संग्रहित निविदा

आखिरी अपडेट: 22/05/2020

क्रमांक निविदा संख्या निविदा दिनांक संक्षिप्त सूचना बोली निविदाएं शुद्धिपत्र विस्तृत बोली दस्तावेज
1108/2017 NIT AGBP/DGM(E/M)/F&S/2015-16/02 - (2.37 MB) 06th जनवरी 2016 Supply of a combined water cum Foam Tender for Assam Gas Based Power Plant.
AttachmentSize
PDF icon Extension Notice319.42 KB
1107/2017 NIQ NO.TrHEP_05/2015 - (98.44 KB) 30th जुलाई 2015 Supply of GSBC/boulder as & when required by Tuirial Hydro Electric Project, NEEPCO Ltd. Mizoram
1106/2017 NIT No.KHEP/C&P/2015/234 - (198.61 KB) 30th जुलाई 2015 Day to day maintenance including Annual Planned Maintenance of 4x50 MW Kopili Power station at KHEP,Assam
AttachmentSize
PDF icon Corrigendum 243.36 KB
1105/2017 NIQ NO.11/AGTP/HOP - (742.97 KB) 29th जुलाई 2015 Supply of MS Pipe & Pipe Clamp for AGTP
AttachmentSize
PDF icon Corrigendum 1192.08 KB
1104/2017 NIT NEEPCO/ED(RE)/WPP/AP&G/05 - (156.25 KB) 05th जनवरी 2016 Engineering, Procurement and Construction (EPC) contract for 70 MW Wind Power Project at suitable site at one location in the states of Andhra Pradesh and/or Gujarat.
AttachmentSize
PDF icon Corrigendum 1127.29 KB
PDF icon Corrigendum 2101.46 KB
PDF icon Corrigendum 3336.81 KB
PDF icon Corrigendum 494.37 KB
PDF icon Corrigendum 582.57 KB
PDF icon Corrigendum 6125.15 KB
PDF icon Corrigendum 794.41 KB
PDF icon Cancellation Notice124.87 KB
1103/2017 NIT NO.85/DGM(C)/TGBPP/2015 - (578.6 KB) 28th जुलाई 2015 Pest and Rodent Control Management at STG Building of TGBPP
AttachmentSize
PDF icon Extension 178.98 KB
1102/2017 NIT No. NEEPCO/ND-86/1134 - (137.3 KB) 28th जुलाई 2015 Supply, Installation & Commissioning of 100kva Voltage Stabilizer for North Eastern Electric Power Corporation Ltd, (NEEPCO), at New Delhi.
1101/2017 NIT NO.05/2015/GHY - (1.44 MB) 28th जुलाई 2015 Construction of Boundary Fencing around Automatic Weather Station (AWS) proposed to install at Doyang River Basin of Nagaland
1100/2017 NIB 179 - (183.83 KB) 05th जनवरी 2016 Supply of Consumables for Photocopier machine, Fax machine and Printer
AttachmentSize
PDF icon Corrigendum 128.04 KB
PDF icon Cancellation Notice122.93 KB
1099/2017 NIT NO.41/2015-16/KHEP/C&P(C) - (207.18 KB) 24th जुलाई 2015 Protection work at hill slope near outlet portal of Umrong Tunnel, KHEP
1098/2017 NIT NO.07/SRMC/AGTP/2015-16 - (448.15 KB) 24th जुलाई 2015 Maintenance of turf areas with broad leaf grass including flower/fruit bearing plants on the front side of Qtr.No A 16, A 17 & A 18 upto the boundary wall etc.
1097/2017 NIB NO.10/AGTP/HOP - (331.5 KB) 24th जुलाई 2015 Procurement of self cleaning Inlet Air Filter Elements for Air Intake System
AttachmentSize
PDF icon Corrigendum 100.38 KB
PDF icon Corrigendun2104.52 KB
1096/2017 NIQ 15/NEEPCO/AGTCCPP/C&P/2015-16 - (148.8 KB) 06th जनवरी 2016 Supply, installation ,testing and commissioning of ductable Air Conditioner and its accessories for Agartala Gas Turbine Combine Cycle Power Plant
AttachmentSize
PDF icon Extension 1110.12 KB
PDF icon Extension 2112.13 KB
1095/2017 NIQ NO.03/2015/IT/DHEP - (538.02 KB) 22nd जुलाई 2015 Supply of IT Consumable
1094/2017 NIQ 14/NEEPCO/AGTPCC/C&P/2015-16 - (147.43 KB) 06th जनवरी 2016 Supply of Water Hydrant Hose pipe (RRL Hose and its couplings) for Agartala Gas Turbine Combine Cycle Power Plant
AttachmentSize
PDF icon Extension Notice 1116.89 KB
PDF icon Extension Notice 2114.87 KB
PDF icon Extension 3113.37 KB
1093/2017 NIB NO.154 - (60.32 KB) 22nd जुलाई 2015 Limited tender for Providing Directors and Officers Liability Insurance
AttachmentSize
PDF icon Corrigendum 147.1 KB
1092/2017 NIT NO.40/2015-16/KHEP/C&P(C) - (225.81 KB) 22nd जुलाई 2015 Housekeeping of Kopili Power Station alongwith field hostel etc.
