmentSize
PDF icon Corrigendum 174.58 KB
1191/2017 NIT KHEP/C&P(E)/2015/244 - (348.29 KB) 03rd दिसंबर 2015 Supply, Installation, Testing and Commissioning of Battery Bank, Charger and DC Distribution board and Disposal through buyback of old batteries.
AttachmentSize
PDF icon Corrigendum102.48 KB
1190/2017 NIQ KHEP/C&P(E)/2014/245 - (294.86 KB) 03rd दिसंबर 2015 Supply, fitting, fixing & testing of energy efficient LED fittings
1189/2017 NIQ 12 - (582.31 KB) 04th दिसंबर 2015 Supplying a brand new TATA SUMO GOLD CX PS BSIII on hire for short term/long term basis
AttachmentSize
PDF icon Corrigendum 1186.98 KB
1188/2017 NIT 25/NEEPCO/AGTP-CC(EP)/CIVIL/2015-16 - (5.02 MB) 05th दिसंबर 2015 Repairing of existing road of backside of GT power house of AGTP
1187/2017 NIT KHEP/C&P/2015/246 - (167.42 KB) 05th दिसंबर 2015 Design, Engineering, Manufacture, Shop Assembly, Shop Testing, Supply and Delivery at site of 132 KV 600/1A Line CT
AttachmentSize
PDF icon Corrigendum76.77 KB
1186/2017 NIT 27/NEEPCO/AGTP-CC/CIVIL/2015-16 - (3.45 MB) 07th दिसंबर 2015 Repairing and construction of roads between ACC and GT power house of AGTP
AttachmentSize
PDF icon Extension Notice110.12 KB
1185/2017 NIT RHEP/DGM/10/2015-16 - (3.45 MB) 07th दिसंबर 2015 Renovation of security control room at RHEP, 43 Km colony.
1184/2017 NIB 178 - (353.25 KB) 07th दिसंबर 2015 Design, Engineering, Manufacture, Supply, Transportation, Delivery, Insurance, Erection and Commissioning of 1 no Butterfly valve for 1x25 MW Kopili Stage II and 1 no Spherical Valve for 4x50 MW Kopili Power Stations
AttachmentSize
PDF icon Corrigendum 163.09 KB
PDF icon Corrigendum 363.17 KB
PDF icon Corrigendum 480.7 KB
PDF icon Corrigendum 563.15 KB
Package icon Corrigendum 275.22 KB
1183/2017 SNIQ 01/2015/G&SY/DHEP - (1.81 MB) 07th दिसंबर 2015 Supply of Consumables required at DHEP
1182/2017 NIT 26/NEEPCO/AGTP-CC(EP)/CIVIL/2015-16 - (4.97 MB) 07th दिसंबर 2015 Repairing of existing road between HRSG and DM plant of AGTP
1181/2017 NIB No. 160 - (156.13 KB) 16th सितंबर 2015 Supply of the mechanical parts required for MI , CI & BI of Units at Agartala Gas Turbine Plant ( Make of Unit: GE make frame V gas turbine supplied by EGT, Model No. G5371(PA)) located in Tripura, India.
AttachmentSize
PDF icon Corrigendum 1 23.04 KB
PDF icon Corrigendum 2 49.88 KB
PDF icon Corrigendum 3 23 KB
PDF icon Corrigendum 4 23.45 KB
PDF icon Cancellation Notice23.45 KB
1180/2017 NIB NO.15/AGTP/HOP - (2.08 MB) 16th सितंबर 2015 Supply, Transportation, Transit Insurance, Delivery upto AGTP site and loading/unloading of Chemicals
AttachmentSize
PDF icon Corrigendum 1103.16 KB
1179/2017 NIQ 22/NEEPCO/AGTP-CC(EP)/CIVIL/2015-16 - (9.64 MB) 16th सितंबर 2015 Providing and fixing of false ceiling at the control room of the existing power house of AGTP plant
AttachmentSize
PDF icon Corrigendum 1 1.66 MB
PDF icon Extension 1 927.9 KB
PDF icon Extension 2 50.44 KB
PDF icon Extension 3672.56 KB
1178/2017 NIT NEEPCO/AGBP/U&WC/2015-16/15 - (416.21 KB) 08th दिसंबर 2015 Design, manufacture, assembly, supply, installation, testing and commissioning of 15 KWp Grid-Connected Roof-Top Solar PV system
AttachmentSize
PDF icon Extension Notice1201.8 KB
1177/2017 NIQ 03/2015-16/KHEP/C&P(C) - (219.59 KB) 15th सितंबर 2015 Supply and delivery of Lime and Bleaching Powder to KHEP
