HYDRO

English

Tamil nadu

  • he project was earlier withdrawn from NEEPCO in 2004 and now has been re-allotted.
English

Mizoram

  • MOA was signed with State Govt. on 26.03.2010.
  • Clearance of MEA for taking up the S&I works is awaited since both the projects involve international issue with Myanmar.
English

Mizoram

  • The project was earlier withdrawn from NEEPCO in 2004 and now has been re-allotted.
  • NEEPCO signed MOA with Govt. of Mizoram on 10.02.2015 for execution of the project.
  • Alternative study is in process to make the project economically viable.
English

Mizoram

  • MOA was signed with State Govt. on 26.03.2010.
  • After taking over the balance works of DPR preparation from CWC in 2014-15, DPR was prepared for an installed capacity of 17 MW and is under examination.
English

Mizoram

  • MOA was signed with State Govt. on 26.03.2010.
  • Clearance of MEA for taking up the S&I works is awaited since both the projects involve international issue with Myanmar.
English

Meghalaya

  • MOA was signed with State Govt. on 20.04.2012.
  • Draft DPR for an installed capacity of 75 MW was submitted to CEA for scrutiny by CEA.
  • As observed by CEA, the DPR is under revision for an installed capacity of 85 MW.
  • Comprehensive environmental studies are in process.

Testing future project

English