Archived Tender

Last Updated : 21/08/2025

SERIAL NO. TENDER NUMBER TENDER DATE SHORT NOTICE INVITING BIDS CORRIGENDUM Other Tender DOCUMENTS
1181/2017 NIB No. 160 - (156.13 KB) 16th Sep 2015 Supply of the mechanical parts required for MI , CI & BI of Units at Agartala Gas Turbine Plant ( Make of Unit: GE make frame V gas turbine supplied by EGT, Model No. G5371(PA)) located in Tripura, India.
AttachmentSize
PDF icon Corrigendum 1 23.04 KB
PDF icon Corrigendum 2 49.88 KB
PDF icon Corrigendum 3 23 KB
PDF icon Corrigendum 4 23.45 KB
PDF icon Cancellation Notice23.45 KB
    1180/2017 NIB NO.15/AGTP/HOP - (2.08 MB) 16th Sep 2015 Supply, Transportation, Transit Insurance, Delivery upto AGTP site and loading/unloading of Chemicals
    AttachmentSize
    PDF icon Corrigendum 1103.16 KB
    1179/2017 NIQ 22/NEEPCO/AGTP-CC(EP)/CIVIL/2015-16 - (9.64 MB) 16th Sep 2015 Providing and fixing of false ceiling at the control room of the existing power house of AGTP plant
    AttachmentSize
    PDF icon Corrigendum 1 1.66 MB
    PDF icon Extension 1 927.9 KB
    PDF icon Extension 2 50.44 KB
    PDF icon Extension 3672.56 KB
    1178/2017 NIT NEEPCO/AGBP/U&WC/2015-16/15 - (416.21 KB) 08th Dec 2015 Design, manufacture, assembly, supply, installation, testing and commissioning of 15 KWp Grid-Connected Roof-Top Solar PV system
    AttachmentSize
    PDF icon Extension Notice1201.8 KB
    1177/2017 NIQ 03/2015-16/KHEP/C&P(C) - (219.59 KB) 15th Sep 2015 Supply and delivery of Lime and Bleaching Powder to KHEP
    1176/2017 NIT KHEP/C&P/2015/247 - (147.23 KB) 10th Dec 2015 Repairing of old and damaged stator of BHEL make 25 MW Hydro Turbine Generator of Khandong Power Station
    AttachmentSize
    PDF icon Corrigendum97.63 KB
    PDF icon Corrigendum 2103.53 KB
    PDF icon Corrigendum 398.65 KB
    PDF icon Corrigendum 4115.02 KB
    PDF icon Corrigendum 5174.35 KB
    PDF icon Corrigendum 6173.92 KB
    PDF icon Corrigendum 7173.95 KB
    PDF icon Cancellation Notice81.29 KB
    1175/2017 NIQ No.14/AGTP/HOP - (962.12 KB) 15th Sep 2015 Supply,installation and commissioning of differential Pressure Transmitter with remote display unit for inlet air filter house of Gas Turbine Unit,AGTP
    AttachmentSize
    PDF icon Corrigendum 2 108.44 KB
    PDF icon Corrigendum 1 121.37 KB
    PDF icon Corrigendum 03165.74 KB
    PDF icon Corrigendum 4187.65 KB
    1174/2017 NIT NO.17/2015 - (520.11 KB) 15th Sep 2015 Repairing of Mitsubishi Camp, Block No.4, at plant area, AGBP
    1173/2017 NIB 28 - (3.75 MB) 10th Dec 2015 Construction of B-Type quarters at AGTP
    1172/2017 NIT No.88/DGM(C)/TGBPP/2015-16 - (2.81 MB) 14th Sep 2015 Cleaning jungle/grass in surrounding of the residential and non-residential buildings and road sides of TGBPP
    1171/2017 NIT No.KHEP/C&P/2015/239 dated 11.09.2015 - (201.32 KB) 11th Sep 2015 Design, Engineering, Manufacturing, Testing, Supply, Delivery and Supervision of Installation & Commissioning of OFAF Cooler Assembly ,KHEP
    1170/2017 NIT 44/2015-16/KHEP/C&P(C) - (153.59 KB) 11th Sep 2015 Construction of a New Kitchen and Sitting Hall at NEEPCO Recreation Club,KHEP
    1169/2017 NIT KHEP/C&P/2015/248 - (273.72 KB) 11th Dec 2015 Repairing of two numbers of butterfly valves in the valve house of 4x50 MW Kopili Power Station at KHEP
    AttachmentSize
    PDF icon Corrigendum110.12 KB
    1168/2017 NIT NO.15/2015 - (652.01 KB) 10th Sep 2015 Providing CGI Sheet
    1167/2017 NIQ RHEP/US&W-06/2015-16 - (355.82 KB) 09th Sep 2015 Supply of XLPE Insulated Armoured Aluminium LT Power Cable at RHEP
    1166/2017 NIB 159 - (327.33 KB) 09th Sep 2015 Supply and delivery of Microsoft office licenses.
