Tender

Last Updated : 10/12/2018

SERIAL NO. TENDER NUMBER TENDER DATE SHORT NOTICE INVITING BIDS CORRIGENDUM DETAILED BID DOCUMENTS
1590/2018 NIT No.94/NEEPCO/AGTCCPP/C&P/2017-18
AttachmentSize
PDF icon 100420181100-1590.pdf2.57 MB
29/03/2018 Annual Maintenance of Blue Star Make Ductable AC machine at various location of NEEPCO, AGTCCPP, Agartala
AttachmentSize
PDF icon Extension 1274.41 KB
PDF icon Extension 3216.65 KB
1604/2018 NIT No.140/TGBP/2017-18
AttachmentSize
PDF icon 240420182001-1604.pdf2.85 MB
26/03/2018 Construction of boundary wall for the HOP residence at TGBP, NEEPCO
AttachmentSize
PDF icon Corrigendum 2666.18 KB
1589/2018 NIT NO.RHEP/DGM/40/2017-18
AttachmentSize
PDF icon 290320180900-1589.pdf1014.1 KB
26/03/2018 Construction of gabion structure for protection of erosion
1588/2018 NIT NO.29/2017-18
AttachmentSize
PDF icon 290320180100-1588.pdf685.01 KB
26/03/2018 Supply of 50 Nos. 10 Mtrs Long Steel Tubular Pole (in two pieces) as per IS 2713:1986 (Part-I&II)
1587/2018 NIT NO.RHEP/DGM/35/2017-18
AttachmentSize
PDF icon 290320180900-1587.pdf134.17 KB
26/03/2018 Construction of RCC drain along the recently repaired stretch of Pitapool dam-site road from chainage 0.211 Km to 0.311 Km (Group-I)
1586/2018 NIT NO.RHEP/DGM/36/2017-18
AttachmentSize
PDF icon 290320180902-1586.pdf134.17 KB
26/03/2018 Construction of RCC drain along the recently repaired stretch of Pitapool dam-site road from chainage 0.311 Km to 0.421 Km (Group-II)
1585/2018 NIT NO.RHEP/DGM/37/2017-18
AttachmentSize
PDF icon 290320180900-1585.pdf134.2 KB
26/03/2018 Construction of RCC drain along the recently repaired stretch of Pitapool dam-site road from chainage 0.421 Km to 0.531 Km (Group-III)
1584/2018 NIT NO.RHEP/DGM/38/2017-18
AttachmentSize
PDF icon 290320180900-1584.pdf134.29 KB
26/03/2018 Construction of RCC drain along the recently repaired stretch of Pitapool dam-site road from chainage 0.531 Km to 0.641 Km (Group-IV)
1583/2018 NIT NO.RHEP/DGM/39/2017-18
AttachmentSize
PDF icon 290320180900-1583.pdf134.26 KB
26/03/2018 Construction of RCC drain along the recently repaired stretch of Pitapool dam-site road from chainage 0.641 Km to 0.752 Km (Group-V)
1463/2018 NIT NO.93/NEEPCO/AGTCCPP/C&P/2017-18
AttachmentSize
PDF icon 290320181100-1463.pdf2.91 MB
26/03/2018 Maintenance of broad leaf grass turfed area
AttachmentSize
PDF icon Extension 1337.03 KB
PDF icon Extension 3231.54 KB
1459/2018 NIT No.140/DGM(C)/TGBP/2017-18
AttachmentSize
PDF icon 270320182001-1459.pdf2.85 MB
26/03/2018 Construction of boundary wall for the HOP residence at TGBP, NEEPCO
AttachmentSize
PDF icon CORNIT27032018-569.pdf176.32 KB
1582/2018 NIT No.11/2017-18/ HCMW
AttachmentSize
PDF icon 290320180100-1582.pdf652.07 KB
22/03/2018 Construction of RRM retaining wall near helipad at power house colony hoz, RHEP. (Group-I).
