NEEPCO's clarification on Queries posted By Bidders

Last Updated : 15/10/2018

TENDER NUMBER TENDER DATE TENDER DESCRIPTION CLARIFICATION
NIB No.13/IT - (702.52 KB) 12th Sep 2018 Maintenance Contract of Printers (195 Printers of different makes and models)
AttachmentSize
PDF icon Clarifications to bidder queries223 KB
NIB No.294/HQ - (7.04 MB) 05th Sep 2018 Operation & Maintenance including House Keeping of NEEPCO Guest House Located in K.L.Complex, Opposite NEEPCO Office, Shillong
AttachmentSize
PDF icon Clarification to Bid queries63.77 KB
NIB No.291/HQ - (3.38 MB) 21st Aug 2018 Supply of Office Stationery and Printing Materials
AttachmentSize
PDF icon Clarification to Bidder's Query 137.39 KB
NIB No.292/HQ - (581.5 KB) 31st Aug 2018 IMPLEMENTATION OF ERP IN NEEPCO
AttachmentSize
PDF icon Clarification No.1651.92 KB
PDF icon Clarification No.21.61 MB
PDF icon Clarification No.3648.44 KB
NIB No.290/HQ - (6.58 MB) 13th Aug 2018 Supply of brand new vehicle on monthly hire charge basis at Corporate Office Shillong
AttachmentSize
PDF icon Clarifications to Bid queries-159.63 KB
PDF icon Clarifications to Bid queries-2306.62 KB
NIB No.287/HQ - (1.18 MB) 13th Jul 2018 Supply, Installation and Commissioning of Structured Local Area Network (LAN) at Pare Hydro Electric Project, Papum Pare District,Arunachal Pradesh
AttachmentSize
PDF icon PRE-BID CLARIFICATIONS214.26 KB
NIB No.286/HQ - (808.52 KB) 29th Jun 2018 Bid Management Consultancy for "Award of EPC Contract Works for setting up of 200 MW capacity Solar PHOTOVOLTAIC Power Project along with its comprehensive O&M in Dhenkanal, Odisha"
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query539.77 KB
NIB No.259/HQ - (464.51 KB) 24th Nov 2017 Implementation of Enterprise Resource Planning at NEEPCO
AttachmentSize
PDF icon PRE-BID CLARIFICATIONS2.14 MB
PDF icon 3rd PRE-BID CLARIFICATION984.54 KB
PDF icon 4th PRE-BID CLARIFICATION520.65 KB
NIB 264/HQ - () 03rd Jan 2018 Purchase of 2(two) nos water cum foam type Fire Tender of 3500 Litre capacity -1 (one) each for Pare HEP and Tuirial HEP
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query122.45 KB
PDF icon Clarification no.2 to Bidder’s query122.45 KB
NIB No.261/HQ - (1.14 MB) 21st Dec 2017 Design, Manufacture, Supply, Installation & Commissioning of 1 (one) no. of Hydraulically operated Trash Rack Cleaning Machine (TRCM), RHEP, Yazali
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query261.5 KB
NIB No.260/HQ - (1.13 MB) 14th Dec 2017 RENOVATION & MODERNISATION OF GAS BOOSTER STATION (4th UNIT) of Assam Gas Based Power Plant Bokuloni, Dibrugarh, Assam, India
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query871.88 KB
PDF icon Minutes of Pre Bid Meeting1.01 MB
NIB No.236/HQ - (398.84 KB) 18th Apr 2017 Supply of New Desktop PC and Printers
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query272.53 KB
NIB No.226 - (356.88 KB) 09th Feb 2017 Design, Engineering, Manufacturing, Testing at manufacturers works before dispatch, supply, transportation, transit insurance, delivery at project site, supervision of erection & commissioning
AttachmentSize
PDF icon Clari1NIB226_22032017.pdf3.52 MB
Package icon Clarification no.2 to Bidder’s query2.3 MB
NIB 215 - (412.89 KB) 03rd Nov 2016 Supply and delivery of Microsoft Office Standard 2016 licenses
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query280.28 KB
PDF icon Clarification no.2 to Bidder’s query254.97 KB
NIQ 44/SrM(E/M)/C&P/AGTCCPP/2016-17 - (2.13 MB) 22nd Jul 2016 Supply, transportation, transit insurance and delivery of consumable items as required for AGTCCPP
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query468.45 KB