    AttachmentSize
    PDF icon Corrigendum 1421.41 KB
      1165/2017 NIB No: 158 Dated 08/09/2015 - (73.35 KB) 08th Sep 2015 Limited tender for Renewal of Insurance policy of Khandong Power House of Kopili H.E. Project,Umrangso
      AttachmentSize
      PDF icon Corrigendum 147.72 KB
      1164/2017 NIB 04 - (166.93 KB) 08th Sep 2015 Supply of 36 mm dia. TMT Bar for TrHEP
      1163/2017 NIT 87/DGM(C)/TGBPP/2015 - (4.45 MB) 08th Sep 2015 Construction of WBM, bituminous surfacing over eastern periphery road of Solar Plant.
      1162/2017 NIT No.01/Sr.M(E/M)/C&P/AGTCCPP/2015-16 - (1.63 MB) 14th Dec 2015 Construction of a Dispensary unit, near main gate of the colony and balance work of toilet in open community hall.
      1161/2017 NIT 10/2015-16/HCMW - (209.87 KB) 16th Dec 2015 Construction of approach colony road by providing CC pavement from Colony Gate (Ch:112.80m to Ch:225.60m) towards the bent/slope portion at Hoz, RHEP
      1160/2017 NIT KHEP/C&P(E)/2015/238 - (445.04 KB) 07th Sep 2015 Supply of Battery Bank, Charger and Distribution board and Disposal through Buy Back of old Batteries
      AttachmentSize
      PDF icon CORNIT06072017-483.pdf151.83 KB
      1159/2017 NIT 09/2015-16/HCMW - (209.74 KB) 16th Dec 2015 Construction of approach colony road by providing CC pavement
      1158/2017 NIT AGBP/U&WC/2015-16/14 - (510.77 KB) 05th Sep 2015 Supply, installation, testing and commissioning of split air conditioner
      AttachmentSize
      PDF icon Time Extension271.04 KB
      1157/2017 NEEPCO/ED(RE)/Q-12/Vol-2/2015-16/703 - (1.44 MB) 03rd Sep 2015 Pre Bid Price Offer for EPC and subsequent O & M for 5 years for development of 70 MW Soloar PV Based Power Project in Bhadla Solar Park Phase-II,Rajasthan
      1156/2017 NEEPCO/ED(RE)/Q-12/Vol-2/2015-16/713 - (1.42 MB) 03rd Sep 2015 Pre Bid Price Offer for EPC and subsequest O & M for 5 years for development of 70 MW Soloar PV Based Power Project in Bhadla Solar Park Phase-II,Rajasthan
      1155/2017 NIT 03/AGTPCC/C&P/2015-16 - (137.8 KB) 16th Dec 2015 Supply of various cables
      AttachmentSize
      PDF icon Extension110.69 KB
      PDF icon Extension 2108.04 KB
      PDF icon Extension 3112.93 KB
      1154/2017 NEEPCO/ED(RE)/Q-12/Vol-2/2015-16/693 - (1.46 MB) 03rd Sep 2015 Pre Bid Price Offer for EPC and subsequest O & M for 5 years for development of 70 MW Soloar PV Based Power Project in Bhadla Solar Park Phase-II,Rajasthan
      1153/2017 NIT 04/AGTPCC/C&P/2015-16 - (136.3 KB) 16th Dec 2015 Supply of LED lamps
      1152/2017 NEEPCO/ED(RE)/Q-12/Vol-2/2015-16/683 - (1.43 MB) 03rd Sep 2015 Pre Bid Price Offer for EPC and subsequest O & M for 5 years for development of 70 MW Soloar PV Based Power Project in Bhadla Solar Park Phase-II,Rajasthan
      1151/2017 NIQ No.02/Sr.M(E/M)/C&P/AGTCCP/2015-16 - (687.69 KB) 16th Dec 2015 48 Ceiling Fan conforming to latest having BEE stipulations. Star Rating:5, Colour: White, Sweep:1200mm,230 volt AC as per IS:374/1979
      1150/2017 NEEPCO/ED(RE)/Q-12/Vol-2/2015-16/673 - (1.37 MB) 03rd Sep 2015 Pre Bid Price Offer for EPC and subsequest O & M for 5 years for development of 70 MW Soloar PV Based Power Project in Bhadla Solar Park Phase-II,Rajasthan
      1149/2017 NEEPCO/ED(RE)/Q-12/Vol-2/2015-16/663 - (1.39 MB) 03rd Sep 2015 Pre Bid Price Offer for EPC and subsequest O & M for 5 years for development of 70 MW Soloar PV Based Power Project in Bhadla Solar Park Phase-II,Rajasthan
      1148/2017 NIB No.02/HGC/DHEP/2015-16 - (163.48 KB) 16th Dec 2015 A stand alone, White LED Based, solar photovoltaic street lighting system consisting of solar photovoltaic (SPV) module