1581/2018 NIT No.12/2017-18/ HCMW
AttachmentSize
PDF icon 290320180100-1581.pdf652.05 KB
22/03/2018 Construction of RRM retaining wall near helipad at power house colony hoz, RHEP. (Group-II)
1580/2018 NIT No.13/2017-18/ HCMW
AttachmentSize
PDF icon 290320180100-1580.pdf652 KB
22/03/2018 Construction of RRM retaining wall near helipad at power house colony hoz, RHEP. (Group-III).
1579/2018 NIT No.14/2017-18/ HCMW
AttachmentSize
PDF icon 290320180100-1579.pdf652.1 KB
22/03/2018 Construction of RRM protection wall and CC drain in between store no. 1 & 2 of power house hoz. (Group-1).
1578/2018 NIT No.15/2017-18/ HCMW
AttachmentSize
PDF icon 290320180100-1578.pdf652.1 KB
22/03/2018 Construction of RRM protection wall and CC drain in between store no. 1 & 2 of power house hoz. (Group-2).
1577/2018 NIT No.NEEPCO/AGBP/ST&AUX/2016-17/10
AttachmentSize
PDF icon 290320181000-1577.pdf278.89 KB
21/03/2018 Chemical Treatment of cooling water system at AGBP, Bokuloni, Assam
1575/2018 NIT No.AGBP/CWC/15
AttachmentSize
PDF icon 290320181000-1575.pdf608.67 KB
21/03/2018 Removing of existing damage synthetic layer & recoating of 20mm thick premix carpeting over existing lawn tennis court of AGBP, Assam
1574/2018 NIT No.RHEP/DGM/32/2017-18
AttachmentSize
PDF icon 290320180900-1574.pdf134.29 KB
21/03/2018 Construction of RCC drain along the Pitapool dam-site road from old Gammon quarry towards the dam from chainage 0.000 Km to 0.110 Km-Type I, RHEP. (Group-I).
1573/2018 NIT No.RHEP/DGM/33/2017-18
AttachmentSize
PDF icon 290320180900-1573.pdf134.41 KB
21/03/2018 Construction of RCC drain along the Pitapool dam-site road from old Gammon quarry towards the dam from chainage 0.112 Km to 0.280 Km and again from chainage 0.282 Km to 0.330 Km-Type II, RHEP. (Group-II).
1572/2018 NIB No.274/HQ
AttachmentSize
PDF icon 290320180100-1572.pdf1.01 MB
20/03/2018 Supply of Photocopier Paper
1571/2018 NIB No.275/HQ
AttachmentSize
PDF icon 290320180100-1571.pdf1.04 MB
20/03/2018 Supply, Delivery & Installation of New Desktop PC
AttachmentSize
PDF icon Corrigendum 1368.93 KB
PDF icon Corrigendum 2226.32 KB
1570/2018 NIB No.09/IT
AttachmentSize
PDF icon 290320180100-1570.pdf489.81 KB
16/03/2018 Maintenance Contract of 5 (five) No.s of HP DL580G5 Server (Intel Xenon Quad Core, 20GB DDR2 RAM, 4 no of 72 GB, 1000 RPM HDD, Tape drive HP Storage DAT 72)
AttachmentSize
PDF icon Corrigendum 1410.85 KB
PDF icon Corrigendum 3411.61 KB
PDF icon Corrigendum 2411.2 KB
1569/2018 NIB No.04/AGBP
AttachmentSize
PDF icon 290320181000-1569.pdf880.75 KB
16/03/2018 Providing exhaust fan in toilets of quarters of AGBP colony including wiring , supplying, fitting along with required civil works as per Ann-I
1568/2018 NIT No.90/2017-18/KHEP/C&P
AttachmentSize
PDF icon 290320180700-1568.pdf2.34 MB