1176/2017 NIT KHEP/C&P/2015/247 - (147.23 KB) 10th दिसंबर 2015 Repairing of old and damaged stator of BHEL make 25 MW Hydro Turbine Generator of Khandong Power Station
AttachmentSize
PDF icon Corrigendum97.63 KB
PDF icon Corrigendum 2103.53 KB
PDF icon Corrigendum 398.65 KB
PDF icon Corrigendum 4115.02 KB
PDF icon Corrigendum 5174.35 KB
PDF icon Corrigendum 6173.92 KB
PDF icon Corrigendum 7173.95 KB
PDF icon Cancellation Notice81.29 KB
1175/2017 NIQ No.14/AGTP/HOP - (962.12 KB) 15th सितंबर 2015 Supply,installation and commissioning of differential Pressure Transmitter with remote display unit for inlet air filter house of Gas Turbine Unit,AGTP
AttachmentSize
PDF icon Corrigendum 2 108.44 KB
PDF icon Corrigendum 1 121.37 KB
PDF icon Corrigendum 03165.74 KB
PDF icon Corrigendum 4187.65 KB
1174/2017 NIT NO.17/2015 - (520.11 KB) 15th सितंबर 2015 Repairing of Mitsubishi Camp, Block No.4, at plant area, AGBP
1173/2017 NIB 28 - (3.75 MB) 10th दिसंबर 2015 Construction of B-Type quarters at AGTP
1172/2017 NIT No.88/DGM(C)/TGBPP/2015-16 - (2.81 MB) 14th सितंबर 2015 Cleaning jungle/grass in surrounding of the residential and non-residential buildings and road sides of TGBPP
1171/2017 NIT No.KHEP/C&P/2015/239 dated 11.09.2015 - (201.32 KB) 11th सितंबर 2015 Design, Engineering, Manufacturing, Testing, Supply, Delivery and Supervision of Installation & Commissioning of OFAF Cooler Assembly ,KHEP
1170/2017 NIT 44/2015-16/KHEP/C&P(C) - (153.59 KB) 11th सितंबर 2015 Construction of a New Kitchen and Sitting Hall at NEEPCO Recreation Club,KHEP
1169/2017 NIT KHEP/C&P/2015/248 - (273.72 KB) 11th दिसंबर 2015 Repairing of two numbers of butterfly valves in the valve house of 4x50 MW Kopili Power Station at KHEP
AttachmentSize
PDF icon Corrigendum110.12 KB
1168/2017 NIT NO.15/2015 - (652.01 KB) 10th सितंबर 2015 Providing CGI Sheet
1167/2017 NIQ RHEP/US&W-06/2015-16 - (355.82 KB) 09th सितंबर 2015 Supply of XLPE Insulated Armoured Aluminium LT Power Cable at RHEP
1166/2017 NIB 159 - (327.33 KB) 09th सितंबर 2015 Supply and delivery of Microsoft office licenses.
AttachmentSize
PDF icon Corrigendum 1421.41 KB
1165/2017 NIB No: 158 Dated 08/09/2015 - (73.35 KB) 08th सितंबर 2015 Limited tender for Renewal of Insurance policy of Khandong Power House of Kopili H.E. Project,Umrangso
AttachmentSize
PDF icon Corrigendum 147.72 KB
1164/2017 NIB 04 - (166.93 KB) 08th सितंबर 2015 Supply of 36 mm dia. TMT Bar for TrHEP
1163/2017 NIT 87/DGM(C)/TGBPP/2015 - (4.45 MB) 08th सितंबर 2015 Construction of WBM, bituminous surfacing over eastern periphery road of Solar Plant.
1162/2017 NIT No.01/Sr.M(E/M)/C&P/AGTCCPP/2015-16 - (1.63 MB) 14th दिसंबर 2015 Construction of a Dispensary unit, near main gate of the colony and balance work of toilet in open community hall.
1161/2017 NIT 10/2015-16/HCMW - (209.87 KB) 16th दिसंबर 2015 Construction of approach colony road by providing CC pavement from Colony Gate (Ch:112.80m to Ch:225.60m) towards the bent/slope portion at Hoz, RHEP
1160/2017 NIT KHEP/C&P(E)/2015/238 - (445.04 KB) 07th सितंबर 2015 Supply of Battery Bank, Charger and Distribution board and Disposal through Buy Back of old Batteries
AttachmentSize
PDF icon CORNIT06072017-483.pdf151.83 KB

Pages