      1147/2017 NEEPCO/ED(RE)/Q-12/Vol-2/2015-16/653 - (1.51 MB) 03rd Sep 2015 Pre Bid Price Offer for EPC and subsequest O & M for 5 years for development of 70 MW Soloar PV Based Power Project in Bhadla Solar Park Phase-II,Rajasthan
      1146/2017 NEEPCO/ED(RE)/Q-12/Vol-2/2015-16/643 - (1.42 MB) 03rd Sep 2015 Pre Bid Price Offer for EPC and subsequest O & M for 5 years for development of 70 MW Soloar PV Based Power Project in Bhadla Solar Park Phase-II,Rajasthan
      1145/2017 NIQ 04/NEEPCO/SRMC/AGTP/2015-16 - (448.5 KB) 17th Dec 2015 AMC of Aqua Guard water purifiers at AGTP
      AttachmentSize
      PDF icon Extension Notice1203.03 KB
      PDF icon Extension Notice2205.01 KB
      1144/2017 NIT NO.05/NEEPCO/AGTP/EM/2015-16/NIT-05 - (203.4 KB) 01st Sep 2015 Supplying of skilled manpower in carrying out MAJOR INSPECTION of Unit # 4 of Agartala Gas Turbine Power Plant, NEEPCO Ltd
      AttachmentSize
      PDF icon Extension 1101.87 KB
      PDF icon Extension 2101.48 KB
      PDF icon Extension 3101.55 KB
      1143/2017 NIQ KHEP/C&P(E)/2014/249 - (689.85 KB) 17th Dec 2015 Supply, installation, testing and commissioning of a Telephone Exchange set with AMC at Khandong Power Station of KHEP
      AttachmentSize
      PDF icon Corrigendum276.65 KB
      PDF icon Corrigendum 253.23 KB
      PDF icon Corrigendum 354.14 KB
      1142/2017 NIT 21/NEEPCO/AGTP-CC(EP)/CIVIL/2015-16 - (6.57 MB) 31st Aug 2015 Repairing and construction of drain
      1141/2017 NIQ 13/AGTP/HOP - (966.04 KB) 29th Aug 2015 Supply of various electrical items
      AttachmentSize
      PDF icon Corrigendum 1176.51 KB
      PDF icon Corrigendum 2147.56 KB
      1140/2017 NIT 11/2015-16/HCMW - (96.44 KB) 18th Dec 2015 Renovation of Health Centre at Dikrong Power House, Hoz, A.P
      1139/2017 NIT 14/2015 - (619.36 KB) 28th Aug 2015 Repairing of Erectors hostel, providing and laying interlocking pavers, construction of storage tank for chemicals
      AttachmentSize
      PDF icon Corrigendum 224.87 KB
      1138/2017 NIB 157 - (1.07 MB) 26th Aug 2015 Appointment of Arranger for Private Placement of the NEEPCO PSU Bonds
      AttachmentSize
      PDF icon Corrigendum 1 804.68 KB
      PDF icon Corrigendum 2 329.11 KB
      PDF icon Corrigendum 3 327.82 KB
      PDF icon Corrigendum 4 50.35 KB
      Package icon Corrigendum 5722.74 KB
      1137/2017 NIT 07/2015 - (271.35 KB) 26th Aug 2015 Supply of Electrical Material
      AttachmentSize
      PDF icon Corrigendum 1671.31 KB
      PDF icon Extension Notice 45.89 KB
      PDF icon Extension Notice245.89 KB
      1136/2017 NIT 08/2015 - (336.51 KB) 26th Aug 2015 Supply of Electrical Luminaries
      AttachmentSize
      PDF icon Extension Notice45.89 KB
      PDF icon Extension Notice 2468.77 KB
      1135/2017 NIT 09/2015 - (272.54 KB) 26th Aug 2015 HT Electrical Line Materials
      AttachmentSize
      PDF icon Corrigendum 1 259.76 KB
      PDF icon Extension Notice 39.46 KB
      PDF icon Extension Notice2 468.77 KB
      PDF icon Extension Notice 3 902.72 KB
      PDF icon Extension Notice 364.56 KB
      1134/2017 DNIT KHEP/C&P(E)/2015/237 - (123.75 KB) 26th Aug 2015 Repairing and Maintenance of Internal Electrification
      AttachmentSize
      PDF icon Corrigendum 102.17 KB
      1133/2017 NIB 156 - (105.51 KB) 25th Aug 2015 Limited Tender for Renewal of Public Liability Insurance Policy
      AttachmentSize
      PDF icon Corrigendum 147.54 KB
      1132/2017 NIQ 05/Sr M(E/M)/C&P/AGTPCC/2015-16 - (1.39 MB) 21st Dec 2015 Supply of Water supply and Sanitary fittings
      AttachmentSize
      PDF icon Addendum528.2 KB
      PDF icon Extension 1200.92 KB
      PDF icon Extension 2203.31 KB
      PDF icon Extension 3207.13 KB

      Pages