14/03/2018 Providing wall and floor tiles in toilet, bathroom and kitchen at B-Type (Quarter No. 6, 7, 8,9) in the permanent colony, KHEP Umrongso (group II)
AttachmentSize
PDF icon Corrigendum 1306.71 KB
1567/2018 NIT No.AGBP/DGM(E/M)/17-18/02
AttachmentSize
PDF icon 290320181000-1567.pdf359.19 KB
13/03/2018 Fire fighting system for entering into contract in connection with maintenance contract for existing fire detection and protection system of AGBP
AttachmentSize
PDF icon Extension 1159.54 KB
1566/2018 NIQ No.NEEPCO/ND-103/1055
AttachmentSize
PDF icon 290320180100-1566.pdf89.29 KB
12/03/2018 Notice inviting quotations for comprehensive annual maintenance contract for Air Conditioners ? Windows/ Spilt type
1454/2018 NIB NO.12032018-NEW
AttachmentSize
PDF icon 120320180100-1454.pdf67.55 KB
12/03/2018 Supply of IP Cameras
1564/2018 NIT No.RHEP/DGM/25/2017-18
AttachmentSize
PDF icon 290320180900-1564.pdf134.12 KB
08/03/2018 Construction of toe wall along the Pitapool Dam site road from old Gammon Quarry towards the Dam, RHEP. Group-III
1563/2018 NIT No.RHEP/DGM/26/2017-18
AttachmentSize
PDF icon 290320180900-1563.pdf134.12 KB
08/03/2018 Construction of Toe-wall along the recently repaired stretch of Pitapool Dam site road from Ch. 0.212 Km to 0.247 Km, RHEP (Group-I).
1562/2018 NIT No.RHEP/DGM/27/2017-18
AttachmentSize
PDF icon 290320180900-1562.pdf134.12 KB
08/03/2018 Construction of Toe-wall along the recently repaired stretch of Pitapool Dam site road from Ch. 0.212 Km to 0.247 Km, RHEP (Group-I).
1561/2018 NIT No.RHEP/DGM/28/2017-18
AttachmentSize
PDF icon 290320180900-1561.pdf134.1 KB
08/03/2018 Construction of Toe-wall along the recently repaired stretch of Pitapool Dam site road from Ch. 0.573 Km to 0.640 Km, RHEP (Group-III).
1560/2018 NIT No.RHEP/DGM/29/2017-18
AttachmentSize
PDF icon 290320180900-1560.pdf134.17 KB
08/03/2018 Construction of Toe-wall along the recently repaired stretch of Pitapool Dam site road from Ch. 0.640 Km to 0.707 Km, RHEP (Group-IV).
1559/2018 NIT No.RHEP/DGM/30/2017-18
AttachmentSize
PDF icon 290320180900-1559.pdf134.2 KB
08/03/2018 Construction of Toe-wall along the recently repaired stretch of Pitapool Dam site road from Ch. 0.707 Km to 0.794 Km, RHEP (Group-V).
1557/2018 NIB No.272/HQ
AttachmentSize
PDF icon 290320180100-1557.pdf1.05 MB
06/03/2018 ANNUAL MAINTENANCE CONTRACT SERVICES & SUPPORT FOR PHOTOCOPIER /FAX MACHINE /MULTIFUNTIONAL PRINTER AT CORPORATE OFFICE NEEPCO, SHILLONG
AttachmentSize
PDF icon Corrigendum 1496.91 KB
1554/2018 NIT No.NEEPCO/ND-27/1033
AttachmentSize
PDF icon 290320180100-1554.pdf310.71 KB
05/03/2018 Tender for Security Services for NEEPCO Transit Camp at F-18, Hauz Khaz Enclave, New Delhi
AttachmentSize
PDF icon Extension 134.22 KB
1553/2018 NIB No 04
AttachmentSize
PDF icon 290320180100-1553.pdf255.13 KB
27/02/2018 Auction for Disposal of old/used three numbers gas engines of Gas Booster station.