NIB 201 - (117.44 KB) 01st Jun 2016 Supply, installation, commissioning and comprehensive warranty and maintenance of DAM SAFETY MONITORING SYSTEM for NEEPCO?s existing Dams
AttachmentSize
PDF icon Minutes of Pre Bid Meeting742.79 KB
PDF icon Clarification no.1 to Bidder’s query44.52 KB
NIB 02/IT - (449.79 KB) 08th Apr 2016 Annual Maintenance Contract of SAN system
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query588.42 KB
NIB NO.182 - (378.32 KB) 04th Feb 2016 Supply of mechanical parts for GE make Gas Turbine, AGTP
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query651.26 KB
PDF icon Clarification no.1 to Bidder’s query566.63 KB
PDF icon Clarification no.3 to Bidder’s query572.88 KB
NIB 178 - (353.25 KB) 07th Dec 2015 Design, Engineering, Manufacture, Supply, Transportation, Delivery, Insurance, Erection and Commissioning of 1 no Butterfly valve for 1x25 MW Kopili Stage II and 1 no Spherical Valve for 4x50 MW Kopili Power Stations
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query118.31 KB
PDF icon Clarification no.2 to Bidder’s query88.2 KB
NIB 184 - (1.62 MB) 15th Feb 2016 Renewal of Insurance Policy of Assets of Assam Gas Based Power Plant
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query36.24 KB
NIB No. 161 - (158.12 KB) 17th Sep 2015 For setting up a 2 MWp Grid Interactive Solar PV Power Plant at Lanka, Nagaon District of Assam, India.
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query243 KB
PDF icon Clarification no.2 to Bidder’s query88.29 KB
NIB 159 - (327.33 KB) 09th Sep 2015 Supply and delivery of Microsoft office licenses.
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query273.67 KB
PDF icon Clarification no.2 to Bidder’s query214.18 KB
NIB No. 160 - (156.13 KB) 16th Sep 2015 Supply of the mechanical parts required for MI , CI & BI of Units at Agartala Gas Turbine Plant ( Make of Unit: GE make frame V gas turbine supplied by EGT, Model No. G5371(PA)) located in Tripura, India.
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query224.09 KB
PDF icon Clarification no.2 to Bidder’s query115.17 KB
NIB 157 - (1.07 MB) 26th Aug 2015 Appointment of Arranger for Private Placement of the NEEPCO PSU Bonds
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query181.92 KB
PDF icon Clarification no.2 to Bidder’s query255.32 KB
PDF icon Clarification no.3 to Bidder’s query177.74 KB
NIB NO.155 - (152.28 KB) 12th Aug 2015 Consultancy for pre-Initial Public Offer (pre-IPO) advisory services for NEEPCO
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query25.04 KB
NIB NO.142 - (111.95 KB) 23rd Jun 2015 Supply, Installation and Commissioning of Structured Local Area Network (LAN) Equipment at Tuirial Hydro Electric Project, Mizoram and Kimi Power House Complex, Arunachal Pradesh
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query3.46 MB
NIB NO.146 - (95.65 KB) 09th Jul 2015 Supply, Transportation to site, handling and freight, Insurance from the source of supply till receipt at site of LED luminaires for O&M plants of NEEPCO, complete in all respects
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query25.44 KB
NIB NO.143 - (101.22 KB) 23rd Jun 2015 EPC CONTRACT FOR SETTING UP OF 3 MWP GRID INTERACTIVE SOLAR PV POWER PLANT EMPLOYING POLY CRYSTALLINE TECHNOLOGY AT KOPILI,DIMA HASAO DISTRICT, ASSAM, INDIA
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query32.74 KB
PDF icon Clarification no.2 to Bidder’s query21.69 KB
NIB NO.144 - (156.28 KB) 24th Jun 2015 EPC CONTRACT FOR SETTING UP OF 2 MWP GRID INTERACTIVE SOLAR PV POWER PLANT EMPLOYING POLY CRYSTALLINE TECHNOLOGY AT ASSAM DON BOSCO UNIVERSITY, SONAPUR, ASSAM
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query28.69 KB
NIB No.133 - (672.76 KB) 06th May 2015 Empanelment of experienced and capable parties for EPC and Subsequent O & M of PV based solar power plants