1091/2017 NIT No.12/Sr.M(E &M)/C&P/AGTCCPP/2015-16 - (1017.73 KB) 06th जनवरी 2016 New lawn development work and its monthly maintenance thereof.
1090/2017 NIT NO.39/2015-16/KHEP/C&P(C) - (226.52 KB) 21st जुलाई 2015 Maintenance of PRC cum Botanical Garden, Nursery, different parks etc. at KHEP
AttachmentSize
PDF icon Corrigendum 1 86.55 KB
1089/2017 NIB No 152 - (140.18 KB) 20th जुलाई 2015 Construction of HOP Residence(1 Block) at Doyang Hydro Electric Plant, Doyang, Nagaland
AttachmentSize
PDF icon Cancellation Notice16.65 KB
1088/2017 NIB 12 - (223.42 KB) 08th जनवरी 2016 Supply of 32mm dia TMT Bars for Tuirial H.E. Project
1087/2017 NIB No 153 - (140.7 KB) 20th जुलाई 2015 Construction of Type-C Quarters(2-blocks) at Doyang Hydro Electric Project, Doyang, Nagaland
AttachmentSize
PDF icon Cancellation Notice16.78 KB
1086/2017 NIQ NO.NEEPCO/ND/F-117/2230 - (65.26 KB) 11th जनवरी 2016 Supply of SMF UPS batteries under buy back basis at Coordination Office, NEEPCO Ltd., 15 NBCC Tower, UG Floor, Bhikaji Cama Place, New Delhi.
1085/2017 NIB NO.151 - (96.04 KB) 20th जुलाई 2015 Supply of LT cables at Kimi site of Kameng HEP, West Kameng District, Arunachal Pradesh complete in all respects
AttachmentSize
PDF icon Corrigendum 1 61.36 KB
PDF icon Corrigendum 2 61.38 KB
PDF icon Corrigendum 261.38 KB
1084/2017 NIT NO.KHEP/C&P(E)/2015/232 - (420.33 KB) 20th जुलाई 2015 Supply and delivery of cable items (Control & CT cables) required for Khandong & Kopili Stage _II Power Stations
AttachmentSize
PDF icon Corrigendum 106.22 KB
PDF icon Corrigendum 171.5 KB
1083/2017 NIQ NO.KHEP/2015/233 - (343.31 KB) 20th जुलाई 2015 Supply of consumable items to KHEP
AttachmentSize
PDF icon Corrigendum 59.2 KB
PDF icon Corrigendum 259.56 KB
1082/2017 NIT AGBP/U&WC/2015-16/16 - (2.06 MB) 11th जनवरी 2016 Supply, installation, testing and commissioning of Split Air Conditioner at AGBP
1081/2017 NIT NO.19/NEEPCO/AGTP-CC(EP)/CIVIL/2015-16 - (163.45 KB) 17th जुलाई 2015 Repairing and outside painting of DM Plant building of AGTP CC Project
1080/2017 NIB NO.148 - (202.35 KB) 15th जुलाई 2015 Construction of Senior Executive Hostel (1 Block) at Doyang Hydro Electric Plant, Doyang, Nagaland
AttachmentSize
PDF icon CORNIB06072017-443.pdf668.67 KB
1079/2017 NIT 10/2016 - (506.97 KB) 11th जनवरी 2016 Reapairing of Distribution Transformer at Tuirial Hydro Electric Project, Mizoram
1078/2017 NIB 13 - (282.83 KB) 12th जनवरी 2016 Supply of Portland Pozzolana Cement (PPC) conforming to IS:1489 for Tuirial H. E. Project
1077/2017 NIB NO.149 - (202.28 KB) 15th जुलाई 2015 Construction of Type-E Quarters (1 Block) at Doyang Hydro Electric Plant, Doyang, Nagaland
AttachmentSize
PDF icon Cancellation Notice670.1 KB
1076/2017 NIT NO.NEEPCO/ND-36/2268 - (1.12 MB) 14th जनवरी 2016 Supply & installation of Godrej make compactor storage system and Safety Locker (Godrej Filo Digital 55-Black) to be installed at Coordination Office, North Eastern Electric Power Corporation Ltd, (NEEPCO), 15, NBCC Tower, Bhikaji Cama Place, New Delhi