AttachmentSize
PDF icon Corrigendum 1416.9 KB
1552/2018 NIT NO.139/DGM(C)/TGBP/2017-18
AttachmentSize
PDF icon 290320182001-1552.pdf1013.87 KB
27/02/2018 Development of a Football Playground at TGBPP
AttachmentSize
PDF icon Corrigendum 2323.97 KB
1551/2018 NIB AGBP/CWC/14
AttachmentSize
PDF icon 290320181000-1551.pdf1.27 MB
26/02/2018 Construction of boundary fencing around Green Belt no 6 at AGBP
1550/2018 NIB No.AGBP/CWC/13
AttachmentSize
PDF icon 290320181000-1550.pdf1.28 MB
20/02/2018 Construction of Boundary fencing around Green Belt No.5 at AGBP, NEEPCO Ltd, Bokuloni, Assam
1549/2018 NIB No.AGBP/CWC/11
AttachmentSize
PDF icon 290320181000-1549.pdf1.15 MB
19/02/2018 Construction of Boundary fencing around Green Belt No.3 at AGBP, NEEPCO Ltd, Bokuloni, Assam
1548/2018 NIB No.AGBP/CWC/12
AttachmentSize
PDF icon 290320181000-1548.pdf1.15 MB
19/02/2018 Construction of Boundary fencing around Green Belt No.4 at AGBP, NEEPCO Ltd, Bokuloni, Assam
1547/2018 NIB No.AGBP/CWC/10
AttachmentSize
PDF icon 290320181000-1547.pdf1.16 MB
16/02/2018 Construction of Boundary fencing around Green Belt No.2 at AGBP, NEEPCO Ltd
1546/2018 NIT No.AGBP/CWC/09
AttachmentSize
PDF icon 290320181000-1546.pdf1.17 MB
16/02/2018 Construction of boundary fencing around Green Belt No.1 at AGBP, Bokuloni, Assam
AttachmentSize
PDF icon Corrigendum 1205.37 KB
1451/2018 NIT NO.TrHEP-04/2018
AttachmentSize
PDF icon 280220181200-1451.pdf146.25 KB
14/02/2018 Supply of Mahindra Bolero LX 4WD BS4 with A/c & Power steering
1451/2018 NIT NO.TrHEP-04/2018
AttachmentSize
PDF icon 280220181200-1451.pdf146.25 KB
14/02/2018 Supply of Mahindra Bolero LX 4WD BS4 with A/c & Power steering
1543/2018 NIB No.AGBP/CWC/08
AttachmentSize
PDF icon 290320181000-1543.pdf1.15 MB
08/02/2018 Earth filling in the Green Belt no.9 for development of Arboretum at plant area of AGBP, NEEPCO Ltd, Bokuloni
1542/2018 NIT No.KHEP/C&P/2018/287
AttachmentSize
PDF icon 290320180700-1542.pdf534.77 KB
06/02/2018 Supply and Delivery of Armoured / Unarmoured Cables required for Kopili Power Station of Kopili Hydro Electric Plant, NEEPCO Ltd. , Umrongso , Dima Hasao, Assam
AttachmentSize
PDF icon Corrigendum 1176.32 KB
PDF icon Corrigendum 2157.13 KB
PDF icon Corrigendum 3732.83 KB
PDF icon Corrigendum 4417.71 KB
1541/2018 NIT No.KHEP/C&P(E)/2018/286
AttachmentSize
PDF icon 290320180700-1541.pdf2.42 MB
02/02/2018 Internal Electrical ofKhaniong Valve House at Kopili Hydro Elecnic Plant, NEEPCO Ltd. ,Umrongso, Dima Hasao District, Assam
1540/2018 NIT No.03/2018/TrHEP
AttachmentSize
PDF icon 290320181200-1540.pdf158.35 KB
31/01/2018 Construction of Approach Road to Intake Gate Shaft (Metalling & Carpeting) at Tuirial Hydro Electric Project, Mizoram (Approx. Length: 565m)

Pages