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query84.33 KB
NIB NO.129 - (328 KB) 11th Mar 2015 EPC contract for setting up of 2MWP Grid Interactive Solar PV Power Plant employing Poly Crystalline Technology at LANKA, Nagaon District, Assam, India
AttachmentSize
PDF icon Clarification to Bidder’s query41.18 KB
PDF icon Clarification to Bidder’s query41.07 KB
PDF icon Clarification no.3 to Bidder’s query47.92 KB
NIB NO.126 - (132.96 KB) 03rd Mar 2015 Design, Supply, Installation and Commissioning of Hardware and ERP Software along with Implementation of Enterprise Resource Planning, Data Centre Preparation & Disaster Recovery Site Facilities in NEEPCO
AttachmentSize
PDF icon Clarification no.1 to Bidder’s query18.37 KB
PDF icon Clarification no.2 to Bidder’s query56.64 KB
File Clarification no.3 to Bidder’s query2.68 MB
File Clarification no.4 to Bidder’s query602.11 KB
PDF icon Clarification no.5 to Bidder’s query27.52 KB
Package icon Clarification no.6 to Bidder’s query95.23 KB
Package icon Clarification no.7 to Bidder’s query55.33 KB
Package icon Clarification no.8 to Bidder’s query1.08 MB
Package icon Clarification no.9 to Bidder’s query1.64 MB
PDF icon Clarification no.10 to Bidder’s query487.12 KB
PDF icon Clarification no.11 to Bidder’s query18.84 KB
Package icon Clarification no.12 to Bidder’s query102.87 KB
SNIB No.118 Dated.19/12/2014 - (85.41 KB) 19th Dec 2014 Setting up of 2 MWp Grid Interactive Solar PV Power Plant at Lanka,Nagaon District, Assam, India.
AttachmentSize
PDF icon Clarification to prospective Bidder’s query431.94 KB
LIMITED NIB NO. : 101/NEEPCO/2014 - (2.03 MB) 24th Jul 2014 Rural Electrification works of South Tripura district in Tripura
AttachmentSize
PDF icon Clarification No.1 to Pre-Bid Queries65.15 KB
LIMITED NIB NO. : 100/NEEPCO/2014 - (1.95 MB) 24th Jul 2014 Rural Electrification works of Shipahijala district in Tripura
AttachmentSize
PDF icon Clarification No.1 to Pre-Bid Queries65.26 KB
NIB NO.96 - (193.16 KB) 23rd Jun 2014 Environmental and Social Expert Services and Related Activities for Pare Hydro Electric Project.
AttachmentSize
PDF icon Clarification No.1 to Pre-Bid Queries61.74 KB
NIT NEEPCO/ED(CP)/2014-15/01 - (76.15 KB) 04th Jun 2014 Consultancy services for preparation of Risk Management Policy
AttachmentSize
PDF icon Clarification No.2 to Tender Queries40.47 KB
PDF icon Clarification No.1 to Tender Queries206.73 KB
NIB NO.93 - (314.74 KB) 11th Apr 2014 Design, Fabrication, Supply, Erection and Commissioning of Spillway Gates in Khandong Dam of KHEP, Umrongso, Assam.
AttachmentSize
PDF icon Clarification No.3 to Bid Queries70.83 KB
PDF icon Clarification No.2 to Bid Queries89.46 KB
PDF icon Clarification No.1 to Bid Queries52.02 KB
NIB 86 - (102.32 KB) 29th Nov 2013 Supply and installation of IP Video Surveillance Systen
AttachmentSize
PDF icon Clarifications to Bid Queries-II308.72 KB
PDF icon Clarifications to Bid Queries20.08 KB
NIB NO.78 - (269.93 KB) 16th Jul 2013 Preparation of Detailed Project Report and related activities for Siang Upper Hydro Electric Project, Stage-II(3750MW) Arunachal Pradesh, India.
AttachmentSize
Package icon Clarifications to Bid Queries280.82 KB
NIB 76 - (100.15 KB) 03rd May 2013 Supply, Installation and Commissioning of IP Video Surveillance System at Corporate office, Shillong
AttachmentSize
PDF icon Response to Bidder's Query462.27 KB
NIB NO.71 - (7.84 MB) 02nd Nov 2012 EPC Contract for 5MW Grid Interactive Solar PV Power Project at Monarchak,Tripura,India.
AttachmentSize
PDF icon Commercial Clarification90.74 KB
Package icon Pre Bid Clarification Annx I-VIII2.64 MB
PDF icon Commercial Clarification66.56 KB
PDF icon Technical Clarification62.09 KB