1075/2017 NIB NO.150 - (201.47 KB) 15th जुलाई 2015 Construction of Type-F Quarters (1 Block) at Doyang Hydro Electric Plant, Doyang, Nagaland
AttachmentSize
PDF icon Cancellation Notice636.18 KB
1074/2017 NIQ NO.07/AGTP/HOP - (811.99 KB) 14th जुलाई 2015 Supply of Chain Pulley Block for AGTP
AttachmentSize
PDF icon Corrigendum 1161.96 KB
1073/2017 NIQ 16/Sr M(E/M)/C&P/AGTCCPP/2015-16 - (1 MB) 16th जनवरी 2016 Supply of galvanized steel chain link fence fibre for Agartala Gas Turbine Combine Cycle Power Plant
1072/2017 NIQ 01 - (727.74 KB) 19th जनवरी 2016 Supply of Paint and Hardware materials for Building Maintenance workS at AGBP
1071/2017 NIT 96/DGM(C)/TGBPP/2016 - (1.59 MB) 19th जनवरी 2016 Construction of RCC W/C cum bath for canteen building at TGBPP
AttachmentSize
PDF icon Extension Notice382.33 KB
1070/2017 NIT KHEP/C&P(E)/2016/250 - (453.47 KB) 20th जनवरी 2016 Supply of one set of 40 KVA Silent Generator Set at KHEP
AttachmentSize
PDF icon Corrigendum481.82 KB
PDF icon Corrigendum 267.55 KB
PDF icon Corrigendum 366.2 KB
1069/2017 NIQ NO.08/AGTP/HOP - (742.55 KB) 14th जुलाई 2015 Supply of Wire Rope Sling for AGTP
AttachmentSize
PDF icon Corrigendum 1 161.31 KB
PDF icon Corrigendum 2182.21 KB
1068/2017 NIB 180 - (150.84 KB) 21st जनवरी 2016 Renewal of Insurance Policy for the assets of Pare Hydro Electric Project
1067/2017 NIQ NO.09/AGTP/HOP - (202.35 KB) 14th जुलाई 2015 Supply of Various Tools for AGTP
AttachmentSize
PDF icon Corrigendum 1668.67 KB
1066/2017 NIT NO.18/NEEPCO/AGTP-CC(EP)/CIVIL/2015-16 - (96.28 KB) 13th जुलाई 2015 Construction of Toe Wall surrounding the security check post
1064/2017 NIT NO.05/SRMC/AGTP/2015-16 - (468.4 KB) 13th जुलाई 2015 Providing, fitting and fixing of Steel Doors
1063/2017 NIT No.53/2015-16/KHEP/C&P - (236.07 KB) 22nd जनवरी 2016 Patch Repairing including premix surfacing of NEEPCO Permanent Colony roads at KHEP, Umrongso, Dima Hasao, Assam.
1062/2017 NIT NO.06/SRMC/AGTP/2015-16 - (544.04 KB) 13th जुलाई 2015 Providing, fitting and fixing of Steel Doors
1061/2017 NIT No.98/DGM(C)/TGBPP/2016 - (1.97 MB) 22nd जनवरी 2016 Construction of A-type Residential Quarter at TGBPP colony under 101 MW TGBPP at Monarchak, Sonamura, Tripura
1060/2017 NIQ No.17/Sr.M(E/M)/C&P/AGTCCPP/15-16 - (1.01 MB) 22nd जनवरी 2016 Sealed quotations are invited from Manufacturer /Authorized dealer for supply of one number of Vibration Meter and Bearing Analyzer.
AttachmentSize
PDF icon Extension 1218.61 KB
1059/2017 NIB NO.146 - (95.65 KB) 09th जुलाई 2015 Supply, Transportation to site, handling and freight, Insurance from the source of supply till receipt at site of LED luminaires for O&M plants of NEEPCO, complete in all respects
AttachmentSize
PDF icon Cancellation Notice58.63 KB
1058/2017 NIB 181 - (151.87 KB) 22nd जनवरी 2016 Renewal of Insurance Policy of RHEP

Pages